You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. AN ENVIRONMENT FOR SIMULATION MODELING OF DISTRIBUTED SYSTEMS

    SBC: INNOVATIVE RESEARCH, INC.            Topic: N/A

    THE DEVELOPMENT OF SIMULATION MODELS OF A DISTRIBUTED SYSTEMS AND THEIR MAPPING INTO A PARALLEL SYSTEM, IS A HIGHLY COMPLEX TECHNICAL TASK BECAUSE OF THE GREAT INFLUENCE ITS VARIOUS ELEMENTS WILL HAVE ON ITS PERFORMANCE. THERE ARE MAJOR TECHNICAL ISSUES INVOLVED IN PERFORMING SUCH COMPLEX SIMULATION EFFORT, INCLUDING UNIQUE REQUIREMENTS SIMULATION MODELS, VARIED ARCHITECTURAL CONCEPTS OF DISTRIBUT ...

    SBIR Phase II 1991 Department of DefenseArmy
  2. FRACTAL IMAGE COMPRESSION TECHNIQUES

    SBC: Iterated Systems, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1991 Department of DefenseArmy
  3. TASK NETWORK MODELING OF HUMAN OPERATIONS IN NUCLEAR POWER PLANT CONTROL ROOMS

    SBC: Micro Analysis & Design Inc            Topic: N/A

    N/A

    SBIR Phase I 1991 Nuclear Regulatory Commission
  4. ECM RESISTANT GLOBAL POSITIONING SYSTEM (GPS) RECEIVER

    SBC: THE NAVSYS CORPORATION            Topic: N/A

    GPS IS PLANNED TO BE USED BY THE U.S. ARMY IN A VARIETY OF TACTICAL SCENARIOS. FIRE CONTROL APPLICATIONS ARE CURRENTLY BEING INVESTIGATED WHERE GPS WOULD BE USED TO TRACK REGISTRATION ROUNDS AND LOCATE RADIOSONDES. SINCE GPS IS A RADIONAVIGATION SYSTEM, ITS EFFECTIVENESS IN A TACTICAL ENVIRONMENT IS LIMITED BY ITS SUSCEPTIBILITY TO ELECTRONIC COUNTERMEASURES (ECM). IT IS PARTICULARLY DIFFICULT TO ...

    SBIR Phase I 1991 Department of DefenseArmy
  5. A PORTABLE FM-CW DOPPLER RADAR TO PROVIDE METEOROLOGICAL DATA IN THE FIELD

    SBC: Ophir Corporation            Topic: N/A

    A PORTABLE, LOW COST FM-CW DOPPLER WEATHER RADAR IS PROPOSED TO PROVIDE "REAL-TIME" METEOROLOGICAL DATA IN THE FIELD. SUCH A SYSTEM WOULD ASSIST BATTLEFIELD DECISION MAKING BY MONITORING CONDITIONS PERTINENT TO MICROWAVE DUCTING, ARTILLERY CONTROL, AND DETERMINING LOCAL WEATHER. CURRENT DOPPLER WEATHER RADARS TEND TO BE PULSED, VERY LARGE, AND TO COST MILLIONS OF DOLLARS; THEY REQUIRE A LARGE OPER ...

    SBIR Phase I 1991 Department of DefenseArmy
  6. AEROBALLISTIC DATA ACQUISITION SYSTEM (ADACS)

    SBC: Q-DOT, INC.            Topic: N/A

    N/A

    SBIR Phase I 1991 Department of DefenseArmy
  7. NOVEL SORBENTS FOR CHEMICAL WARFARE AGENTS

    SBC: TDA RESEARCH, INC.            Topic: N/A

    N/A

    SBIR Phase I 1991 Department of DefenseArmy
  8. APPLICATIONS OF NEW CHEMICAL HEAT SOURCES

    SBC: TDA RESEARCH, INC.            Topic: N/A

    N/A

    SBIR Phase I 1991 Department of DefenseArmy
  9. QUANTIFICATION OF CONSERVATISMS IN SEISMIC RISK ESTIMATES THROUGH ENGINEERING ADVANCEMENT OF SEISMIC PRA

    SBC: Risk Engineering Inc.            Topic: N/A

    SIGNIFICANT CONSERVATISM IN MODERN SEISMIC PRA DERIVES FROM SIMPLIFICATIONS IN GROUND-MOTION CHARACTERIZATION AT THE INTERFACE OF SEISMIC HAZARD AND FRAGILITY METHODOLOGIES. THIS CONSERVATISM ARISES BECAUSE A SINGLE COMPOSITE-MAGNITUDE, BROAD-BAND, GROUND-MOTION SPECTRUM IS USED TO DERIVE FRAGILITY FUNCTIONS, WHEREAS THE MAJORITY OF MOTIONS CONTRIBUTING TO SITE HAZARD HAVE (LESS-DAMAGING) NARROW-B ...

    SBIR Phase II 1991 Nuclear Regulatory Commission
  10. LOW COST LIGHT WEIGHT OPTICAL COMPONENTS FOR APPLICATION TO INFRARED DETECTION DEVICES

    SBC: ROCKY MOUNTAIN INSTRUMENT CO.            Topic: N/A

    THE OBJECTIVE OF THIS PROPOSED PROGRAM WILL BE TO SELECT LOW COST, LIGHT WEIGHT MATERIALS TRANSMITTING IN THE INFRARED AND THEN TO DESIGN AND MAKE THE COMPONENTS, AND THE COATINGS THAT ARE SPECIFIED FOR FTIR DETECTION (WINDOWS, BEAMSPLITTERS, AND LENSES). THE INVESTIGATIONS WILL BE DIRECTED TOWARDS THE REVIEW OF MATERIAL TECHNOLOGIES SUCH AS GE-BASED CHALCOGENIDES AND PLASTICS TO ACHIEVE THE SELEC ...

    SBIR Phase I 1991 Department of DefenseArmy
US Flag An Official Website of the United States Government