You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. A HIGH TEMPERATURE CERAMIC COMPOSITE

    SBC: Amercom Inc            Topic: N/A

    N/A

    SBIR Phase I 1983 Department of DefenseAir Force
  2. AERONAUTICAL SYSTEMS TECHNOLOGY

    SBC: AMERIGENICS, INC.            Topic: N/A

    N/A

    SBIR Phase I 1983 Department of DefenseAir Force
  3. PROJECTILE PULSE GENERATOR

    SBC: ANCO ENGINEERS, INC.            Topic: N/A

    N/A

    SBIR Phase I 1983 Department of DefenseAir Force
  4. NOVEL APPROACHES TO FASIL POLYMERS

    SBC: AMT, INC.            Topic: N/A

    N/A

    SBIR Phase I 1983 Department of DefenseAir Force
  5. THE RESEARCH HEREIN PROPOSED IS INTENDED TO ADDRESS THE CONTINUING PROBLEM OF ESTIMATING SOFTWARE COSTS OVER THE LIFE OF LARGE AND COMPLEX SOFTWARE PROJETS.

    SBC: Aquidneck Management Associate            Topic: N/A

    THE RESEARCH HEREIN PROPOSED IS INTENDED TO ADDRESS THE CONTINUING PROBLEM OF ESTIMATING SOFTWARE COSTS OVER THE LIFE OF LARGE AND COMPLEX SOFTWARE PROJETS. THE RESEARCH WILL ADDRESS ALL FACTORS THAT AFFECT SOFTWARE COSTS FROM A FUNCTIONAL STANDPOINT AS OPPOSED TO THE TRADITIONAL LINES-OF-CODE (PROGRAM SIZE) APPROACH. THE FACTORS WILL BE TRANSLATED INTO A MODEL THAT EMPHASIZES THE IMPORTANCE OF IN ...

    SBIR Phase I 1983 Department of DefenseAir Force
  6. FIFFTY GIGAWATT PULSED PLASMA MHD POWER SUPPLY

    SBC: Artec Associates Inc.            Topic: N/A

    N/A

    SBIR Phase I 1983 Department of DefenseAir Force
  7. THERE WILL BE A CONTINUING NATIONAL DEFENSE NEED FOR LOW-COST SOLID OR LIQUID FUEL VEHICLES TO BE COMPLEMENTARY TO THE REUSABLE SPACE SHUTTLE.

    SBC: Astrotech Inc            Topic: N/A

    THERE WILL BE A CONTINUING NATIONAL DEFENSE NEED FOR LOW-COST SOLID OR LIQUID FUEL VEHICLES TO BE COMPLEMENTARY TO THE REUSABLE SPACE SHUTTLE. SUCH EXPENDABLE VEHICLES, MUST BE CREATED FROM THE EXISTING FAMILY OF ROCKET MOTORS AVAILABLE TO THE ARMED FORCES IF DEVELOPMENT TESTS ARE TO REMAIN LOW. ASTROSPACE, INC. HAS DEVELOPED A ROCKET VEHICLE CONCEPT THAT COMBINES THE TRADITIONAL BENEFITS OF BUNDL ...

    SBIR Phase I 1983 Department of DefenseAir Force
  8. DEPTH POFILING IN ALGAAS AND LINOO3 USING SPUTTER INITIATED RESONANCE IONIZATION SPECTROSCOPY

    SBC: ATOM SCIENCES, INC.            Topic: N/A

    N/A

    SBIR Phase I 1983 Department of DefenseAir Force
  9. THE SOLID FUEL RAMJET (SFRJ) IS CURRENTLY BEING CONSIDERED AS A PROPULSION DEVICE FOR A NUMBER OF AIR FORCE TACTICAL APPLICATIONS.

    SBC: BELTRAN, INC.            Topic: N/A

    THE SOLID FUEL RAMJET (SFRJ) IS CURRENTLY BEING CONSIDERED AS A PROPULSION DEVICE FOR A NUMBER OF AIR FORCE TACTICAL APPLICATIONS. THE PROPOSED PHASE I WORK WILL BE AN EXPLORATORY DEVELOPMENT EFFORT IN THE FOLLOWING AREA TO EVALUATE WHICH OF THE CONCEPTS ARE WORTHY OF FURTHER DEVELOPMENT UNDER PHASE II, CONSIDERING THE REQUIREMENTS OF THE AIR FORCE MISSION FOR THE SOLID FUEL RAMJET. (A) ALTERNATE ...

    SBIR Phase I 1983 Department of DefenseAir Force
  10. OF AUTOMATING THE USE OF THE UNDERLYING LEARNING CURVE (ULC)APPROACH FOR USE BY CONTACT ADMINISTATION ORGANIZATIONS.

    SBC: Bill C. Giallourakis            Topic: N/A

    OF AUTOMATING THE USE OF THE UNDERLYING LEARNING CURVE (ULC)APPROACH FOR USE BY CONTACT ADMINISTATION ORGANIZATIONS. THEUNDERLYING LEARNING CURVE (ULC) TECHNIQUE COMBINES BOTH ENGINEERING AND PARAMETRIC ESTIMATING APPROACHES TO PROVIDE A "SHOULD COST" ESTIMATE OF DIRECT LABOR. ULC ALLOWS THE DISCIPLINED INTEGRATION OF THE DATA FOUND IN THE CONTRACTOR'S WORK MEASUREMENT AND COST ACCOUNTING SYSTEMS ...

    SBIR Phase I 1983 Department of DefenseAir Force
US Flag An Official Website of the United States Government