You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Electronically Tunable High-Power Infrared Lasers for Standoff Detection Applications
SBC: Pranalytica, Inc. Topic: A14AT015In response to the Army STTR Topic A14A-T015 solicitation for tunable high-power LWIR lasers for standoff detection applications, Pranalytica proposed to develop a compact, rugged and highly reliable wavelength tunable quantum cascade laser (QCL) module delivering over 5W of peak power and over 0.5W of average power in the spectral region spanning from 7 to 11m. The proposed approach is based on a ...
STTR Phase II 2016 Department of DefenseArmy -
Hybrid Battery/Supercapacitor Energy Storage Device
SBC: ADA TECHNOLOGIES, INC. Topic: A15AT010ADA Technologies, Inc. (ADA) and Dr. Massoud Pedram at the University of Southern California (USC) have successfully completed a Phase I STTR effort for the development of a lithium ion (Li-ion)/ supercapacitor hybrid electrical energy storage system (HEESS) to afford pulse power characteristics (projected ~10 kW/kg) in a high energy system (100-150 Wh/kg). The system is enabled via a constant cur ...
STTR Phase II 2016 Department of DefenseArmy -
High Gain, High Power PCSS with Integrated Monolithic Optical Trigger
SBC: NESS ENGINEERING, INC. Topic: A14AT004The objective of this Phase II proposal is to continue the development of a Photoconductive Semiconductor Switch (PCSS) with an integrated optical trigger that can switch at least 30 kV, 1 kA, 20 ns pulses with jitter 108 shots. Ness Engineering, Inc. (NEI) and Texas Tech University (TTU) propose to utilize wide bandgap materials to demonstrate lock-on switching and allow much less optical trigger ...
STTR Phase II 2016 Department of DefenseArmy -
Vacuum Integrated System for Ion Trapping
SBC: COLDQUANTA, INC. Topic: A15AT009We propose to develop a compact, integrated ion trap quantum system for quantum sensor, timekeeping, and computing applications. To do so, we leverage ColdQuantas expertise in miniature ultra-high vacuum (UHV) and atom chip technology and Duke Universitys expertise in microfabricated surface ion traps and quantum information processing experiments. We will produce a manufacturable, commercializa ...
STTR Phase II 2016 Department of DefenseArmy -
Parallel Two-Electron Reduced Density Matrix Based Electronic Structure Software for Highly Correlated Molecules and Materials
SBC: Q-CHEM INC Topic: A14AT013Variational two-electron reduced-density-matrix (v2RDM) methods can provide a reference-independent description of the electronic structure of many-electron systems that naturally captures multireference correlation effects. These methods offer one of the few possible routes to performing the large-active-space computations that are necessary for the qualitative description of strongly-correlated ...
STTR Phase II 2016 Department of DefenseArmy