You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Decentralized Asset Control for Layered Sensing

    SBC: TOYON RESEARCH CORPORATION            Topic: AF112139

    ABSTRACT:Toyon Research Corporation proposes to develop a decentralized asset management framework which will provide near-optimal loose cooperative control of diverse assets within the Layered Sensing Architecture. We propose to develop an asset manager which will perform allocation, assignment, vehicle routing, target prediction, and sensor tasking for a heterogeneous collection of assets while ...

    SBIR Phase II 2015 Department of DefenseAir Force
  2. SAGES II: System Acquisition Guidance from Expert Systems

    SBC: APTIMA INC            Topic: AF112019

    ABSTRACT:The high costs and inherent dangers of live training with air platforms have motivated the increasing use of simulation-based training. However, selecting a system to effectively meet training objectives can be challenging, particularly one that must blend multiple disparate technologies. Among these challenges is the need to acquire visual display systems that optimally support training ...

    SBIR Phase II 2015 Department of DefenseAir Force
  3. Cognitive System Accelerator of Knowledge Gain in Human-computation-sensor Analytic Systems

    SBC: ETEGENT TECHNOLOGIES, LTD.            Topic: AF112026

    ABSTRACT:In an attempt to address the data overload challenge significant work has been conducted studying the human factors and cognitive science issues related to exploitation of big data. Also, significant investment has been made in automated or autonomous processing/exploitation capability. It is clear that no matter how efficiently the human cognitive ability is applied to manually interpret ...

    SBIR Phase II 2015 Department of DefenseAir Force
  4. Programmable Picosat Transceiver

    SBC: TETHERS UNLIMITED, INC.            Topic: AF112072

    ABSTRACT:The goal of the Space Test Program is to enable the US Air Force to rapidly develop emerging space technologies by providing economical flight opportunities to increase a technologys TRL. Over the past decade, the CubeSat form factor has emerged as an economical platform for testing technologies that can be packaged within the 10x10x30 cm form factor. However, the lack of a programmable S ...

    SBIR Phase II 2015 Department of DefenseAir Force
  5. Miniature High-Altitude Precision Navigation Alternative

    SBC: Systems & Technology Research LLC            Topic: AF121091

    ABSTRACT:Todays advanced precision guided weapons rely on GPS/INS-based solutions to provide accurate navigation data, enabling the munition to adjust its path to reach the target.While this approach is effective when GPS is available, new approaches are needed that can achieve accurate navigation when operating in a GPS-denied environment.In response, vendors are developing new navigation-aiding ...

    SBIR Phase II 2015 Department of DefenseAir Force
  6. High-Speed Weapon Radomes

    SBC: FIRST RF CORPORATION            Topic: AF121092

    ABSTRACT:As more and more advanced hypersonic weapons are developed, vehicle temperatures are expected to near 1250K (977C); as flight times increase, these temperatures are expected to saturate the entire vehicle.Typically, forward-looking RF and IR sensors are collocated in the same protective radome, which degrades the performance of both systems.FIRST RF proposes a significantly different appr ...

    SBIR Phase II 2015 Department of DefenseAir Force
  7. Mobile Target Secondary Debris (MTSD)

    SBC: KARAGOZIAN & CASE, INC.            Topic: AF121095

    ABSTRACT:The objective of the project is to develop models for secondary debris generated by mobile targets. This includes the vehicle component breakup due to expanding high explosives and primary fragments as well as the associated airblast that propagates into the environment propelling secondary fragments from the vehicle. The overall scope of the project involves developing the computational ...

    SBIR Phase II 2015 Department of DefenseAir Force
  8. Weapon Burial Secondary Debris (WBSD)

    SBC: ACTA, LLC            Topic: AF121097

    ABSTRACT:Most of the air delivered air force weapons are designed to detonate inside structures.However, due to targeting inaccuracies and other reasons they may land outside a structure and could detonate partially or fully buried in soil.These events could result in collateral damage to people, vehicles in the vicinity.Air force would like to have a fast running capability to assess the risk due ...

    SBIR Phase II 2015 Department of DefenseAir Force
  9. Autonomous Situational Awareness for Munitions

    SBC: Technology Service Corporation            Topic: AF121106

    ABSTRACT:The Munitions Environment Signature Model being developed by TSC will provide munitions design engineers with a tool for exploring RF fuze sensor alternatives by modeling the dynamic multistatic coherent RF signatures of targets illuminated by munition fuze sensors at sub-millimeter wavelengths. Output generated by the MESM will be suitable for use with radar imaging techniques including ...

    SBIR Phase II 2015 Department of DefenseAir Force
  10. Improved Real Time Geo-Registration Techniques For Airborne Imagery

    SBC: TOYON RESEARCH CORPORATION            Topic: AF121139

    ABSTRACT:Toyon Research Corporation proposes research and development of advanced algorithms and real-time software to provide significant improvements in geo-registration for wide area motion imagery (WAMI) systems such as ARGUS-IS, Gorgon Stare, and Blue Devil. The proposed algorithms perform joint processing of information extracted from the WAMI imagery and information extracted from typical n ...

    SBIR Phase II 2015 Department of DefenseAir Force
US Flag An Official Website of the United States Government