You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. AUTOMATED ALL-WEATHER CARGO TRANSFER SYSTEM

    SBC: August Design, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1986 Department of DefenseArmy
  2. CHRONIC DATA ACQUISITION SYSTEM AND PLAYBACK TO COMPUTER

    SBC: August Design, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1986 Department of Health and Human Services
  3. THIS PROJECT WILL STUDY THE FEASIBILITY OF UTILIZING A NOVELMILL/SEPARATOR IN THE PREPARATION OF LOW-ASH COAL.

    SBC: B. Datta Research Inc            Topic: N/A

    THIS PROJECT WILL STUDY THE FEASIBILITY OF UTILIZING A NOVELMILL/SEPARATOR IN THE PREPARATION OF LOW-ASH COAL. TESTING WILL BE PERFORMED IN A BENCH-SCALE, CONTINOUSLY OPERATED MILL. IN A CONVENTIONAL COAL BENEFICIATION CIRCUIT, DESIGNEDTO PRODUCE A LOW ASH PRODUCT. A NUMBER OF UNIT OPERATIONS ARE PERFORMED IN SEPARATE DEVICES. A TYPICAL CIRCUIT WOULD CONSIST OF;(1) SIZE REDUCTION OF THE COAL IN A ...

    SBIR Phase I 1986 Department of Energy
  4. PROCESS STABILITY AND PERFORMANCE VARIABILITY HAS BEEN A MAJOR OBSTACLE IN THE WIDESPREAD COMMERCIALIZATION OF METHANE PRODUCTION OF ANAEROBIC DIGESTION.

    SBC: Biochem Technology Inc.            Topic: N/A

    PROCESS STABILITY AND PERFORMANCE VARIABILITY HAS BEEN A MAJOR OBSTACLE IN THE WIDESPREAD COMMERCIALIZATION OF METHANE PRODUCTION OF ANAEROBIC DIGESTION. THIS PROCESS IS DEPENDENT THERE HAS BEEN A LACK OF ON-LINE MONITORING DEVICES WHICH ACCURATELY ASSESS THE ACTIVITY OF THIS POPULATION. THE EFFORT DESCRIBED IN THIS PROPOSAL IS DESIGNED TO DETERMINE WHETHER IN-SITU MEASUREMENT OF INTRACELLULAR NAD ...

    SBIR Phase I 1986 Department of Energy
  5. THE GOAL OF THIS RESEARCH IS TO DEVELOP A HIGHLY SENSITIVE AND SPECIFIC RADIOIMMUNOASSAY FOR LEUKOTRIENE E4 AND LEUKOTRIENE E4-N-ACETATE, TWO IMPORTANT METABOLITES OF LEUKOTRIENE C4 AND D4.

    SBC: Biomol Research Laboratoryt            Topic: N/A

    THE GOAL OF THIS RESEARCH IS TO DEVELOP A HIGHLY SENSITIVE AND SPECIFIC RADIOIMMUNOASSAY FOR LEUKOTRIENE E4 AND LEUKOTRIENE E4-N-ACETATE, TWO IMPORTANT METABOLITES OF LEUKOTRIENE C4 AND D4. THESE LEUKOTRIENES ARE POTENT BRONCO- AND CORONARY ARTERY VASOCONSTRICTORS, INCREASE VASCULAR PERMEABILITY, STIMULATE MUCUS SECRETION, AND CAUSE LONG-LASTING HYPOTENSION, THUS PLAYING A PATHOPHYSIOLOGICAL ROLE ...

    SBIR Phase I 1986 Department of Health and Human Services
  6. UNDER THE SLOW FREQUENCY AND LONG LIFE CONDITIONS THAT ARE OF INTEREST IN A NUMBER OF ENGINEERING APPLICATIONS THAT INVOLVE CYCLIC LOADING AND ENVIRONMENTAL EXPOSURE (OFFSHORE OIL PLATFORMS, SUBMARINES, SURFACE SHIPS), THE ACQUISITION OF FCGR DATA IN THE

    SBC: Bismarck Inc            Topic: N/A

    UNDER THE SLOW FREQUENCY AND LONG LIFE CONDITIONS THAT ARE OF INTEREST IN A NUMBER OF ENGINEERING APPLICATIONS THAT INVOLVE CYCLIC LOADING AND ENVIRONMENTAL EXPOSURE (OFFSHORE OIL PLATFORMS, SUBMARINES, SURFACE SHIPS), THE ACQUISITION OF FCGR DATA IN THE NEARTHRESHOLD REGIME IS ESPECIALLY DIFFICULT BECAUSE ACCURATE CRACK MEASUREMENTS ARE REQUIRED OVER RELATIVELY LONG-TERM EXPOSURE PERIODS IN AN AG ...

