You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. INDIRECT FIRE WEAPON SIMULATON

    SBC: Coleman Research Corp.            Topic: N/A

    THE OBJECTIVE OF OUR PHASE I EFFORT IS TO EXPLORE TECHNIQUES, AND DEVELOP APPROACHES TO PROVIDE SAFE REAL-TIME AUDIOVISUAL CUES FOR THE INBOUND AND IMPACT NOISES, CONCUSSION, DEBRIS, FLASH (NIGHT VISIBLE), SMOKE, AND DUST OF INDIRECT FIRE WEAPONS USED IN TRAINING AT THE NATIONAL TRAINING CENTER (NTC). THE APPROACHES WILL PERMIT DIRECT INTERACTION OF FIRE SUPPORT TEAMS, BE COMPATIBLE WITH MILES, AN ...

    SBIR Phase II 1993 Department of DefenseArmy
  2. IMPROVED STEADY-STATE INITIALIZATION ALGORITHMS FOR COMPUTER CODES

    SBC: Compu Simulation & Anal I            Topic: N/A

    CSA PROPOSES TO DESIGN AND IMPLEMENT A STEADY-STATE SOLUTION FOR THE COMPLETE SYSTEM OF EQUATIONS SOLVED IN EITHER THE TRAC/PF1, TRAC/BD1, OF RELAP5 CODES. THE STEADY-STATE SOLUTION WILL UTILIZE THE STEADY-STATE FORM OF THE MODEL EQUATIONS AND WILL UTILIZE EXISTING EQUATION SOLVERS TO THE EXTENT POSSIBLE. ALL TIME-DEPENDENT CONSTITUTIVE AND COMPONENT MODELS WILL BE INCLUDED IN THE SOLUTION TO ENSU ...

    SBIR Phase II 1993 Nuclear Regulatory Commission
  3. ELECTRONIC COMBAT DIGITAL SIMULATION WORKSTATION

    SBC: COMPUTER SCIENCE & APPLICATIONS            Topic: N/A

    THE AIR FORCE CHIEF OF STAFF HAS DIRECTED PROGRAM OFFICES, OPERATING COMMANDS, AND TEST ORGANIZATIONS TO EMPLOY A DISCIPLINED TEST PROCESS THROUGHOUT ALL PHASES OF ELECTRONIC COMBAT (EC) SYSTEMS DEVELOPMENT AND MODIFICATION. THE EC TEST PROCESS CONSISTS OF DISCIPLINED EARLY EVALUATION TO DETERMINE IF THE SYSTEM UNDER DEVELOPMENT WILL MEET USER NEEDS FOLLOWED BY RIGOROUS TESTING AND EVALUATION TO D ...

    SBIR Phase II 1993 Department of DefenseAir Force
  4. ATDA STRUCTURE AND ARCHITECTURE FOE AUTOMATED IMAGE INTERPRETATION

    SBC: Di/mac Technologies, Inc.            Topic: N/A

    The goal of this project is to develop new approaches and innovative ideas, which are needed to represent oceangraphic satellite imagery using data structures of software architecture that facilitate storage, transmission, processing throughput and accuracy of automated analysis results. Wavelet representation provides a unified framework for techniques including image features analysis, image com ...

    SBIR Phase I 1993 Department of DefenseNavy
  5. SEISMIC MONITORING SYSTEM FOR LOCAL AND REGIONAL NETWORK

    SBC: ENSCO Inc            Topic: N/A

    THE DEVELOPMENT OF A COMPUTERIZED SYSTEM FOR MONITORING LOCAL AND REGIONAL SEISMIC EVENTS IS PROPOSED. THIS AUTOMATED SYSTEM WILL INCORPORATE MANY OF THE ADVANCED SEISMIC ANALYSIS TECHNIQUES THAT CAN ONLY BE FOUND IN SPECIALIZED AND LARGE SYSTEMS FOR MONITORING UNDERGROUND NUCLEAR EXPLOSIONS THROUGHOUT THE WORLD. AMONG THE STATE-OF-THE-ART METHODOLOGIES WE WILL INTEGRATE INTO THE SYSTEM ARE THE NE ...

