You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY22 is not expected to be complete until September, 2023.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

  1. EXPERT ASSISTANT FOR STRUCTURED SOFTWARE DEVELOPMENT

    SBC: Sps Software Products & Servic            Topic: N/A

    SPS SHALL UNDERTAKE AND R&D EFFORT TO INVESTIGATE THE FEASIBILITY AND EFFECTIVENESS OF AN "INTELLIGENT EXPERT ASSISTANT" WHICH APPLIES EXPERT SYSTEM TECHNOLOGY IN CONJUNCTION WITH COMPUTER-AIDED SOFTWARE ENGINEERING (CASE) TOOLS FOR STRUCTURED SOFTWARE DEVELOPMENT. THE RESEARCH OBJECTIVE IS TO SHOW THAT HIGHER-QUALITY, FASTER, AND MORE EFFICIENT SOFTWARE DEVELOPMENT IS ACHIEVABLE WITH AN EXPERT SY ...

    SBIR Phase II 1989 Department of DefenseNavy
  2. AUTOMATED BEST SOURCE SELECTOR

    SBC: Hunter Research Inc.            Topic: N/A

    THIS PROPOSAL ADDRESSES THE NEED TO PROVIDE AN AUTOMATIC BEST SOURCE SELECTION OR BEST DATA ESTIMATE FOR UP TO SIX SPACE-DIVERSIFIED SOURCES OF TELEMETRY DATA. AN AUTOMATED BEST SOURCE SELECTOR IS PROPOSED WHICH MEETS THE REQUIREMENT WITH THREE OUTPUT MODES; A BEST SOURCE SELECTION, A BEST ESTIMATE VIA MAJORITY VOTING, AND COMBINED MODE WHICH AUTOMATICALLY OUTPUTS THE BEST SOURCE WHEN AT LEAST ONE ...

    SBIR Phase II 1989 Department of DefenseNavy
  3. IMPLEMENTATION OF ADA ON DISTRIBUTED MICROPROCESSOR COMPUTER ARCHITECTURES FOR AIRCREW TRAINING SYSTEMS

    SBC: Integrated Software Inc            Topic: N/A

    THE PROPOSED PROJECT WILL DEVELOP A PLAN FOR IMPLEMENTING AND EVALUATING ADA AS THE SOFTWARE LANGUAGE ON MAJOR TRAINING SYSTEMS ACQUISITIONS WHICH INCORPORATE DISTRIBUTED MICROPROCESSORS AS THE SIMULATION SYSTEM. MANY IMPLEMENTATION ISSUES HAVE BEEN DEFINED FOR SINGLE MICROPROCESSOR REAL-TIME SYSTEMS PROGRAMMED IN ADA AND SOME SOLUTIONS ARE BEING DEVELOPED. HOWEVER SIMILAR DEFINITIONS AND SOLUTION ...

    SBIR Phase II 1988 Department of DefenseNavy
  4. INDEPENDENT VALIDATION AND VERIFICATION OF TACTICAL AIR OPERATIONS CENTRAL- '85 SOFTWARE

    SBC: Pacer Systems            Topic: N/A

    THE TACTICAL AIR OPERATIONS CENTRAL - 1985 (TAOC-85) ENGINEERING DEVELOPMENT MODEL (EDM) SOFTWARE/FIRMWARE IS BASELINED TO 1979 - 1980 MILITARY DOCUMENTATION STANDARDS. INDEPENDENT VALIDATION AND VERIFICATION (IV&V) OF THIS COMPLEX PROGRAM PACKAGE IS REQUIRED. THE FIRST PHASE OF THIS SMALL BUSINESS INNOVATIVE RESEARCH PROGRAM IS TO PREPARE AN INDEPENDENT VALIDATION AND VERIFICATION PLAN WHICH WILL ...

    SBIR Phase II 1988 Department of DefenseNavy
US Flag An Official Website of the United States Government