You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Noncontact Viscosity Measurement of Molten Glass Using Laser-Generated Ultrasound for Process Control During Melting and Forming Operations

    SBC: KARTA TECHNOLOGIES            Topic: N/A

    40879 November 13, 1996 Karta Technology, Inc. In almost all glass-manufacturing processes, production yield depends critically on the viscosity of the melt. Because the glass viscosity is a function of temperature, most active control systems monitor the temperature of the molten glass. However, temperature readings are not reliable for measuring viscos ...

    SBIR Phase I 1996 Department of Energy
  2. FORECASTING RESERVOIR THICKNESS WITH FRACTALS

    SBC: Nw Resources            Topic: N/A

    THE NATION DESIRES TO EXPAND THE USE OF CLEAN BURNING, COMPETITIVELY PRICED NATURAL GAS. THE INCREASED DEMAND FOR NATURAL GAS HAS PROMPTED NEW DRILLING IN ESTABLISHED GAS FIELDS. THE PROPER PLACEMENT OF THE NEW WELLS IS DEPENDENT ON THE GAS FORMATION PROPERTIES BETWEEN THE EXISTING WELLS. ONE OF THE PROPERTIES IS THE THICKNESS OF THE GAS BEARING ZONE. IT IS GENERALLY ACCEPTED THAT THE FORMATIO ...

    SBIR Phase I 1994 Department of Energy
  3. A MULTIMEDIA-AUGMENTED SOFTWARE TUTORIAL FOR THE HIGH ACCEPTANCE RECOIL POLARIMETER DEVICE

    SBC: PLANNING SYSTEMS, INC.            Topic: N/A

    THIS PROJECT WILL ASSESS THE FEASIBILITY OF USING MULTIMEDIA-AUGMENTED SOFWEARE TUTORIALS TO SUPPORT TEACHING THE PRINCIPLES OF EXPERIMENTAL NUCLEAR PHYSICS. THE DETECTOR SYSTEM FOR THE PHOTON TAGGING FACILITY AT THE CONTINUOUS ELECTRON BEAM ACCELERATOR FACILITY (CEBAF) IN NEWPORT NEWS, VIRGINIA IS NOW UNDER CONSTRUCTION AT THE NUCLEAR DETECTOR LABORATORY OF THE CENTER FOR NUCLEAR STUDIES OF THE ...

    SBIR Phase I 1994 Department of Energy
  4. High-Flux, Low Energy, Ion Source for High Rate Ion-Assisted Deposition of Hard Coatings

    SBC: Plasmaquest, Inc.            Topic: N/A

    45 High-Flux, Low Energy, Ion Source for High Rate Ion-Assisted Deposition of Hard Coatings--PlasmaQuest, Inc., 850 North Dorothy Drive, Suite 504, Richardson, TX 75081-2769; (972) 680-1811 Dr. Chris Doughty, Principal Investigator Dr. John E. Spencer, Business Official DOE Grant No. DE-FG03-97ER82459 Amount: $75,000 Hard coatings have many applications in the transportation, manufacturing an ...

    SBIR Phase I 1997 Department of Energy
  5. REDESIGN OF AMMONIA ABSORPTION REFRIGERATION UNITS FOR LOW TEMPERATURE APPLICATIONS IN NATURAL GAS PROCESSING

    SBC: Process Technology Inc.            Topic: N/A

    GAS TRANSMISSION PIPELINES REQUIRE NATURAL GAS DELIVERED TO THEM TO MEET A HYDROCARBON (HC) DEWPOINT SPECIFICATION IN ORDER THAT THE HC LIQUIDS ARE NOT DROPPED OUT IN THE LINE DURING TRANSMISSION. SIMILAR SPECIFICATIONS ARE IMPOSED BY PLANT OPERATORS ON THE FUEL GAS THAT IS CONSUMED BY THEIR MACHINERY. A MARKET EXISTS FOR AN ECONOMICAL AMMONIA (NH3) ABSORPTION UNIT TO REPLACE COMPRESSION UNITS U ...

    SBIR Phase I 1994 Department of Energy
  6. AN INTELLIGENT TUTORING GAME TO TEACH SCIENTIFIC REASONING

    SBC: Research Development Corporation            Topic: N/A

    N/A

    SBIR Phase I 1994 Department of Energy
  7. SEPARATION OF URANIUM-IRON ALLOY FROM THE ATOMIC VAPOR LASER ISOTOPE SEPARATION PROCESS INO URANIUM HEXAFLUORIDE AND IRON

    SBC: Santa Fe Alloys            Topic: N/A

    A MOLTEN SALT PROCESS IS DESCRIBED FOR SEPARATING THE COMPONENTS OF THE ALLOY OF ENRICHED URANIUM AND IRON WHICH IS THE PRODUCT OF THE ATOMIC VAPOR LASER ISOTOPE SEPARATION (AVLIS) PROCESS TO ENRICH THE (235)U CONTENT OF THE PRENT METAL. A SIMPLE SEPARATION WOULD DISSOLVE THE ENRICHED URANIUM HEXAFLUORIDE WHICH WOULD BE RECOVERED AND PURIFIED BY VAPORIZATION FROM THE MOLTEN SALT. VAPORIZED AND CON ...

    SBIR Phase I 1993 Department of Energy
  8. HIGH QUALITY CHEMICALLY VAPOR DEPOSITED NIOBIUM COATINGS FOR SUPERCONDUCTING RADIO FREQUENCY CAVITIES

    SBC: Sumi Tech, Inc.            Topic: N/A

    TRADITIONALLY, SUPE2RCONDUCTING CAVITIES FOR LARGE ELECTRON POSITION COLLIDERS ARE FABRICATED FROM HIGH PURITY NIOBIUM (NB) SHEETS USING LATHE SPINNING AND WELDING. THESE CAVITIES SUFFER FROM THE PROBLEM OF THERMOMAGNETIC BREAKDOWN RESULTING FROM THE RELATIVELY POOR THERMAL CONDUCTIVITY OF NB AT LIQUID HELIUM TEMPERATURES. A MORE ELEGANT AND LOW COST SOLUTION TO THE BREAKDOWN PROBLEMS IS THE USE ...

    SBIR Phase I 1994 Department of Energy
  9. High Current Diamond Microtip Cathode

    SBC: Systems & Processes Engineering Corporation            Topic: N/A

    155 High Current Diamond Microtip Cathode--Systems & Processes Engineering Corporation (SPEC), 401 Camp Craft Road, Austin, TX 78746-6558; (512) 306-1100 Dr. Keith D. Jamison, Principal Investigator Ms. Diane Joyce, Business Official DOE Grant No. DE-FG03-97ER82493 Amount: $75,000 There exists a continuing need for high current, field emission electron sources (i.e., cold cathodes) for use in ...

    SBIR Phase I 1997 Department of Energy
  10. Large Room Temperature Cd1-xZnxTe Detectors

    SBC: World Physics Technologies, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of Energy
US Flag An Official Website of the United States Government