You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. DEVELOPMENT OF A HARDNESS ASSURANCE THROUGHPUT OPTIMIZED TESTER

    SBC: MISSION RESEARCH CORP.            Topic: N/A

    INTEGRATED CIRCUIT (IC) PRODUCTION LINES OPERATING UNDER MIL-I-38535 HAVE RADIATION HARNESS ASSURANCE (RHA) AND RELIABILITY DESIGNED AND BUILT INTO THEIR TECHNOLOGY. HARDNESS AND RELIABILITY ARE MAINTAINED BY APPLYING STATISTICAL PROCESS CONTROLS (SPCS) TO TEST STRUCTURES FABRICATED ALONGSIDE PRODUCT MICROCIRCUITS. MEASUREMENT AND DATA REDUCTION TECHNIQUES PRESENTLY EMPLOYED ARE SLOW AND COSTLY AN ...

    SBIR Phase II 1994 Department of DefenseDefense Threat Reduction Agency
  2. Microcomputer-Based Collateral-Effects Source Model for Hazardous Material Dispersal in Vent Plumes from Attacks on Hardened Structures

    SBC: SCIENCE & ENGINEERING ASSOC., INC.            Topic: N/A

    THE DEFENSE NUCLEAR AGENCY (DNA) IS DEVELOPING THE OPERATIONAL MESOSCALE ENVIRONMENT MODEL WITH GRID ADAPTIVITY (OMEGA) TO PREDICT REAL-TIME DISPERSAL OF HAZARDOUS AEROSOLS. ONE REQUIREMENT FOR OMEGA OR ANY SIMILAR MODEL IS TO PREDICT COLLATERAL EFFECTS FROM STRIKES ON NUCLEAR, BIOLOGICAL, AND CHEMICAL (NBC) FACILITIES. THE OBJECTIVE OF THE PROPOSED PHASE I PROGRAM IS TO DETERMINE THE ESSENTIAL FE ...

    SBIR Phase I 1994 Department of DefenseDefense Threat Reduction Agency
  3. A PORTABLE IMAGING SYSTEM FOR NONDESTRUCTIVE EXAMINATION OF NUCLEAR POWER PLANT COMPONENTS

    SBC: TPL, INC            Topic: N/A

    THE DIFFICULTY IN PREDICTING STRUCTURAL DEGRADATION RATES FOR NUCLEAR POWER PLANT COMPONENTS DUE TO CORROSION AND OTHER FACTORS HAS LED TO THE NEED FOR COSTLY, TIME CONSUMING INSPECTIONS AND INCREASED COST FROM INTENTIONALLY OVERDESIGNED COMPONENTS. THE SITUATION INDICATES A SERIOUS, UNMET NEED FOR A SIMPLE BUT ACCURATE SYSTEM FOR REAL- TIME, IN SITU, NONDESTRUCTIVE ANALYSIS OF NUCLEAR POWER PLANT ...

    SBIR Phase II 1994 Nuclear Regulatory Commission
  4. AN YTTRIUM ALUMINUM PEROVSKITE BASED GAMMA-RAY DOSIMETER

    SBC: W Peter Trower Inc.            Topic: N/A

    N/A

    SBIR Phase I 1994 Nuclear Regulatory Commission
  5. NEW TECHNOLOGIES FOR IMPROVED SIMULATION OF NUCLEAR WEAPON EFFECTS

    SBC: Ares Corporation            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of DefenseDefense Threat Reduction Agency
  6. HOLOGRAPHIC PATTERN RECOGNITION FOR ARMS CONTROL

    SBC: EMPIRICAL TECHNOLOGIES CORPORATION            Topic: N/A

    THE CONTRACTOR HAS PATENTED TECHNOLOGY FOR A UNIQUE PROCESS THAT DIRECTLY CONVERTS AN ACOUSTIC SIGNAL INTO A VISIBLE ONE IN REAL-TIME WITHOUT ELECTRONIC CIRCUITRY. THIS RELIES ON THE ACOUSTO-OPTICAL PROPERTIES OF A CONTINUOUS LAYER OF LIQUID CRYSTAL THIN FILM LAYER WHICH SERVES AS BOTH THE SENSOR AND THE DISPLAY. THE IMAGE CAN BE VIEWED DIRECTLY BY MEANS OF CCD CAMERA. HOLOGRAPHY PROVIDES FOR BOTH ...

    SBIR Phase I 1990 Department of DefenseDefense Threat Reduction Agency
  7. NOVEL UNDERWATER SHOCK WAVE MEASUREMENT

    SBC: KTECH CORP.            Topic: N/A

    THE PROPOSED EFFORT WILL DEVELOP AND APPLY A NEW EXPERIMENTAL APPROACH TO MEASURE UNDERWATER TIME RESOLVED SHOCK WAVE PROFILES RESULTING FROM UNDERWATER OR SURFACE DETONATIONS. EXPLICIT DATA REQUIRED TO DESCRIBE UNDERWATER SHOCK WAVE EFFECTS ON TARGETS WILL BE OBTAINED USING A RECENTLY DEVELOPED PIEZOELECTRIC POLYMER STRESS GAUGE. A UNIQUE EXPERIMENTAL CONFIGURATION IS PROPOSED, THAT WILL ALLOW SH ...

    SBIR Phase I 1990 Department of DefenseDefense Threat Reduction Agency
  8. FAST-RISE HIGH PRESSURE GAUGE FOR LONG-DURATION NUCLEAR AIRBLAST

    SBC: KTECH CORP.            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of DefenseDefense Threat Reduction Agency
  9. ELECTROMAGNETIC ENVIRONMENTAL EFFECTS WITHIN A NUCLEAR POWER PLANT

    SBC: MISSION RESEARCH CORP.            Topic: N/A

    MRC PROPOSES TO DEVELOP A SAFETY PERFORMANCE INDICATOR (PI) OF THE ELECTROMAGNETIC (EM) PROTECTION STATUS OF A NUCLEAR POWER PLANT (NPP). WE BELIEVE THAT SUCH A PI IS NEEDED BECAUSE: (1) EM ENVIRONMENTAL POLLUTION IS ON THE INCREASE,(2) ADDITIONAL EM THREATS MUST BE EVALUATED, AND (3) DISRUPTION OF NPP OPERATIONS BY EM EFFECTS CAN AND MUST BE AVOIDED. PREVIOUS STUDIES HAVE ADDRESSED THE ISSUE OF E ...

    SBIR Phase I 1990 Nuclear Regulatory Commission
  10. PLASMA DRIVEN WATER SHOCK

    SBC: MISSION RESEARCH CORP.            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of DefenseDefense Threat Reduction Agency
US Flag An Official Website of the United States Government