You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
HIGH TEMPERATURE SUPERCONDUCTORS WITH IMPROVED CURRENT DENSITIES
SBC: Cryopower Associates, Inc. Topic: N/AN/A
SBIR Phase I 1989 Department of DefenseMissile Defense Agency -
HIGH POWER SHORT PULSE BATTERY/CAPACITOR
SBC: ERNEST MEADOWS INDUSTRIAL DESIGN Topic: N/AN/A
SBIR Phase I 1989 Department of DefenseMissile Defense Agency