You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. AI for Health Supply Chain Optimization

    SBC: MACRO-EYES INC            Topic: X224OCSO1

    Macro-Eyes predicts the utilization of health goods and services in the weeks/months ahead by leveraging its expertise in utilizing and analyzing supervised and unsupervised machine learning to track and derive signal across multiple dimensions of data: natural language, photographs, satellite imagery, routinely collected and publicly available data, qualitative survey data, and atmospheric data. ...

    SBIR Phase I 2023 Department of DefenseAir Force
  2. Electromagnetic-Pulse Protected Electronics Enclosures

    SBC: IMPOSSIBLE OBJECTS, INC.            Topic: X224OCSO1

    Typically, anti-EM warfare protection is done by enclosing all electronics in metal electrical boxes.  However, this strategy is limited in several ways:  Firstly, many electronics boards must fit into tight spaces, where the typical machined-metal boxes either can’t fit or cost significant amounts of money to be manufactured; secondly, many electrical boards can overheat when enclosed in a bo ...

    SBIR Phase I 2023 Department of DefenseAir Force
  3. Human-Interpretable ML for Certification and Sustainment of Fatigue-Critical AM Components

    SBC: QUESTEK INNOVATIONS LLC            Topic: AF21ATCSO2

    To aid in Air Force design and sustainment activities of additively manufactured components, QuesTek Innovations LLC, in collaboration with the University of Utah, will further develop and mature an accurate, efficient, and comprehensive fatigue life mode

    STTR Phase II 2023 Department of DefenseAir Force
  4. Composite Based Additive Manufacturing Scaling of Throughput, Volume, and Speed

    SBC: IMPOSSIBLE OBJECTS, INC.            Topic: AF21ATCSO1

    The current Phase II project is expanding the CBAM material offerings to include uniaxial carbon-fiber substrates into the CBAM process.  It has already been shown that the strength and stiffness have improved by at least 250-300% (3.5-4x stronger and sti

    STTR Phase II 2023 Department of DefenseAir Force
  5. Molecularly Imprinted Polymers for a Real-Time PFAS Sensor

    SBC: Aquagga, Inc.            Topic: X22DOTCSO1

    Per- and polyfluoroalkyl substances (PFAS) have been used extensively for DoD firefighting applications due to their thermochemical stability and unique properties. PFAS are long-lived in the environment and coming under increased regulatory scrutiny due

    STTR Phase II 2023 Department of DefenseAir Force
  6. Alternate GPS Technology for Medical Drones

    SBC: MACRO-EYES INC            Topic: X224OCSO1

    Macro-Eyes is the artificial intelligence company bringing state-of-the-art predictive intelligence to infrastructure in challenging environments, saving lives and preserving resources where other models have failed utilizing spatio-temporal graph neural networks. Macro-Eyes is able to provide Alt-PNT in the absence of GPS using its predictive intelligence. The DoD  is the largest customer for ...

    SBIR Phase I 2023 Department of DefenseAir Force
  7. High Speed Metal 3D-Printing

    SBC: IMPOSSIBLE OBJECTS, INC.            Topic: X224OCSO1

    There are a multitude of metal 3D-printing technologies on the market today.  While many of these technologies provide significant advantages in certain areas, they all share two points in common: they are slow and size-limited. This limits the usefulness of these technologies for all but the slowest, highest-value applications.  IO is proposing to adapt its high-speed high-tolerance CBAM techn ...

    SBIR Phase I 2023 Department of DefenseAir Force
  8. Skyview Next Generation Virtual Lab

    SBC: Intrinsic Enterprises Inc            Topic: X224OCSO1

    Skyview is a Continuous Integration Continuous Delivery (CI/CD) virtual test platform for modern hardware emulation and rapid software test orchestration. Born out of the commercial aviation and agriculture industry, Skyview maximizes the latest commercially available CI/CD technologies to perform rapid software test orchestration at enterprise scale, eliminating software errors before they reach ...

    SBIR Phase I 2023 Department of DefenseAir Force
  9. Nautilus Capture Mechanism Configuration: A Study to Compare Tolerances of Electrostatic and Gecko-like Adhesion of Spacecraft Docking System for Long-Duration Space Missions

    SBC: STARFISH SPACE, INC.            Topic: AF21STCSO1

    Starfish Space is developing the Nautilus capture mechanism, an end-effector that enables non-destructive capture of unprepared spacecraft surfaces using electrostatic adhesion. We are developing this universal docking hardware to enable In-Space Servicin

    STTR Phase II 2023 Department of DefenseAir Force
  10. TourniTek: Pre-Hospital Thermal Regulation For The Prolonged Field Care of Traumatic Injuries

    SBC: TOURNITEK INC            Topic: AF21ATCSO1

    TourniTek and the University of California at San Francisco propose to design, build, and test a portable chiller for the prolonged field care of traumatic limb injuries. Using thermal regulation, injured limbs may be preserved in the field until patients

    STTR Phase II 2023 Department of DefenseAir Force
US Flag An Official Website of the United States Government