You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY22 is not expected to be complete until September, 2023.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
Displaying 11 - 20 of 60 results
-
AUTOMATED ADAPTIVE SIGNAL PROCESSING ALGORITHM (AASP) FOR ELIMINATING INTERFERENCE SIGNALS FROM DOPPLER RADAR WIND PROFILERS
SBC: ENSCO Inc Topic: N/AN/A
SBIR Phase I 1996 National Aeronautics and Space Administration -
Damping Of Aerodynamic Instability With Active Tip Clearance Control
SBC: SYNCHRONY, INC. Topic: N/AN/A
SBIR Phase I 1997 National Aeronautics and Space Administration -
Lidar Systems For Atmospheric Measurements
SBC: FIBERTEK, INC. Topic: N/AN/A
SBIR Phase I 1997 National Aeronautics and Space Administration -
CHEMICALLY MODIFIED ELECTRODES FOR IMPROVED CAPACITY AND LIFE IN RECHARGEABLE LITHIUM BATTERIES
SBC: TPL, Inc. Topic: N/AN/A
SBIR Phase I 1996 National Aeronautics and Space Administration -
Micron-Sized Fibrous Oxide Electrode Materials For High Energy Density, Rechargeable Lithium Batteries
SBC: TPL, Inc. Topic: N/AN/A
SBIR Phase I 1997 National Aeronautics and Space Administration -
Fast Dynamical Simulations Of Power Electronic Circuits
SBC: BARRON ASSOCIATES INC Topic: N/AN/A
SBIR Phase I 1997 National Aeronautics and Space Administration -
Saturable Self-Sensing Magnetic Bearings
SBC: BARRON ASSOCIATES INC Topic: N/AN/A
SBIR Phase I 1997 National Aeronautics and Space Administration -
HIGH-TEMPERATURE FINISH FOR AMB-21 MATRIX COMPOSITES
SBC: Adherent Technologies, Inc. Topic: N/AN/A
SBIR Phase I 1996 National Aeronautics and Space Administration -
SPACECRAFT OPERATIONAL AUTONOMOUS REASONING SYSTEM (SOARS)
SBC: Scientific Simulation Inc Topic: N/AN/A
SBIR Phase I 1996 National Aeronautics and Space Administration -
Computer-Assisted Performance Metrics Identification
SBC: Omni Engineering, Inc. Topic: N/AN/A
SBIR Phase I 1997 National Aeronautics and Space Administration