You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. NEW TECHNOLOGIES FOR IMPROVED SIMULATION OF NUCLEAR WEAPON EFFECTS

    SBC: Ares Corporation            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of DefenseDefense Threat Reduction Agency
  2. HOLOGRAPHIC PATTERN RECOGNITION FOR ARMS CONTROL

    SBC: EMPIRICAL TECHNOLOGIES CORPORATION            Topic: N/A

    THE CONTRACTOR HAS PATENTED TECHNOLOGY FOR A UNIQUE PROCESS THAT DIRECTLY CONVERTS AN ACOUSTIC SIGNAL INTO A VISIBLE ONE IN REAL-TIME WITHOUT ELECTRONIC CIRCUITRY. THIS RELIES ON THE ACOUSTO-OPTICAL PROPERTIES OF A CONTINUOUS LAYER OF LIQUID CRYSTAL THIN FILM LAYER WHICH SERVES AS BOTH THE SENSOR AND THE DISPLAY. THE IMAGE CAN BE VIEWED DIRECTLY BY MEANS OF CCD CAMERA. HOLOGRAPHY PROVIDES FOR BOTH ...

    SBIR Phase I 1990 Department of DefenseDefense Threat Reduction Agency
  3. NOVEL UNDERWATER SHOCK WAVE MEASUREMENT

    SBC: KTECH CORP.            Topic: N/A

    THE PROPOSED EFFORT WILL DEVELOP AND APPLY A NEW EXPERIMENTAL APPROACH TO MEASURE UNDERWATER TIME RESOLVED SHOCK WAVE PROFILES RESULTING FROM UNDERWATER OR SURFACE DETONATIONS. EXPLICIT DATA REQUIRED TO DESCRIBE UNDERWATER SHOCK WAVE EFFECTS ON TARGETS WILL BE OBTAINED USING A RECENTLY DEVELOPED PIEZOELECTRIC POLYMER STRESS GAUGE. A UNIQUE EXPERIMENTAL CONFIGURATION IS PROPOSED, THAT WILL ALLOW SH ...

    SBIR Phase I 1990 Department of DefenseDefense Threat Reduction Agency
  4. FAST-RISE HIGH PRESSURE GAUGE FOR LONG-DURATION NUCLEAR AIRBLAST

    SBC: KTECH CORP.            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of DefenseDefense Threat Reduction Agency
  5. ELECTROMAGNETIC ENVIRONMENTAL EFFECTS WITHIN A NUCLEAR POWER PLANT

    SBC: MISSION RESEARCH CORP.            Topic: N/A

    MRC PROPOSES TO DEVELOP A SAFETY PERFORMANCE INDICATOR (PI) OF THE ELECTROMAGNETIC (EM) PROTECTION STATUS OF A NUCLEAR POWER PLANT (NPP). WE BELIEVE THAT SUCH A PI IS NEEDED BECAUSE: (1) EM ENVIRONMENTAL POLLUTION IS ON THE INCREASE,(2) ADDITIONAL EM THREATS MUST BE EVALUATED, AND (3) DISRUPTION OF NPP OPERATIONS BY EM EFFECTS CAN AND MUST BE AVOIDED. PREVIOUS STUDIES HAVE ADDRESSED THE ISSUE OF E ...

    SBIR Phase I 1990 Nuclear Regulatory Commission
  6. PLASMA DRIVEN WATER SHOCK

    SBC: MISSION RESEARCH CORP.            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of DefenseDefense Threat Reduction Agency
  7. MOLECULARLY ENGINEERED POLYMERS WITH HIGH DIELECTRIC STORAGE DENSITY AND A LARGE DIELECTRIC CONSTANT

    SBC: Tetra Corporation            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of DefenseDefense Threat Reduction Agency
  8. IMPROVEMENTS IN MOTOR OPERATED GATE VALVE DESIGN AND PREDICTIVE MODELS FOR RELIABILITY IMPROVEMENTS IN NUCLEAR POWER PLANT SAFETY SYSTEMS

    SBC: KALSI ENGINEERING, INC            Topic: N/A

    MOTOR OPERATED GATE VALVE OPERABILITY PROBLEMS AND FAILURES AT NUCLEAR POWER PLANTS ARE A MAJOR SAFETY CONCERN AS STATEDIN NRC IE BULLETIN 85-03 AND GENERIC LETTER 89-10. THIS PROPOSAL IS AIMED AT IMPROVING GATE VALVE PERFORMANCE BY (1) DEVELOPING COMPREHENSIVE PERFORMANCE PREDICTION MODELS FOR USE OVER A RANGE OF OPERATING CONDITIONS, (2) DEFINING LIMITS, BASED ON SPECIFIC DESIGNS, BEYOND WHICH E ...

    SBIR Phase I 1990 Nuclear Regulatory Commission
  9. SUBSCALE TESTING OF ROCKBOLTED TUNNELS IN JOINTED MEDIA

    SBC: Applied Research Associates, Inc.            Topic: N/A

    DEVELOPMENT OF AN INNOVATIVE AND ECONOMICAL EXPERIMENTAL METHOD IS PROPOSED WHICH CAN PROVIDE THE BASIC BEHAVIOR DATA NECESSARY TO MEET THE DNA OBJECTIVE OF PROVIDING ADEQUATE ANALYSIS, DESIGN AND ASSESSMENT METHODS FOR MINIMALLY HARDENED TUNNELS. THIS DEVELOPMENT IS ACCOMPANIED BY ANALYSIS CAPABLE OF REPRESENTING THE COMPLEX INELASTIC MATERIAL BEHAVIOR OF THE ROCK MASS AND OF REPRESENTING SIMPLE ...

    SBIR Phase I 1988 Department of DefenseDefense Threat Reduction Agency
  10. DEVELOPMENT OF A HIGH DYNAMIC RANGE DOWNHOLE SIGNAL CONDITIONING MODULE

    SBC: Applied Research Associates, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1988 Department of DefenseDefense Threat Reduction Agency
US Flag An Official Website of the United States Government