You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
A Broadly Tunable Ultrashort Pulse IR OPO Pumped by a Mode-Locked
SBC: SCIENCE & ENGINEERING ASSOC., INC. Topic: N/AWe propose to develop an innovative, compact ultrafast high brightness laser source, broadly tunable in the infrared for vibrationally-resolved infrared microscopy and other applications. By passive Kerr lens mode-locking of a novel diode-pumped tunable Cr:LiSAF laser, 100fs pulses will be generated at 100 MHZ repetition rate with an average power of 1W. An optical parametric oscillator (OPO) pump ...
SBIR Phase I 1997 Department of Commerce -
Autonomous Agents for Distributed Problem Solving, Planning and Control
SBC: Intelligent Automation, Inc. Topic: N/AN/A
SBIR Phase I 1996 Department of Commerce -
Reuse Support Tools for Automated Constructino of Software Systems
SBC: Advanced Systems Technology, Inc. Topic: N/AReuse in software engineering is an exciting concept that has yet to be reliably implemented. The number of program subroutines that are truly generic (and therefore applicable across all applications) is limited. However, there are specific applications that are required by many organizations, albeit with a set of constraints specific to each organization. This project proposes to design a too ...
SBIR Phase I 1995 Department of Commerce -
Self-Monitoring Surveillance System for Prestressing Tendons
SBC: Construction Technology Topic: N/AN/A
SBIR Phase I 1995 Nuclear Regulatory Commission -
Development of a Performance Assessment Process Controller
SBC: Innovative Tech. Solutions Topic: N/AN/A
SBIR Phase I 1995 Nuclear Regulatory Commission -
Advanced Digital Man-Machine Interface Analysis
SBC: Ryan Nuclear, Inc. Topic: N/AN/A
SBIR Phase I 1995 Nuclear Regulatory Commission -
A Detection System for Determining the Concentration, Size, and Depth of Buried Radioactive Material
SBC: Shonka Research Associates Topic: N/AN/A
SBIR Phase I 1995 Nuclear Regulatory Commission -
Inservice Diagnostics of Motor Operated Valves
SBC: ACENTECH INC Topic: N/AN/A
SBIR Phase I 1995 Nuclear Regulatory Commission -
Stable Filterless Solar-Blind UV Photodiodes Based on Silicon
SBC: Spire Corporation Topic: N/AThe proposed program will investigate fabrication of low-cost and stable Si- based filterless solar-blind UV detectors on radiation-hard silicon-on-insulator (SOI) structures. By fabricating detectors on silicon thin films, the active device layer thickness can be chosen so that shortwave photons are detected within the active layer, while the longer wavelengths are absorbed in a substrate which i ...
SBIR Phase I 1997 Department of Commerce -
Environmental Benign Ion Beam-Based Flame Retardant Treatment
SBC: Spire Corporation Topic: N/AA fire fighter's ability to effectively combat fire is strongly dependant on the degree to which his clothing limits exposure to heat and flame. Available heat- and flame-retardant garments significantly increase exposure, but use environmentally hazardous additives; additionally, further enhancements in flame-retardation are deisred. Recent research at Oak Ridge National Laboratory and elsewher ...
SBIR Phase I 1996 Department of Commerce