You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY22 is not expected to be complete until September, 2023.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

  1. Enzyme Facilitated Transport Membranes

    SBC: Sapient Catalytechs, Inc.            Topic: N/A

    29 Enzyme Facilitated Transport Membranes--Sapient Catalytechs, Inc., P.O. Box 580284, , Houston, TX 77258-0284; (281) 333-5093 Dr. Russell L. Smith, Principal Investigator Dr. Michael C. Trachtenberg, Business Official DOE Grant No. DE-FG03-97ER82472 Amount: $74,990 There is a great need for improvements in efficient methods to reduce the cost of removing carbon dioxide from flue gas and nat ...

    SBIR Phase I 1997 Department of Energy
  2. High Current Diamond Microtip Cathode

    SBC: Systems & Processes Engineering Corporation            Topic: N/A

    155 High Current Diamond Microtip Cathode--Systems & Processes Engineering Corporation (SPEC), 401 Camp Craft Road, Austin, TX 78746-6558; (512) 306-1100 Dr. Keith D. Jamison, Principal Investigator Ms. Diane Joyce, Business Official DOE Grant No. DE-FG03-97ER82493 Amount: $75,000 There exists a continuing need for high current, field emission electron sources (i.e., cold cathodes) for use in ...

    SBIR Phase I 1997 Department of Energy
  3. Crosswell Seismic in Three Dimensions

    SBC: Tomoseis, Inc.            Topic: N/A

    106 Crosswell Seismic in Three Dimensions--TomoSeis, Inc., 1650 West Sam Houston Parkway North, , Houston, TX 77043-3115; (713) 461-7360 Dr. Spyros Lazaratos, Principal Investigator Mr. Bruce P. Marion, Business Official DOE Grant No. DE-FG03-97ER82502 Amount: $74,997 Improved recovery of oil and gas from mature domestic fields depends on the detailed characterization of reservoir st ...

    SBIR Phase I 1997 Department of Energy
  4. Analysis of Accelerator Tuning Algorithms for Integration with an Automatic Planning and Control System

    SBC: Vista Control Systems, Inc.            Topic: N/A

    145 Analysis of Accelerator Tuning Algorithms for Integration with an Automatic Planning and Control System--Vista Control Systems, Inc., 134-B Eastgate Drive, Los Alamos, NM 87544-3304; (505) 662-2484 Mr. Michael Kroupa, Principal Investigator Mr. Peter N. Klout, Business Official DOE Grant No. DE-FG03-97ER82506 Amount: $74,999 Particle accelerators have moved from being strictly a research ...

    SBIR Phase I 1997 Department of Energy
  5. An Easily Dispersed Reactive Coating for Surface Decontamination

    SBC: LYNNTECH INC            Topic: N/A

    126 An Easily Dispersed Reactive Coating for Surface Decontamination--Lynntech, Inc., 7610 Eastmark Drive, Suite 105, College Station, TX 77840-4023; (409) 693-0017 Dr. Anthony Giletto, Principal Investigator Dr. Oliver J. Murphy, Business Official DOE Grant No. DE-FG03-97ER82420 Amount: $75,000 Terrorist nerve gas attacks are a growing concern facing emergency response teams. Decontam ...

    SBIR Phase I 1997 Department of Energy
  6. Novel Separation Method Based On The Electrosynthesis of Dual Oxidants

    SBC: LYNNTECH INC            Topic: N/A

    11 Novel Separation Method Based On The Electrosynthesis of Dual Oxidants--Lynntech, Inc., 7610 Eastmark Drive, Suite 105, College Station, TX 77840-4024; (409) 693-0017 Dr. Adrian Denvir, Principal Investigator Dr. Oliver J. Murphy, Business Official DOE Grant No. DE-FG03-97ER82421 Amount: $75,000 There are 110 million cubic meters of groundwater and surface water on Department of Ene ...

    SBIR Phase I 1997 Department of Energy
  7. A Novel Mass Spectrometer for Characterization of Electrochemical Processes

    SBC: SOUTHWEST SCIENCES INC            Topic: N/A

    63 A Novel Mass Spectrometer for Characterization of Electrochemical Processes--Southwest Sciences, Inc., 1570 Pacheco Street, Suite E-11, Santa Fe, NM 87505-3937; (505) 984-1322 Dr. David S. Bomse, Principal Investigator Mr. Alan C. Stanton, Business Official DOE Grant No. DE-FG03-97ER82478 Amount: $75,000 Electrochemical processes are important to a wide variety of energy related systems suc ...

    SBIR Phase I 1997 Department of Energy
  8. Development of Scintillators and Waveshifters for Detection of Ionizing Radiation

    SBC: LUDLUM MEASUREMENTS INC            Topic: N/A

    182 Development of Scintillators and Waveshifters for Detection of Ionizing Radiation--Ludlum Measurements, Inc., PO Box 810, Sweetwater, TX 79556-0810; (915) 235-5494 Mr. Charles R. Hurlbut, Principal Investigator Mr. Donald G. Ludlum, Business Official DOE Grant No. DE-FG03-97ER82419 Amount: $75,000 High-energy particle accelerators at Fermi National Accelerator Laboratory and Brookhaven N ...

    SBIR Phase I 1997 Department of Energy
  9. Ultrafast Polysilylene Scintillators

    SBC: Adherent Technologies, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of Energy
  10. Template-Medicated Synthesis of Periodic Membranes for Improved Liquid-Phase Separations

    SBC: American Research Corporation of Virginia            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of Energy
US Flag An Official Website of the United States Government