You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Deep Integration of Geometric Avionics Sensor Data

    SBC: Adroit Systems, Inc.            Topic: N/A

    Adroit Systems, Inc. (ASI) is proposing to develop the concept of a geometric vector that is updated by deeply integrated avionics sensor data. Deep integration is a technique of sensor fusion that promises greater performance and robustness than possible with cascaded frameworks. Many of today's federated avionics sensor suites do not provide outputs that facilitate deep integration. The soluti ...

    SBIR Phase I 1995 Department of DefenseAir Force
  2. Fast-Acting Cryogenic Injection Valves for Pulse Detonation

    SBC: Adroit Systems, Inc.            Topic: N/A

    The opportunity addressed in this proposal is a fast-acting cryogenic injection valve for pulse detonation rocket engines (PDREs), which are predicted to significantly out-perform current state-of-the-art chemical deflagrative rocket propulsion systems. The developed valve would allow high mass flow rates to be achieved with fast response times, all at minimum cost, weight, power, and volume. Th ...

    SBIR Phase I 1997 Department of DefenseAir Force
  3. Adv Tech for Minimization of Deflagration to Detonation Transition Distance in PDE Applications

    SBC: Adroit Systems, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of DefenseAir Force
  4. Experimental and Analytical Evaluation of Solid Fueled Gas Generator Effluents Suitable for High Mach Combined Cycle PDE Applications

    SBC: Adroit Systems, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1995 Department of DefenseAir Force
  5. A NOVEL VERY-LOW-COST AIRBREATHING PROPULSION SYSTEM

    SBC: Adroit Systems, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1992 Department of DefenseAir Force
  6. An Innovative Pulse Detonation Rocket Engine

    SBC: Adroit Systems, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1995 Department of DefenseAir Force
  7. Large Volume, High Speed, Data Management Technology

    SBC: Adv. Engineering And Research            Topic: N/A

    N/A

    SBIR Phase I 1995 Department of DefenseAir Force
  8. Complentary 2-D MESFET for Low Power Electronics

    SBC: Advanced Device Technologies,            Topic: N/A

    The primary objectives of this Phase I effort are to assess the feasibility of developing a p-channel 2-D MESFET and to determine the extent of the significant reduction in power consumption of integrated circuits which may be achieved by utilizing a complementary 2-D MESFET technology. The new FET technology promises to eliminate the Narrow Channel Effect (NCE) which is one of the primary factor ...

    SBIR Phase I 1995 Department of DefenseAir Force
  9. ORGANIX MATRIX COMPOSITE MATERIALS FOR CRYOGENIC SERVICE

    SBC: Advanced Material Systems            Topic: N/A

    APPLICATION OF ADVANCED ORGANIC COMPOSITE AT CRYOGENIC TEMPERATURE IS OF CURRENT INTEREST. HOWEVER, RELATIVELY LIMITED DEVELOPMENT WORK HAS BEEN DONE IN THIS AREA. OUR UNDERSTANDING OF THE MECHANICAL AND CHEMICAL BEHAVIOR OF AN ORGANIC COMPOSITE MATERIAL AT CRYOGENIC ENVIRONMENT IS SOMEWHAT LACKING. IN ORDER TO UNDERSTAND THE FUNDAMENTAL MECHANISMS THAT AFFECT THE PERFORMANCE OF AN ORGANIC COMPOSI ...

    SBIR Phase I 1988 Department of DefenseAir Force
  10. COMPACT SATELLITE BUS DESIGN

    SBC: AEROASTRO, INC.            Topic: N/A

    Construction of a very small (~1 kg) satellite bus compatible with the requirements of a 3 axis controlled satellite mission is presently technically feasible. Such systems have been discussed, but none have been realized yet because of technology and cost considerations. Such a satellite would have enormous commercial potential in applications including communications and remote sensing both beca ...

    SBIR Phase I 1995 Department of DefenseAir Force
US Flag An Official Website of the United States Government