You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. HIGH POWER PICOSECOND DIODE LASER

    SBC: AERODYNE RESEARCH INC            Topic: N/A

    WE ARE PROPOSING TO BUILD A COMPACT LASER PULSE SOURCE WHICHIS THE BOTTLENECK IN THE CRITICALLY NEEDED INSTRUMENT KNOWN AS THE ULTRAFAST OPTICALLY TRIGGERED OSCILLOSCOPE. ADEQUATELASER PULSERS PRESENTLY OCCUP 10 SQUARE FEET, REQUIRE CONTINUOUS MAINTENANCE AND CONSUMER 15 KILOWATTS OF ELECTRICITY. OUR PULSE SOURCE WILL REQUIRE 20 SQUARE INCHES, USES LOW MAINTENANCE DIODE LASERS, AND DRAWS A FEW WAT ...

    SBIR Phase I 1989 Department of DefenseAir Force
  2. AUTOMATIC TARGET MODEL DEGRADATION

    SBC: AERODYNE RESEARCH INC            Topic: N/A

    N/A

    SBIR Phase I 1989 Department of DefenseArmy
  3. FLUORINATED DIAMOND THIN FILMS FOR TRIBOLOGICAL APPLICATIONS

    SBC: AERODYNE RESEARCH INC            Topic: N/A

    N/A

    SBIR Phase I 1989 Department of DefenseMissile Defense Agency
  4. TECHNIQUES FOR OPTION GENERATION IN DECISION MAKING

    SBC: ALPHATECH, INC.            Topic: N/A

    THE PROPOSED PHASE I RESEARCH WILL BUILD ON ALPHATECH'S THEORETICAL WORK ON THE GENERATION OF CRITICAL OPTIONS IN TACTICAL PLANNING AND ALPHATECH'S PRACTICAL EXPERIENCE OBSERVING PLANNING DEFICIENCIES IN FIELD EXERCISES. BOTH NORMATIVE THEORY AND DESCRIPTIONS OF ACTUAL PLANNING BEHAVIOR WILL BE USED TO IDENTIFY AREAS WHERE TACTICAL PLANNERS NEED DECISION SUPPORT IN ORDER TO GENERATE CRITICAL OPTIO ...

    SBIR Phase I 1989 Department of DefenseArmy
  5. AN ITERATIVE MODELING APPROACH TO ARCHITECTURE EVALUATION

    SBC: ALPHATECH, INC.            Topic: N/A

    ALPHATECH'S ITERATIVE MODELING METHODOLOGY (AIMM) DEVELOPS A SYSTEM REPRESENTATION BY USING A TEAM-BASED APPROACH TO DEVELOPING A SERIES OF CHART-BASED MODELS OF THE SYSTEM WITHIN THE CONTEXT OF AN APPROPRIATE SCENARIO; THIS SET OF CHART-BASED MODELS CULMINATES WITH A PETRI NET REPRESENTATION WHICH CAN BE DIRECTLY IMPLEMENTED IN ALPHATECH'S SIMULATION TOOL, MODELER. THE COMPUTER MODEL THAT RESULTS ...

    SBIR Phase I 1989 Department of DefenseNavy
  6. STOCHASTIC TIMED ATTRIBUTED PETRI NET (STAPN) MODELING OF C(3) NETWORKS

    SBC: ALPHATECH, INC.            Topic: N/A

    THE OBJECTIVE OF THIS RESEARCH IS TO DETERMINE THE FEASIBILITY OF USING THE STOCHASTIC, TIMED, ATTRIBUTED PETRI NET (STAPN) METHODOLOGY TO DESCRIBE AND ANALYZE ALTERNATIVE NAVAL C3 ARCHITECTURES. THE US NAVY IS IN THE PROCESS OF DEVELOPING C3 ARCHITECTURES TO SUPPORT THE NAVY'S MISSION AND FUNDAMENTAL WARFARE TASKS. THIS PROCESS INVOLVES ASSESSING ALTERNATIVE C3 ARCHITECTURES TO DETERMINE THEIR IM ...

    SBIR Phase I 1989 Department of DefenseNavy
  7. E-3 SENSOR DATA FUSION ALGORITHM

    SBC: ALPHATECH, INC.            Topic: N/A

    N/A

    SBIR Phase I 1989 Department of DefenseAir Force
  8. THE EFFECTS OF TRAINING AND EXPERIENCE FACTORS ON RAPID TACTICAL DECISION MAKING

    SBC: ALPHATECH, INC.            Topic: N/A

    N/A

    SBIR Phase I 1989 Department of DefenseArmy
  9. FUEL CELLS FOR NAVAL AUXILIARY POWER

    SBC: ANALYTIC POWER LLC            Topic: N/A

    ANALYTIC POWER PROPOSES A SYSTEM ANALYSIS OF THREE POTENTIAL NAVAL AUXILIARY POWER PLANTS USING FUEL CELL TECHNOLOGY. A SYSTEMS ANALYSIS OF THIS APPLICATION IS MANDATORY BECAUSE, MORE OFTEN THAN NOT, THE FUEL CELL IS NOT THE LIMITING TECHNOLOGY. IN MANY CASES, THE FUEL PROCESSOR CAN BE MUCH LARGER THAN THE FUEL TAN AND THE POWER CONDITIONER MAY BE LARGER THAN THE FUEL CELL. CONVENTIONAL COMMERCIAL ...

    SBIR Phase II 1989 Department of DefenseNavy
  10. ELECTROCHEMICAL CRYOCOOLER

    SBC: ANALYTIC POWER LLC            Topic: N/A

    N/A

    SBIR Phase I 1989 Department of DefenseMissile Defense Agency
US Flag An Official Website of the United States Government