    SBIR Phase I 1986 Department of DefenseNavy
  7. CONTROL OF SURFACE ATTACK BY GALLIUM ALLOYS IN ELECTRICAL CONTACTS

    SBC: Burton Technologies Inc            Topic: N/A

    AN EXPERIMENTAL APPARATUS WILL BE FABRICATED FOR INSTRUMENTED OPERATION OF CURRENT COLLECTORS IN CONTROLLED ATMOSPHERES. TERNARY ALLOYS OF GALLIUM, INDIUM AND TIN WILL BE MADE AND APPLIED TO SURFACES OF THE CURRENT COLLECTORS AND SUBJECTED TO OPERATION, ACCOMPANIED BY OBSERVATION OF FRICTION, WEAR, CONTACT RESISTANCE, AND CHEMICAL COMPOSITION OF THE FILM AND WEAR DEBRIS. INFORMATION OBTAINED WILL ...

    SBIR Phase II 1986 Department of DefenseNavy
  8. THIS PROJECT WILL INVESTIGATE THE DESIGN AND FEASIBILITY OF VARIOUS USER INTERFACES FOR THE CONTRAST EXPERT SYSTEM SURRENTLY UNDER DEVELOPMENT.

    SBC: Carnegie Federal Sys Corp            Topic: N/A

    THIS PROJECT WILL INVESTIGATE THE DESIGN AND FEASIBILITY OF VARIOUS USER INTERFACES FOR THE CONTRAST EXPERT SYSTEM SURRENTLY UNDER DEVELOPMENT. CONTRAST IS A KNOWLEDGE-BASED COMPUTER CONSULTANT DESIGNED TO ASSIST NMR RADIOLOGISTS IN THE TASK OF SELECTING SCANNING PARAMETERS THAT OPTIMIZE DIAGNOSTICALLY USEFUL CONTRAST IN THE RESULTANT IMAGES. THIS PHASE I STUDY WILL EXPLORE FEASIBLE ALTERNATIVES F ...

    SBIR Phase I 1986 Department of Health and Human Services
  9. INOCULTION TECHNIQUES FOR FOREST MUSHROOMS LPRODUCTIONS

    SBC: Carolina Agro-tech Corp.            Topic: N/A

    THE FOREST MUSHROOM (SHIITAKE) IS THE ONLY GOURMENT CLASS OFMUSHROOM THAT CAN BE COMMERCIALLY CULTIVATED. IT IS P PRIMARILY GROWN IN JAPAN, PRINCIPALLY BY OVER 170,000 SMALL LOT GROWERS. THE CURRENT ANNUAL WORLD AND U.S. MARKETS E EXCEEDS $1.58 BILLION AND $10 MILLION RESPECTIVELY. IN R RURAL SOUTHEAST UNITED STATES OVER 2 MILLION PRIVATE NON- INDUSTRIAL FOREST LAND OWNERS OWN OVER 70% OF THE COMM ...

    SBIR Phase II 1986 Department of Agriculture
  10. THIS PROJECT WILL DEVELOP THE ARCHITECTURE FOR A PROTOTYPE INTELLIGENT EMBEDDED TRAINER FOR A P-3C SENSOR STATION OPERATOR.

    SBC: CHI SYSTEMS INC            Topic: N/A

    THIS PROJECT WILL DEVELOP THE ARCHITECTURE FOR A PROTOTYPE INTELLIGENT EMBEDDED TRAINER FOR A P-3C SENSOR STATION OPERATOR. THE EMBEDDED TRAINER PROVIDES THE OPERATOR WITH SIMULATED ANTI-SUBMARINE WARFARE (ASW) PROBLEMS TO SOLVE, AND PROVIDES ADDITIONAL TRAINING AS NEEDED BY DIAGNOSING THE SOURCES OF ERRORS OR POOR PERFORMANCE IN THE SIMULATED PROBLEMS. THIS DIAGNOSIS IS DONE BY COMPARING THE OPER ...

    SBIR Phase I 1986 Department of DefenseNavy
US Flag An Official Website of the United States Government