You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Laser Consolidation of Silicon Carbide/Titanium Metal Composite Turbine Rings

    SBC: CORDEC CORP.            Topic: N/A

    N/A

    SBIR Phase I 1995 Department of Energy
  2. A SYNTHETIC BEAM SONAR SYSTEM FOR MOBILE ROBOTS AND TELEOPERATORS

    SBC: Cybermation Inc.            Topic: N/A

    N/A

    SBIR Phase I 1988 Department of Energy
  3. LNG Storage and Delivery System Analysis

    SBC: Directed Technologies, Inc.            Topic: N/A

    87 LNG Storage and Delivery System Analysis--Directed Technologies, Inc., 4001 North Fairfax Drive, Suite 775, Arlington, VA 22203-1614; (703) 243-3383 Mr. Brian D. James, Principal Investigator Mr. Ira F. Kuhn, Jr., Business Official DOE Grant No. DE-FG02-97ER82357 Amount: $75,000 To reduce foreign fuel dependence and improve the Nation¿s air quality, new high-efficiency, direct-injection d ...

    SBIR Phase I 1997 Department of Energy
  4. A Portable Supercritical Fluid Extraction System for Direct Extraction of Heavy Metals from Wastewater

    SBC: Durability, Inc.,            Topic: N/A

    N/A

    SBIR Phase I 1995 Department of Energy
  5. Development of Novel Iron-Chromium-Silicon Alloys for Use in Kraft Recovery Boilers

    SBC: E. R. Johnson Associates, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1995 Department of Energy
  6. Integrated Bandpass Filter Contacts for TPV Cells

    SBC: EDTEK, INC.            Topic: N/A

    111 Integrated Bandpass Filter Contacts for TPV Cells--Edtek, Inc., 7082 South 220th Street, Kent, WA 98032-1910; (206) 395-8084 Dr. Mark Morgan, Principal Investigator Mr. William E. Horne, Business Official DOE Grant No. DE-FG03-97ER82362 Amount: $74,976 The Department of Energy develops radioisotope-electric power systems used on NASA space probes. High efficiency energy conversion techn ...

    SBIR Phase I 1997 Department of Energy
  7. AN INFRARED BANDPASS THERMOPHOTOVOLTAIC FILTER PRODUCTION PROCESS

    SBC: EDTEK, INC.            Topic: N/A

    N/A

    SBIR Phase I 1994 Department of Energy
  8. Bandgap-Engineered Thermophotovoltaic Devices for High Efficiency Radioisotope Power

    SBC: EDTEK, INC.            Topic: N/A

    N/A

    SBIR Phase I 1995 Department of Energy
  9. HUMAN PRESENCE DETECTION IN VEHICLES

    SBC: ENSCO Inc            Topic: N/A

    AN EXISTING SYSTEM HAS DEMONSTRATED, IN QUIET CONDITIONS, VERY RELIABLE DETECTION OF HUMANS HIDDEN IN VEHICLES. SEISMIC VIBRATIONS ARE THE MAJOR, UNAVOIDABLE LIMITATIONS. MEASUREMENT OF THE SEISMIC VIBRATIONS AND COHERENT ANALYSES WILL BE UTILIZED TO COMPUTE AND SUBTRACT THE EFFECT OF THE SEISMIC INTERFERENCE ON THE VEHICLE MOTION. THE PHASE I EFFORT WILL IMPROVE THE RELIABILITY, INCREASE THE S ...

    SBIR Phase I 1994 Department of Energy
  10. RELIABLE INTRUSION DETECTION

    SBC: ENSCO Inc            Topic: N/A

    RELIABLE INTRUSION DETECTION MAY BE ACHIEVED BY COMBINING GENERALIZED POTENTIAL FUNCTION (GPF) NEURAL NET CONSTRUCTION AND MULTIPLE SENSOR DATA FUSION. TRADITIONALLY, RELIABLE INTRUSION DETECTION CAN BE DIFFICULT BECAUSE NOISE LEVELS CHANGE WITH TIME AND LOCATION, AND AN INTRUSION MAY PRODUCE A WIDE RANGE OF SIGNALS OR VARIATIONS OVER THE DIFFERENT TYPES OF SENSORS. ACCOMMODATING THESE VARIATION ...

    SBIR Phase I 1994 Department of Energy
US Flag An Official Website of the United States Government