You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. A Solid-Solid Hybrid Gas Generator Fire Suppression System

    SBC: MAINSTREAM ENGINEERING CORP            Topic: N/A

    Not Available This Phase 2 proposal addresses the advanced development and commercialization of a novel solid-solid hybrid gas generator fire suppression technology to replace the ozone depleting Halon 1301 for total flooding applications. Mainstream's solid-solid hybrid gas generator technology will result in the delivery of chemical extinguishing agents to the fire in addition to the inert gas a ...

    SBIR Phase II 1999 Department of Commerce
  2. N/A

    SBC: OPTIMUS Corporation            Topic: N/A

    N/A

    SBIR Phase II 1999 Department of Transportation
  3. Conversational 3-D Character On-Line Agents

    SBC: VCOM3D INC            Topic: N/A

    N/A

    SBIR Phase I 1999 Department of Commerce
  4. Workflow Policy Server

    SBC: SECURE COMPUTING CORP.            Topic: N/A

    Not Available Workflow management systems (WMS) may control access between hundreds of users and thousands of objects, so simplified policy management is critical. WMS developers recommend Role-Based Access Control (RBAC) since roles occur naturally in workflows; however, the typical RBAC model lacks the framework to express workflow policies adequately. Traditionally, a WMS mediates accesses to ...

    SBIR Phase II 1999 Department of Commerce
  5. Security Requirements Analysis, Methods and Tools

    SBC: VDG, INC.            Topic: N/A

    N/A

    SBIR Phase I 1999 Department of Commerce
  6. N/A

    SBC: Wph Associates            Topic: N/A

    N/A

    SBIR Phase II 1999 Department of Transportation
  7. Double Capture Amplification System for Bacterial Pathogen Detection in

    SBC: ProED, Inc.            Topic: N/A

    Not Available Bacterial pathogens in salmonids, such as Renibacterium salmoninarum and Aeromonas salmonicida, are difficult to identify by conventional diagnosis due to their extremely slow growth and the absence of an efficient selective medium. Diseases caused by these pathogens represent a serious problem both in the fishing industry and for conservation efforts. While several PCR-based assays ...

    SBIR Phase II 1999 Department of Commerce
  8. BREAKAWAY LUMINAIRE SUPPORT FOR MINI-CARS

    SBC: Adian Engineering Corp.            Topic: N/A

    DUE TO THE DOWNSIZING OF AUTOMOBILES ON U.S. HIGHWAYS, MINI-CARS HAVE BECOME A MAJOR PART OF THE AUTO POPULATION. THE LIGHT WEIGHT AND HIGH CRUSH RATE OF THESE VEHICLES CAN CAUSEHIGH VELOCITY CHANGE LEVELS WHEN IMPACTING MOST EXISTING BREAKAWAY LUMINAIRE SUPPORTS. THIS INCREASES THE PROBABILI-TY OF INJURY TO OCCUPANTSOF MINI-CARS WHEN IMPACTING LUMI- NAIRE SUPPORTS. CONCEPTS HAVE BEEN DEVELOPED WH ...

    SBIR Phase II 1989 Department of Transportation
  9. THE USE OF NEW MATERIALS FOR ROADSIDE SAFETY HARDWARE

    SBC: Adian Engineering Corp.            Topic: N/A

    N/A

    SBIR Phase I 1989 Department of Transportation
  10. A SYSTEMS APPROACH TO SECURITY CHECKPOINT OPTIMIZATION

    SBC: International Productivity            Topic: N/A

    THE RESEARCH WILL IDENTIFY AND ANALYZE BOTH THE QUANTITATIVEAND QUALITATIVE ASPECTS OF SECURITY CHECKPOINT OPERATIONS. USING INDUSTRIAL ENGINEERING TECHNIQUES, SCREENING OPERATIONS WILL BE BROKEN INTO BASIC ELEMENTS WHICH WILL THEN BE MEASURED AND INVESTIGATED TO DETERMINE THE INTERRELATIONSHIPS BETWEEN SUCH COMPONENTS AS: - PROCESSING RATES - DISTRIBUTION OF PASSENGER ARRIVALS - BOARDING VOLUMES ...

    SBIR Phase I 1989 Department of Transportation
US Flag An Official Website of the United States Government