You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY22 is not expected to be complete until September, 2023.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

  1. OPERATIONAL NUCLEAR EMPLOYMENT PLANNING

    SBC: Lb&m Assoc., Inc.            Topic: N/A

    THE VERY POLITICALLY SENSITIVE NATURE OF NUCLEAR WARFARE WOULD PRESUPPOSE THAT THE ABILITY OF THE COMMANDER TO PLAN FOR THE USE OF WEAPONS OF THIS TYPE WOULD CREATE THE NEED FOR A METHOD WHICH WOULD BE AS FOOL-PROOF AS POSSIBLE. EARLY WEAPONS WERE DESIGNATED STRATEGIC WEAPONS WHILE LATER DEVELOPED WEAPONS WERE CALLED TACTICAL. IT WAS WITH THE EVOLUTION TO TACTICAL WEAPONS THAT EXTENSIVE POSITIVE C ...

    SBIR Phase II 1988 Department of DefenseDefense Threat Reduction Agency
  2. SHALLOW WATER SONAR SYSTEM

    SBC: Mission Sciences Corp.            Topic: N/A

    A SHALLOW WATER SONAR SYSTEM WILL BE DESIGNED AND ANALYZED USING A UNIQUE RAY-BASED SHALLOW WATER PROPAGATION AND REVERBERATION MODEL. THE BASELINE CANDIDATE SYSTEM IS A PLANAR ARRAY SONAR IN A VDS CONFIGURATION. THE ARRAY USES LIGHTWEIGHT CYLINDRICAL TRANSMITTING ELEMENTS AND DIFAR RECEIVING ELEMENTS TO ACHIEVE EXCELLENT PERFORMANCE IN A COMPACT CONFIGURATION. ITS SIZE AND WEIGHT ARE APPROPRIATE ...

    SBIR Phase II 1989 Department of DefenseNavy
  3. Tempus: A Real- Time Measurement Project

    SBC: Modus Operandi, Inc.            Topic: N/A

    Throughput has been an issue for embedded and stand-alone real-time systems for many years. Systems rarely exhibit the performance necessary for successful operation in the field without significant rework to reduce time requirements after the initial software development. SPS proposes Project Tempus to develop a software measure that predicts the performance of a real-time system early in its d ...

    SBIR Phase II 1998 Department of DefenseNavy
  4. VARIABLE SPEED COMPATIBLE REFUELING DROGUE FOR REFUELING FIXED/ROTOR WING AIRCRAFT

    SBC: Decel Inc.            Topic: N/A

    U.S.M.C. CURRENT MUST MAINTAIN TWO SEPARATE SYSTEMS FOR MID AIR REFUELING; A LOW SPEED SYSTEM FOR HELICOPTERS AND A HIGH SPEED SYSTEM FOR JETS. THIS STUDY PROPOSES A RETROFIT TO EACH SYSTEM FOR DUAL PURPOSE FUNCTIONS.

    SBIR Phase II 1988 Department of DefenseNavy
US Flag An Official Website of the United States Government