You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
NEMESIS, a Fail-Safe, Tamper-Safe Net Event Monitor, Evaluator & Security Indicator System for Intermodal Network Control Systems
SBC: New Concept Incorporated Topic: N/AN/A
SBIR Phase I 1997 Department of Transportation -
Automatic Documentation of Crash Scenes Using GPS (AutoDOCS-GPS)
SBC: OPTIMUS Corporation Topic: N/AN/A
SBIR Phase I 1997 Department of Transportation -
Feasibility of and Techniques for CORSIM Model Computer-Based Training
SBC: Pacific Animated Imaging Topic: N/AThe Federal Highway Administration has developed a suite of traffic simulation models to assist state, local, and consulting engineers to plan roads and traffic control improvements. Training for the models has traditionally been instructor-led, costly (particularly from the state and local government perspective), and limited in accessibility (subject to availability of instructors). With CORSI ...
SBIR Phase II 1997 Department of Transportation -
Broadcast Radio for Individuals Who are Deaf: Gaining
SBC: Telesonic, Inc. Topic: N/ATalk radio reaches large audiences of people and is a significantly less expensive medium than television. Yet radio broadcasts are inaccessible to deaf and certain hearing impaired people. In project BRIDGE, TeleSonic proposes to simultaneously broadcast information via the radio in multiple transmission forms to deliver both audio and visual information. Users of TTYS, for example, will recei ...
SBIR Phase I 1997 Department of Education -
Conundrum: A Project to Computerize the Comprehensive
SBC: The Evans Associates Topic: N/ACSMP is an exciting K-6 math program, designated as an "exemplary educational program that works¿ by the U.S. Department of Education, which funded its development, evaluation, and dissemination. Its spiral, problem solving approach uses picture languages, abaci, and technically challenging games. Simple problems subtly introduce sophisticated concepts. While class and teacher-student intera ...
SBIR Phase I 1997 Department of Education -
TIED-BACK ELEMENT & SOIL NAILING WALL
SBC: Schnabel Foundation Company Topic: N/AN/A
SBIR Phase I 1983 Department of Transportation