You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. A SIMPLE SAFETY ARMING SWITCH

    SBC: Enfitek Inc            Topic: N/A

    A SIMPLE SAFETY ARMING SWITCH FOR GUIDED MISSILES CAN BE BUILT AROUND AN ACCELEROMETER AND INTEGRATING CIRCUIT. IN GENERAL, DURING THE LAUNCH BOOST PHASE, THE ACCELERATION OF A MISSILE INCREASES TO A MAXIMUM JUST BEFORE BURNOUT. CHARACTERISTIC ACCELERATION PROFILES FOR A PARTICULAR MISSILE ARE DEPENDENT UPON FUEL TAILORING AND MISSION REQUIREMENTS; I.E. AIR-TO-AIR MISSION, GROUND-TO-AIR MISSION, E ...

    SBIR Phase II 1988 Department of DefenseNavy
  2. Optimizing Prognostic and Health Management System Designs for the Joint Strike Fighter

    SBC: Impact Technologies            Topic: N/A

    "The proposed program is focused specifically on developing and optimizing advanced Prognostics and Health Management (PHM) system designs for various Joint Strike Fighter aircraft systems and subsystems. A PHM design optimization tool developed under aseparate program will be utilized to examine several selected JSF aircraft areas including the propulsion system (Fan/Compressor/Turbine, Engine ...

    SBIR Phase II 2002 Department of DefenseNavy
  3. High Temperature Multifunctional Applique

    SBC: INTEGUMENT TECHNOLOGIES, INC.            Topic: N/A

    "The development of applique technology as an alternative to current paint coating systems is important to all aircraft manufacturers and end users, especially th eend users in the military. This is due to the tremendous savings that may be realized viathe elimination of hazardous solvents, materials and by-products currently required for application, maintenance, removal, and repair of current p ...

    SBIR Phase II 2002 Department of DefenseNavy
  4. DEVELOPMENT OF AN EULERIAN FINITE ELEMENT CODE

    SBC: Intelligent Systems Research, Inc.            Topic: N/A

    CURRENT NUMERICAL COMPUTATIONS TO DESCRIBE NUCLEAR GROUND SHOCK ENVIRONMENTS, NUCLEAR CRATER FORMATION, IMPACT DYNAMICS AND PENETRATION MECHANISMS PRESENTLY EMPLOY EULERIAN-BASED FINITE DIFFERENCE CODES BECAUSE OF THEIR ABILITY TO MODEL THE MASS FLUX PHENOMENA IN TRACKING MATERIAL MOVEMENT THROUGH THE DISCRETIZED SPACE. THE FINITE DIFFERENCE CODES SUFFER IN COMPARISON TO FINITE ELEMENT CODES, HOWE ...

    SBIR Phase II 1989 Department of DefenseDefense Threat Reduction Agency
  5. Reflex Triode

    SBC: KTECH CORP.            Topic: N/A

    "Reflex triode bremsstrahlung sources potentially provide warm X-ray sources (20 keV to 500 keV), capable of generating high doses (~10 cal/g gold) over exposure areas of ~20 cm2. This needed capability allows experimental verification of warm X-ray inducedthermomechanical response, SGEMP, and box IEMP models for achieving component and system certification to hostile environments.In a reflex trio ...

    SBIR Phase II 2002 Department of DefenseDefense Threat Reduction Agency
  6. Collaborative Systems Engineering Workbench and Network

    SBC: MANAGEMENT SCIENCES INC            Topic: N/A

    The Virtual Engineering firm is a reality, with a team of scientists and engineers scattered at home sites working together to solve tough engineering problems. This SBIR will perform research and development to provide collaborative system engineering tools for network engineering projects. We will explore new directions for collaborative systems engineering (SE) that enable distributed req ...

    SBIR Phase II 1998 Department of DefenseNavy
  7. Digital Data Download (D3) with Crash Survivable Memory

    SBC: MANAGEMENT SCIENCES INC            Topic: N/A

    "Our Phase I SBIR project performed innovative research to addressthis problem. This research investigated the feasibility ofdeveloping a multi-purpose, crash survivable, universal flightinformation system and data recorder (UFDR). The UFDR willdigitally process and record structural, engine/propulsion,electrical/avionics, environmental, exceedance, and event data tocrash survivable memory with c ...

    SBIR Phase II 2002 Department of DefenseNavy
  8. SHALLOW WATER SONAR SYSTEM

    SBC: Mission Sciences Corp.            Topic: N/A

    A SHALLOW WATER SONAR SYSTEM WILL BE DESIGNED AND ANALYZED USING A UNIQUE RAY-BASED SHALLOW WATER PROPAGATION AND REVERBERATION MODEL. THE BASELINE CANDIDATE SYSTEM IS A PLANAR ARRAY SONAR IN A VDS CONFIGURATION. THE ARRAY USES LIGHTWEIGHT CYLINDRICAL TRANSMITTING ELEMENTS AND DIFAR RECEIVING ELEMENTS TO ACHIEVE EXCELLENT PERFORMANCE IN A COMPACT CONFIGURATION. ITS SIZE AND WEIGHT ARE APPROPRIATE ...

    SBIR Phase II 1989 Department of DefenseNavy
  9. Multi-dimensional, user-oriented synthetic environment(Muse): A standard synthetic environment system for virtual prototyping

    SBC: MUSE TECHNOLOGIES, INC.            Topic: N/A

    We propose to develop a simulation system that integrates CAD/CAM/CAT tools into a Virtual Manufacturing Environment, and to demonstrate the proof of concept. The proposed system will be based on the demonstrated functionality of Multi-dimensional, user-oriented Synthetic Environment, UuSE (pronounced "muse'). Developed at Sandia National Laboratories by UuSE Technologies, Inc. (principals a ...

    SBIR Phase II 1998 Department of DefenseNavy
  10. ROTARY JOINT FOR SINGLE-MODE OPTICAL FIBER

    SBC: OPTOMEC, INC.            Topic: N/A

    FIBER OPTIC TECHNOLOGY IS DISPLACING ELECTRICAL WIRING IN MANY APPLICATIONS. THE TREND IN FIBER OPTICS IS CLEARLY TOWARDS THE SINGLE-MODE TYPE VERSUS THE MULTIMODE TYPE. THIS PRESENTS A PROBLEM IN BUILDING COUPLINGS FOR SINGLE MODE FIBERS, SIMPLY BECAUSE THE CORESARE MUCH SMALLER IN DIAMETER NECESSITATING TIGHTER ALIGNMENT AND STABILITY REQUIREMENTS. A ROTARY JOINT FOR 50 MICRON CORE MULTIMODE FIB ...

    SBIR Phase II 1988 Department of DefenseNavy
US Flag An Official Website of the United States Government