You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. VIPART: Verifiability, Identifiability Physical Assets for Real-time Traceability

    SBC: INDIANA TOOL & MFG. CO., INC.            Topic: SB162004

    The objective of this work is to create permanent, auditable, digital records for aviation related manufactured parts and components across their lifecycle. This effort builds on the successful outcomes and Blockchain best practices from SBIR I that have been validated by the US Navy (ref). The main benefit of the proposed approach is for asset traceability of lifecycle events, visibility into the ...

    SBIR Phase II 2020 Department of DefenseNavy
  2. Aircrew-Mounted Self-Adjusting Tether System

    SBC: WOLF TECHNICAL SERVICES INC            Topic: N171026

    Wolf is developing an aircrew-mounted helicopter restraint system for mobile aircrew that prevents ejection from the aircraft and provides crash and fall protection. It attaches to any D-ring currently used to attach the gunner's belt, and requires no modification to the aircraft to use. It automatically manages the slack between the aircrew and the attachment point. It senses motion associated wi ...

    SBIR Phase II 2019 Department of DefenseNavy
  3. Submarine Shipboard Power Supply Bridge

    SBC: PC KRAUSE & ASSOCIATES INC            Topic: N171075

    The objective of this effort is to construct and test a 40 kW UPS with at least 100ms of holdup time, integrated into a standard 19 inch rack mount enclosure with 4U (7 inch) height, and designed to meet electrical and mechanical/shock specifications required for naval shipboard application. Traditional UPS applications are typically not optimized for weight and volume, and utilize bulky lead-acid ...

    SBIR Phase II 2019 Department of DefenseNavy
  4. Prime Power System Development for Active Denial Technology (ADT) and High-Power Radio-Frequency (RF) Systems

    SBC: CANDENT TECHNOLOGIES INCORPORATED            Topic: N132086

    Solid state RF and millimeter wave weapons systems require substantial power to operate. Pure solid state systems have limited energy density and require charging over the typical use cycle. The directed energy system must be compact enough to mount on a vehicle such as a HMMWV, a small trailer or a structure such as found within an embassy compound. Current power systems are much too large and he ...

    SBIR Phase II 2019 Department of DefenseNavy
  5. Shipboard Dimensional Analysis Tool (SDAT)

    SBC: DESIGN MILL, INC.            Topic: N172101

    Shipboard Dimensional Analysis Tool (SDAT) will enable transportability assessments of candidate vehicle designs aboard Naval ships prior to prototyping. SDAT will integrate three-dimensional (3D) ship and vehicle data, enable users to place and visualize vehicles and their path within ship vehicle stowage spaces and on ramps, enable collision detection based on a user-defined clearance, assess ph ...

    SBIR Phase II 2019 Department of DefenseNavy
  6. Power Factor Correction

    SBC: PC KRAUSE & ASSOCIATES INC            Topic: N181005

    The primary objective of this Phase II proposal is to further develop and demonstrate a lightweight passive power factor compensation unit utilizing advanced high-temperature magnetic materials and design techniques to achieve power quality improvement for a 65 kVA, 115V, 400-Hz aircraft power system. Based on identified system problems in the F-18 Super Hornet platform, the compensation system mu ...

    SBIR Phase II 2019 Department of DefenseNavy
  7. Optical Device for Sorting Particles by Size

    SBC: En'urga Inc.            Topic: NA

    This Phase II SBIR project will continue the development of an optical sorter that will be used to estimate drop sizes in sprays. The optical sorter will determine the size of drops in the 0.1 to 10 microns range. Drops in this size range are prevalent in the automobile industry, where the fuel injection pressures have increased tremendously over the past two decades. These newer injectors provide ...

    SBIR Phase II 2018 Department of CommerceNational Institute of Standards and Technology
  8. Reduced Cavitation, High Efficiency Outboard Propulsors for Small Planing Craft

    SBC: CANDENT TECHNOLOGIES INCORPORATED            Topic: N17AT019

    The Candent Technologies “Reduced Cavitation, High Efficiency Outboard Propulsor for Small Planing Craft” Phase II program is structured to develop an advanced waterjet propulsor for the Combat Rubber Raiding Craft (CRRC). This new axial flow waterjet propulsion system is designed as a “bolt on” assembly that replaces the lower unit of the existing MFE 55 outboard motor. This new propulsio ...

    STTR Phase II 2018 Department of DefenseNavy
  9. High Density, High Efficiency Electrical Power Generation

    SBC: PC KRAUSE & ASSOCIATES INC            Topic: N103207

    The movement to more-electric architectures during the past decade in military and commercial airborne systems continues to increase the complexity of designing and specifying the electrical power system in such architectures. In particular, electrical starter/generators (ES/G) on airborne systems have become much more complex in terms of design due to growth in electrical power and energy require ...

    SBIR Phase II 2018 Department of DefenseNavy
  10. Aircraft Electrical Power System Diagnostics and Health Management

    SBC: PC KRAUSE & ASSOCIATES INC            Topic: N06T007

    The main focus of the proposed SBIR Phase II effort is the expansion of the EPIDS diagnostic and prognostic monitoring capability to the V-22 constant frequency generators. The design of the EPIDS for the variable frequency generators will be leveraged and modified with additional sensors and updated with diagnostics algorithms specific to the CFG. PCKA plans to test the CFG EPIDS in a laboratory ...

    SBIR Phase II 2017 Department of DefenseNavy
US Flag An Official Website of the United States Government