You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. SELF-DEVELOPMENT X-RAY FILM

    SBC: Energy Optics, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1987 Department of DefenseArmy
  2. PERFORMANCE RECKONING FOR PROJECTING MANPOWER AND SKILL LEVEL REQUIREMENTS

    SBC: Epic Sales, Inc. Dba Epic Systems            Topic: N/A

    AN ISOPERFORMANCE MODEL IS DESCRIBED WHICH WILL PERMIT TRADE-OFFS BETWEEN SIGNIFICANT PEOPLE-RELATED ELEMENTS IN MILITARY SYSTEMS AND PERMIT HUMAN RESOURCE MANAGERS TO ANSWER "WHAT IF" QUESTIONS. SINCE THE TECHNIQUE INVOLVES ESTIMATING IN ADVANCE THE LIKELY CONSEQUENCES OF PARTICULAR COMBINATIONS OF PERSONNEL, TRAINING, AND EQUIPMENT FOR MILITARY SYSTEMS PERFORMANCE, IT IS LIKE A FRONT-END ANALYSI ...

    SBIR Phase I 1987 Department of DefenseArmy
  3. DEVELOPMENT OF A CORRELATION MODEL ADDRESSING CONTINGENCY MOBILITY COURSES AMONG DESERTS

    SBC: Geohazards Inc            Topic: N/A

    EXISTING CORRELATIONS OF MOBILITY ROUTES AMONG WORLD-WIDE DESERTS ARE BASED ON INCOMPLETE DATA AND ON A LIMITED ARRAY OF FACTORS. THE PROPOSED RESEARCH WILL YIELD A COMPUTER-BASED, DESERT MOBILITY COURSE CORRELATION MODEL WHICH WILL INVOKE A WEIGHTED APPLICATION OF EVERY SIGNIFICANT IMPACTING CRITERIA (E.G. TOPOGRAPHY, CLIMATE, ROAD NETWORKS, VISIBILITY, DRAINAGE, ETC.) TO A SERIES OF CORRELATION ...

    SBIR Phase I 1987 Department of DefenseArmy
  4. LOW-LOSS SAW FILTERS USING MONOLITHIC CONSTRUCTION- DEMONSTRATION

    SBC: Hartmann Research Inc.            Topic: N/A

    THE PROPOSED PROGRAM WILL PROVIDE EXPERIMENTAL VERIFICATION OF A NEW MONOLITHIC LOW-LOSS SAW TRANSDUCER STRUCTURE. THE STRUCTURE IS A SINGLE PHASE UNIDIRECTIONAL TRANSDUCER (SPUDT) BUT AVOIDS THE PROBLEMS ENCOUNTERED BY PREVIOUS SPUDT STRUCTURES. THE ADVANTAGES OF THE STRUCTURE INCLUDE EASE OF FABRICATION AND ADEQUATE REFLECTIVITY FOR BOTH WIDE BAND AND NARROW BAND FILTERS. THE STRUCTURE ALSO AVOI ...

    SBIR Phase II 1987 Department of DefenseArmy
  5. MODELS FOR MULTI-REGION SAW WAVEGUIDES ON ANISOTROPIC SUBSTRATES

    SBC: Hartmann Research Inc.            Topic: N/A

    THE PROPOSED RESEARCH WILL DEVELOP A MORE ACCURATE METHOD FOR ANALYZING SAW DEVICES BASED ON MODELING A SAW TRANSDUCER AS AN ACOUSTIC WAVEGUIDE. APPROXIMATE ANALYSIS HAS SHOWN THAT IN MOST CASES, THE LOWEST ORDER TRANSDUCER WAVEGUIDE MODES HAVE UNDESIRABLE MODE SHAPES THAT TEND TO CONCENTRATE ENERGY UNDER THE BUS BARS ON EITHER SIDE OF THE STRUCTURE. A MORE COMPLEX TRANSDUCER STRUCTURE IS PROPOSED ...

    SBIR Phase I 1987 Department of DefenseArmy
  6. ADVANCED FACILITIES TO EXPEDITE DESIGN AND EVALUATION OF COMMUNICATIONS SYSTEMS

    SBC: Information Research            Topic: N/A

    THE TECHNICAL OBJECTIVE OF THIS PROJECT IS TO ESTABLISH THE FEASILBILITY OF SATISFYING THE REQUIREMENTS OF THE U.S. ARMY COMMUNICATIONS ELECTRONICS COMMAND (CECOM) FOR RAPID AND EFFECTIVE MODELING OF U.S. ARMY COMMUNICATION SYSTEMS. THE METHOD WE PROPOSE FOR SATISFYING THESE REQUIREMENTS IS TO ADAPT A TOP-DOWN DESIGN SYSTEM FOR ELECTRONIC SYSTEMS BEING DEVELOPED FOR THE U.S. NAVY TO MODEL-ING OF C ...

    SBIR Phase I 1987 Department of DefenseArmy
  7. FRAME-TO-FRAME COHERENCE APPROACH TO EFFICIENT 3-D ANIMATION

    SBC: Intelligent Systems Research, Inc.            Topic: N/A

    CURRENT 3-D ANIMATION TECHNIQUES INVOLVES SIMPLE SHOWING SEPARATELY PREPARED IMAGES IN A SEQUENCE. THESE TECHNIQUES ARE SOMETIMES CALLED REPEAT-STATIC TECHNIQUES BECAUSE THEY MAKE NO USE OF THE SIMILARITY BETWEEN THE SUCCESSIVE IMAGES IN THE PREPARATION OF THE IMAGES. FOR REALISTIC ANIMATION REQUIRING THOUSANDS OF FRAMES, THE COMPUTATIONAL COST CAN BE PROHIBITIVE, AND THE TURN-AROUND TIME UNACCEPT ...

    SBIR Phase I 1987 Department of DefenseArmy
  8. CERAMIC COMPONENT NONDESTRUCTIVE TESTING TECHNOLOGY

    SBC: KARTA TECHNOLOGIES            Topic: N/A

    N/A

    SBIR Phase I 1987 Department of DefenseArmy
  9. INTELLIGENT HOWITZER DECISION AID FOR RECONNAISSANCE SELECTION AND OCCUPATION OF POSITION (RSOP)

    SBC: Lb&m Assoc., Inc.            Topic: N/A

    ARMY DOCTRINE STATES THAT QUICK, EFFECTIVE COMMAND AND CONTROL (C2) IS THE KEY TO SUCCESS ON THE BATTLEFIELD. THE INCREASING TEMPO AND LETHALITY OF THE MODERN BATTLEFIELD DICTATE THAT THE ARMY'S DISPERSED,SEMI-AUTONOMOUS UNITS AND SYSTEMS POSSESS THE CAPABILITY TO OPERATE EFFECTIVELY ON THE BATTLEFIELD BY HAVING ON-BOARD INTELLIGENT C2 SYSTEMS. THE US ARMY FIELD ARTILLERY ENVISIONS THE DISPERSED, ...

    SBIR Phase I 1987 Department of DefenseArmy
  10. INTELLIGENT HOWITZER SELF-DEFENSE DECISION AID

    SBC: Lb&m Assoc., Inc.            Topic: N/A

    N/A

    SBIR Phase I 1987 Department of DefenseArmy
US Flag An Official Website of the United States Government