    SBIR Phase I 1993 Nuclear Regulatory Commission
  6. DEVELOPMENT OF A FLIGHT SIMULATOR VISUAL SYSTEM RECORDING/EVALUATION DEVICE

    SBC: Epic Sales, Inc. Dba Epic Systems            Topic: N/A

    TECHNOLOGICAL ADVANCES HAVE PLACED GREATER DEMANDS ON ABILITY TO MAINTAIN TOLERANCES ON SIMULATOR SUBSYSTEMS (E.G., RESPONSES OF VISUAL AND MOTION BASE SYSTEMS AND THEIR INTERACTION). A SYSTEM TO RECORD VISUAL SCENES IN FLIGHT SIMULATORS, WHICH INCLUDES MAN-INTHE-LOOP, IS NEEDED FOR RDTE AND ACQUISITION OF THESE TRAINING SYSTEMS. SUCH A SYSTEM WOULD BE EMPLOYED TO DETECT CHANGES IN SYSTEM OUTPUT ( ...

    SBIR Phase II 1993 Department of DefenseNavy
  7. DEVELOPMENT OF A NON-INTRUSIVE COGNITIVE WORKLOAD MEASUREMENT DEVICE

    SBC: Epic Sales, Inc. Dba Epic Systems            Topic: N/A

    THE ACCELERATING TEMPO OF MILITARY OPERATIONS INCREASES THE TASK DEMANDS AND WORK RELATED STRESSES IMPOSED ON HUMAN OPERATORS. AS NEW TECHNOLOGICAL DESIGNS ARE INCORPORATED INTO MILITARY SYSTEMS, A METRIC IS REQUIRED TO ENSURE THAT HUMAN COGNITIVE WORKLOAD LIMITS ARE NOT EXCEEDED. SOME PROGRESS IN THIS ENDEAVOR HAS BEEN ACHIEVED IN USING AS OBJECTIVE WORKLOAD INDICATORS A VARIETY OF ELECTROPHYSIOL ...

    SBIR Phase II 1993 Department of DefenseNavy
  8. ISOPERFORMANCE AS A FRAMEWORK FOR HUMAN SYSTEMS INTEGRATION

    SBC: Epic Sales, Inc. Dba Epic Systems            Topic: N/A

    ISOPERFORMANCE METHODOLOGY IS A SET OF FORMAL RELATIONS (TRADE-OFF FUN CTIONS) AMONG THE DETERMINANTS OF PERFORMANCE; IT IS DERIVED BY FIXING A DESIRED LEVEL OF PERFORMANCE AND THEN SOLVING FOR COMBINATIONS OF THE DETERMINANTS SUFFICIENT TO PRODUCE THAT LEVEL. THE ISOPERFORMANCE IDEA IS NOT ORIGINAL WITH THIS PROPOSAL. WHAT IS ORIGINAL HERE IS ITS USE AS A FRAMEWORK TO GUIDE THE ACQUISITION AND DE ...

    SBIR Phase II 1993 Department of DefenseAir Force
  9. Augmentation of the Basic Attributes with Tests of Temporal Acuity

    SBC: Epic Sales, Inc. Dba Epic Systems            Topic: N/A

    Our industrialized society places a premium on the visually-based ability to resolve fine-spatial detail in the environment. But the perceptual demands of new aircraft display systems, and indeed the tasks of out-the-window performances (landing, low-level attack, etc.) in aviation may involve temporal acuity (e.g., motion perception) as much as spatial acuity. Further, an inability to "switch" at ...

    SBIR Phase I 1993 Department of DefenseAir Force
  10. Glass Host Dye Laser

    SBC: GELTECH, Inc.            Topic: N/A

    Currently, dye lasers use dyes that are dissolved in a solvent and then flowed througha cell or jet. Although this is a successful solution to achieve a working dye lser system with tunability over a broad spectrum, there are also significant limitations to the full realization of the potentail ofthis medium. Primarily, liquid hosts adversely affect the thermodynamic, spectroscopic, and kinetic pr ...

    SBIR Phase I 1993 Department of DefenseDefense Advanced Research Projects Agency
US Flag An Official Website of the United States Government