You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Enzyme Facilitated Transport Membranes
SBC: Sapient Catalytechs, Inc. Topic: N/A29 Enzyme Facilitated Transport Membranes--Sapient Catalytechs, Inc., P.O. Box 580284, , Houston, TX 77258-0284; (281) 333-5093 Dr. Russell L. Smith, Principal Investigator Dr. Michael C. Trachtenberg, Business Official DOE Grant No. DE-FG03-97ER82472 Amount: $74,990 There is a great need for improvements in efficient methods to reduce the cost of removing carbon dioxide from flue gas and nat ...
SBIR Phase I 1997 Department of Energy -
High Current Diamond Microtip Cathode
SBC: Systems & Processes Engineering Corporation Topic: N/A155 High Current Diamond Microtip Cathode--Systems & Processes Engineering Corporation (SPEC), 401 Camp Craft Road, Austin, TX 78746-6558; (512) 306-1100 Dr. Keith D. Jamison, Principal Investigator Ms. Diane Joyce, Business Official DOE Grant No. DE-FG03-97ER82493 Amount: $75,000 There exists a continuing need for high current, field emission electron sources (i.e., cold cathodes) for use in ...
SBIR Phase I 1997 Department of Energy -
Crosswell Seismic in Three Dimensions
SBC: Tomoseis, Inc. Topic: N/A106 Crosswell Seismic in Three Dimensions--TomoSeis, Inc., 1650 West Sam Houston Parkway North, , Houston, TX 77043-3115; (713) 461-7360 Dr. Spyros Lazaratos, Principal Investigator Mr. Bruce P. Marion, Business Official DOE Grant No. DE-FG03-97ER82502 Amount: $74,997 Improved recovery of oil and gas from mature domestic fields depends on the detailed characterization of reservoir st ...
SBIR Phase I 1997 Department of Energy -
Analysis of Accelerator Tuning Algorithms for Integration with an Automatic Planning and Control System
SBC: Vista Control Systems, Inc. Topic: N/A145 Analysis of Accelerator Tuning Algorithms for Integration with an Automatic Planning and Control System--Vista Control Systems, Inc., 134-B Eastgate Drive, Los Alamos, NM 87544-3304; (505) 662-2484 Mr. Michael Kroupa, Principal Investigator Mr. Peter N. Klout, Business Official DOE Grant No. DE-FG03-97ER82506 Amount: $74,999 Particle accelerators have moved from being strictly a research ...
SBIR Phase I 1997 Department of Energy -
An Easily Dispersed Reactive Coating for Surface Decontamination
SBC: LYNNTECH INC Topic: N/A126 An Easily Dispersed Reactive Coating for Surface Decontamination--Lynntech, Inc., 7610 Eastmark Drive, Suite 105, College Station, TX 77840-4023; (409) 693-0017 Dr. Anthony Giletto, Principal Investigator Dr. Oliver J. Murphy, Business Official DOE Grant No. DE-FG03-97ER82420 Amount: $75,000 Terrorist nerve gas attacks are a growing concern facing emergency response teams. Decontam ...
SBIR Phase I 1997 Department of Energy -
Novel Separation Method Based On The Electrosynthesis of Dual Oxidants
SBC: LYNNTECH INC Topic: N/A11 Novel Separation Method Based On The Electrosynthesis of Dual Oxidants--Lynntech, Inc., 7610 Eastmark Drive, Suite 105, College Station, TX 77840-4024; (409) 693-0017 Dr. Adrian Denvir, Principal Investigator Dr. Oliver J. Murphy, Business Official DOE Grant No. DE-FG03-97ER82421 Amount: $75,000 There are 110 million cubic meters of groundwater and surface water on Department of Ene ...
SBIR Phase I 1997 Department of Energy -
A Novel Mass Spectrometer for Characterization of Electrochemical Processes
SBC: SOUTHWEST SCIENCES INC Topic: N/A63 A Novel Mass Spectrometer for Characterization of Electrochemical Processes--Southwest Sciences, Inc., 1570 Pacheco Street, Suite E-11, Santa Fe, NM 87505-3937; (505) 984-1322 Dr. David S. Bomse, Principal Investigator Mr. Alan C. Stanton, Business Official DOE Grant No. DE-FG03-97ER82478 Amount: $75,000 Electrochemical processes are important to a wide variety of energy related systems suc ...
SBIR Phase I 1997 Department of Energy -
Development of Scintillators and Waveshifters for Detection of Ionizing Radiation
SBC: LUDLUM MEASUREMENTS INC Topic: N/A182 Development of Scintillators and Waveshifters for Detection of Ionizing Radiation--Ludlum Measurements, Inc., PO Box 810, Sweetwater, TX 79556-0810; (915) 235-5494 Mr. Charles R. Hurlbut, Principal Investigator Mr. Donald G. Ludlum, Business Official DOE Grant No. DE-FG03-97ER82419 Amount: $75,000 High-energy particle accelerators at Fermi National Accelerator Laboratory and Brookhaven N ...
SBIR Phase I 1997 Department of Energy -
Ultrafast Polysilylene Scintillators
SBC: Adherent Technologies, Inc. Topic: N/AN/A
SBIR Phase I 1996 Department of Energy -
Template-Medicated Synthesis of Periodic Membranes for Improved Liquid-Phase Separations
SBC: American Research Corporation of Virginia Topic: N/AN/A
SBIR Phase I 1996 Department of Energy