You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. EXPERT ASSISTANT FOR STRUCTURED SOFTWARE DEVELOPMENT

    SBC: Sps Software Products & Servic            Topic: N/A

    SPS SHALL UNDERTAKE AND R&D EFFORT TO INVESTIGATE THE FEASIBILITY AND EFFECTIVENESS OF AN "INTELLIGENT EXPERT ASSISTANT" WHICH APPLIES EXPERT SYSTEM TECHNOLOGY IN CONJUNCTION WITH COMPUTER-AIDED SOFTWARE ENGINEERING (CASE) TOOLS FOR STRUCTURED SOFTWARE DEVELOPMENT. THE RESEARCH OBJECTIVE IS TO SHOW THAT HIGHER-QUALITY, FASTER, AND MORE EFFICIENT SOFTWARE DEVELOPMENT IS ACHIEVABLE WITH AN EXPERT SY ...

    SBIR Phase II 1989 Department of DefenseNavy
  2. LARGE WAVES IN CHANNELS

    SBC: Taylor & Divoky Inc.            Topic: N/A

    IMPULSIVE SOURCES (LANDSLIDES, EXPLOSIONS, AND SO FORTH) ARE CAPABLE PRODUCING EXTREMELY LARGE WAVES IN SUFFICIENTLY DEEP WATER. IF CONTAINED IN A STEEP-WALLED FORD-LIKE CHANNEL, SUCH WAVES CAN BE PROPAGATED WITH LITTLE LOSS OF ENERGY OVER SIGNIFICANT DISTANCES. THE MAJOR ENERGY DISSIPATOR IN THIS CASE MIGHT BE THE OCCURRENCE OF BREAKING IN THE NARROW SHALLOW ZONES ALONG EACH BANK; THIS LOSS MECHA ...

    SBIR Phase II 1988 Department of DefenseDefense Threat Reduction Agency
  3. Develop a Lightweight Electronic Equipment Enclosure

    SBC: Xc Associates, Inc.            Topic: N/A

    The Navy is imposing weight limits on the Cooperative Engagement (CeC) Program, the electronic equipment racks presently used by the Navy are very heavy and expensive to produce, this Program will develop a lightweight rack which will meet the operational requirements and be less expensive to product. Military systems are becoming increasingly complex and have to meet a larger arra of requirement ...

    SBIR Phase II 1998 Department of DefenseNavy
  4. Tempus: A Real- Time Measurement Project

    SBC: MODUS OPERANDI INC            Topic: N/A

    Throughput has been an issue for embedded and stand-alone real-time systems for many years. Systems rarely exhibit the performance necessary for successful operation in the field without significant rework to reduce time requirements after the initial software development. SPS proposes Project Tempus to develop a software measure that predicts the performance of a real-time system early in its d ...

    SBIR Phase II 1998 Department of DefenseNavy
US Flag An Official Website of the United States Government