You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY22 is not expected to be complete until September, 2023.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
-
INDEPENDENT VALIDATION AND VERIFICATION OF TACTICAL AIR OPERATIONS CENTRAL- '85 SOFTWARE
SBC: Pacer Systems Topic: N/ATHE TACTICAL AIR OPERATIONS CENTRAL - 1985 (TAOC-85) ENGINEERING DEVELOPMENT MODEL (EDM) SOFTWARE/FIRMWARE IS BASELINED TO 1979 - 1980 MILITARY DOCUMENTATION STANDARDS. INDEPENDENT VALIDATION AND VERIFICATION (IV&V) OF THIS COMPLEX PROGRAM PACKAGE IS REQUIRED. THE FIRST PHASE OF THIS SMALL BUSINESS INNOVATIVE RESEARCH PROGRAM IS TO PREPARE AN INDEPENDENT VALIDATION AND VERIFICATION PLAN WHICH WILL ...
SBIR Phase II 1988 Department of DefenseNavy -
EXPERT ASSISTANT FOR STRUCTURED SOFTWARE DEVELOPMENT
SBC: Sps Software Products & Servic Topic: N/ASPS SHALL UNDERTAKE AND R&D EFFORT TO INVESTIGATE THE FEASIBILITY AND EFFECTIVENESS OF AN "INTELLIGENT EXPERT ASSISTANT" WHICH APPLIES EXPERT SYSTEM TECHNOLOGY IN CONJUNCTION WITH COMPUTER-AIDED SOFTWARE ENGINEERING (CASE) TOOLS FOR STRUCTURED SOFTWARE DEVELOPMENT. THE RESEARCH OBJECTIVE IS TO SHOW THAT HIGHER-QUALITY, FASTER, AND MORE EFFICIENT SOFTWARE DEVELOPMENT IS ACHIEVABLE WITH AN EXPERT SY ...
SBIR Phase II 1989 Department of DefenseNavy -
LARGE WAVES IN CHANNELS
SBC: Taylor & Divoky Inc. Topic: N/AIMPULSIVE SOURCES (LANDSLIDES, EXPLOSIONS, AND SO FORTH) ARE CAPABLE PRODUCING EXTREMELY LARGE WAVES IN SUFFICIENTLY DEEP WATER. IF CONTAINED IN A STEEP-WALLED FORD-LIKE CHANNEL, SUCH WAVES CAN BE PROPAGATED WITH LITTLE LOSS OF ENERGY OVER SIGNIFICANT DISTANCES. THE MAJOR ENERGY DISSIPATOR IN THIS CASE MIGHT BE THE OCCURRENCE OF BREAKING IN THE NARROW SHALLOW ZONES ALONG EACH BANK; THIS LOSS MECHA ...
SBIR Phase II 1988 Department of DefenseDefense Threat Reduction Agency -
Develop a Lightweight Electronic Equipment Enclosure
SBC: Xc Associates, Inc. Topic: N/AThe Navy is imposing weight limits on the Cooperative Engagement (CeC) Program, the electronic equipment racks presently used by the Navy are very heavy and expensive to produce, this Program will develop a lightweight rack which will meet the operational requirements and be less expensive to product. Military systems are becoming increasingly complex and have to meet a larger arra of requirement ...
SBIR Phase II 1998 Department of DefenseNavy