You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Powder Synthesis and Bulk Crystal Growth of Gallium Nitride

    SBC: CERMET, INC.            Topic: N/A

    The primary goal of Phase I work is to demonstrate the feasibility of synthesizing gallium nitride (GaN) powder. Secondarily, this powder will be used to grow high-purity single crystals of GaN from a liquid GaN phase. This would be accomplished using a proprietary variation of the skull melting technique. Since GaN demonstrates peritectic-type decomposition at atmospheric pressure, the entire sku ...

    SBIR Phase I 1997 Department of DefenseMissile Defense Agency
  2. QUASI-PHASE-MATCHED STRUCTURES FOR HIGH AVERAGE POWER NONLINEAR OPTICS

    SBC: Cleveland Crystals Inc            Topic: N/A

    QPM involves alternating regions of nonlinear material, such that efficient 3-wave mixing is achieved without conventional phase matching. If a practical implementation of QPM were developed, then harmonic generation (SHG/THG) from CO(2) laser radiation and mid-infrared (mid-IR) pumped optical parametric oscillators and amplifiers (OPOs/OPAs) would be able to produce broadly tunable radiation acro ...

    SBIR Phase I 1994 Department of DefenseMissile Defense Agency
  3. CADMIUM-MANGANESE-TELLURIDE: A NEW MAGNETO-OPTIC CRYSTAL

    SBC: Cleveland Crystals Inc            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of DefenseMissile Defense Agency
  4. Chalcogenide Superconductors

    SBC: Cryopower Associates, Inc.            Topic: N/A

    WE PROPOSE TO SEARCH FOR NEW SUPERCONDUCTORS THAT ARE SIMILAR TO THE PEROVSKITE-BASED HIGH TEMPERATURE SUPERCONDUCTORS (HTS), BUT WITH THE OXYGEN REPLACED BY A CHALCOGEN, THAT IS SULFUR, SELENIUM OR TELLURIUM. WE BELIEVE THAT THE HTS COPPER OXIDES ARE NOT A UNIQUE ACCIDENT OF NATURE, BUT THAT THERE ARE OTHER COMPLEX CHEMICAL COMPOUNDS THAT COULD ALSO BE SUPERCONDUCTING. AN OBVIOUS PLACE TO LOOK WO ...

    SBIR Phase I 1994 Department of DefenseMissile Defense Agency
  5. LARGE DIAMETER LOW DISLOCATION DENSITY GERMANIUM SUBSTRATES

    SBC: Crysteco Inc            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of DefenseMissile Defense Agency
  6. Object-oriented Signal Processing

    SBC: Data Refining Technologies,            Topic: N/A

    THE PROBLEM ADDRESSED IS THAT OF EXTRACTING INFORMATION ABOUT EVENTS ASSOCIATED WITH A PHYSICAL SYSTEM BY PROCESSING A LARGE NUMBER OF DATA STREAMS FLOWING FROM SENSORS AND INSTRUMENTATION. IT IS ASSUMED THAT DECEPTIVE DATA PORTIONS ARE IMBEDDED, WITH NO A-PRIORI MODELS DESCRIBING SYSTEM BEHAVIOR. THE OBJECTIVE IS TO FORMALIZE, ARTICULATE, AND DEMONSTRATE A SIGNAL-PROCESSING FRAMEWORK (OBJECT OREI ...

    SBIR Phase I 1993 Department of DefenseMissile Defense Agency
  7. InGaP/InGaAs-on-Ge Concentrator Solar Cells for Space Power Generation

    SBC: Essential Research, Inc.            Topic: N/A

    Essential Research, Inc. proposed to develop an ultra-high efficiency, dislocation-free, monolithic two-terminal, two-junction InGaP/InGaAs on Ge solar cells for space applications. The energy bandgap (Eg) values for the top and bottom cells will be 1.7 eV and 1.1 eV, respectively. These bandgaps are theoretically optimal for a two-junction tandem cell configuration. This solar cell will have a pr ...

    SBIR Phase I 1997 Department of DefenseMissile Defense Agency
  8. Linear Reciprocating Motor For Advanced Cryocoolers

    SBC: Holliday Laboratorys            Topic: N/A

    THE VULCAN LINEAR MOTOR CONCEPT PRINCIPLE HAS BEEN PROVEN IN HARDWARE APPLICATIONS INVOLVING STIRLING CYCLE REFRIGERATORS AND ELECTRICAL GENERATORS. THE VULCAN LINEAR MOTOR OFFERS SINIFICANT ADVANTAGES OVER THE MOVING COIL AND OTHER MOTOR TYPES COMMONLY USED IN CRYOCOOLERS. THE PROPOSED EFFORT WILL CONSIDER A RANGE OF CRYOCOOLER APPLICATIONS OF INTEREST TO DoD, AND IDENTIFY A TARGET FOR WHICH THE ...

    SBIR Phase I 1994 Department of DefenseMissile Defense Agency
  9. Novel Processing of Permanent Magnetic Materials via Dynamic Magnetic Compaction (DMC) Process to Obtain High Energy Density at High Temperature (300-

    SBC: IAP RESEARCH, INC.            Topic: N/A

    Current rare earth permanent magnets have proven to be in adequate for higher temperatures (300-500_C) military and Air Force applications. Development of permanent magnetic materials which can operate in high temperature regime will enable design of simpler, more efficient magnetic systems. The More Electric Aircraft (MEA) concept pursued by the US Air Force drives this need. We propose a novel p ...

    SBIR Phase I 1997 Department of DefenseMissile Defense Agency
  10. HIGH-EFFICIENCY ELECTROMAGNETIC LAUNCHER

    SBC: IAP RESEARCH, INC.            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of DefenseMissile Defense Agency
US Flag An Official Website of the United States Government