You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
STUDIES
SBC: Amerasia Technology, Inc. Topic: N/ATHERE ARE TWO TYPES OF ELECTRONIC COUNTERMEASURE SYSTEMS -ACTIVE AND PASSIVE (ECM). THE PASSIVE ECM USES CHAFF, DECOYS, AND RADAR CROSS-SECTION REDUCTION, AND FOR THE ACTIVE NOISE JAMMERS, AND REPEATER JAMMER. IN THIS PROPOSAL, AN ACTIVE ECM IS PROPOSED WHICH USES A MINIATURE DIGITAL RF MEMORY (DRFM) AS ACTIVE CHAFF IN THE BALLISTIC MISSILE ENVIRONMENT. THIS MINIATURE DRFM UTILIZES STATEOF-THE-ART ...
SBIR Phase I 1985 Department of DefenseAir Force -
SURFACE ACOUSTIC WAVE CHIRP TRANSFORM CORRELATOR FOR SCORING RECEIVER DEVELOPMENT
SBC: Amerasia Technology, Inc. Topic: N/AN/A
SBIR Phase I 1985 Department of DefenseAir Force -
MODELING AND ANALYSIS
SBC: Anatech International Corp. Topic: N/AALTHOUGH FINITE ELEMENT CODES UTILIZING ELASTIC-PLASTIC-FRACTURING MODELS FOR CONCRETE STRUCTURAL ANALYSIS HAVE BEEN IN USE FOR NEARLY TWO DECADES, SEVERE STRUCTURAL DAMAGE INVOLVING SPALLING AND BREAKUP HAS REMAINED COMPUTATIONALLY INTRACTABLE. THIS PROPOSAL IS AIMED AT THE DEVELOPMENT OF A COMPUTATIONAL CAPABILITY FOR THE ANALYSIS OF REINFORCED CONCRETE STRUCTURES SUBJECTED TO SEVERE STRUCTURAL ...
SBIR Phase I 1985 Department of DefenseAir Force -
DEFINITION AND ASSESSMENT
SBC: Apollo Systems Technology Inc Topic: N/AA REQUIREMENT EXISTS (1) TO DEFINE/ASSESS PHYSICAL SECURITY THREATS TO THE SMALL ICBM HARD MOBILE LAUNCHER (HML) AS POSED BY TERRORIST AND PARAMILITARY GROUPS ADN (2) TO COUNTER AGAINST THESE THREATS. THREAT DEFINITION CHARACTERIZES POTENTIAL THREATS BASED ON A REVIEW OF EXISTING DOCUMENTS WHICH SUMMARIZE PAST TERRORIST ACTIVITY. THREAT CONSIDERATIONS RANGE FROM THEFT TO DESTRUCTION. CHARACTERISTI ...
SBIR Phase I 1985 Department of DefenseAir Force -
SOFTWARE SATURATION ECM TECHNIQUES
SBC: Applications Resources Inc Topic: N/AN/A
SBIR Phase I 1985 Department of DefenseAir Force -
THE EXCAVATION OF ROCK AND DEEP BASED FACILITIES PRESENTS MAJOR COST AND TECHNICAL CHALLENGES.
SBC: Applied Engineering Resources Topic: N/ATHE EXCAVATION OF ROCK AND DEEP BASED FACILITIES PRESENTS MAJOR COST AND TECHNICAL CHALLENGES. PROPOSALS FOR TUNNELING ARE MOSTLY BASED ON USING TUNNEL BORING MACHINES. EXCAVATION BY DRILL AND BLAST METHODS, WITH MANY ADVANTAGES, ARE ALSO POSSIBLE. DRILL AND BLAST METHODS ARE LESS SENSITIVE TO ROCK QULITY AND TO CHANGES IN TUNNELING DIRECTION. MANY ATTEMPTS, OVER TIME AND BY DIFFERENT PEOPLE, HAVE ...
SBIR Phase I 1985 Department of DefenseAir Force -
EXTENSION
SBC: Astron Research & Engineering Topic: N/AABLATION BEHAVIOR AND THERMAL PROTECTION REQUIREMENTS FOR REENTRY VEHICLES ARE SIGNIFICANTLY INFLUENCED BY ROUGH WALL CONVECTION EFFECTS. TO ACCURATELY CHARACTERIZE THE EFFECTS FOR SYSTEM DESIGN, IT IS ESSENTIAL TO UNDERSTAND THE PHYSICS OF THE TURBULENT BOUNDARY LAYER SUBJECT TO ARBITRARY ROUGHNESSES, AND THE ABLATION INDUCED DEVELOPMENT OF THE MORPHOLOGY. PHASE I OF THIS PROGRAM WILL ADDRESS THE ...
SBIR Phase I 1985 Department of DefenseAir Force -
GAS TURBINE EXIT TEMPERATURE MEASUREMENT
SBC: Astron Research & Engineering Topic: N/AN/A
SBIR Phase I 1985 Department of DefenseAir Force -
TEST EQUIPMENT FOR AVIONICS BEYOND 18 GHZ
SBC: Ateam Corp Topic: N/AN/A
SBIR Phase I 1985 Department of DefenseAir Force -
DEFINITION AND ASSESSMENT
SBC: bd Systems, Inc. Topic: N/ATERRORIST/PARAMILITARY ACTIVITIES ARE ON THE RISE THROUGHOUT THE WORLD. THE IMPLICATION OF THIS ENVIRONMENT FOR THE SMALL ICBM HARD MOBILE LAUNCHER PHYSICAL SECURITY SYSTEM MUST BE CAREFULLY ANALYZED. THIS STUDY WILL DEFINE AND ASSESS POTENTIAL PHYSICAL SECURITY THREATS TO THE SICBM/HML AND WILL DEFINE AND ASSESS COUNTERMEASURE OPTIONS FOR THREAT NEGATION. MASSIVE PROTECTIVE MEASURE, MILITARY ESCO ...
SBIR Phase I 1985 Department of DefenseAir Force