You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
A High-Charge Electron Gun for Dielectric Type Wake-Field Accelerators
SBC: Fm Technologies Inc Topic: N/A149 A High-Charge Electron Gun for Dielectric Type Wake-Field Accelerators--FM Technologies, Inc., 10529-B Braddock Road, Fairfax, VA 22032-2236; (703) 425-5111 Dr. Frederick M. Mako, Principal Investigator Dr. Frederick M. Mako, Business Official DOE Grant No. DE-FG02-97ER82375 Amount: $75,000 The development of high-current, short-duration pulses of electrons used in injectors of particle a ...
SBIR Phase I 1997 Department of Energy -
A HIGH POWER SOLID-STATE AMPLIFIER
SBC: Amparo Corp.on Topic: N/AN/A
SBIR Phase I 1994 Department of Energy -
A HIGH POWER THICK TARGET DESIGN FOR IRRADIATION BY HIGH INTENSITY CHARGED PARTICLE BEAMS
SBC: Amparo Corp.on Topic: N/APHASE I ADDRESSES A NEW APPROACH FOR THE DESIGN OF HIGH POWER NUCLEAR TARGETS USED FOR PRODUCTION OF RADIOISOTOPES BY HIGH ENERGY CHARGED PARTICLE BEAMS, NOTABLY HIGH ENERGY PROTONS. SUCH TARGETS WILL YIELD LARGER QUANTITIES OF RADIOACTIVE SPECIES THAN PRESENTLY AVAILABLE, EITHER FOR BASIC RESEARCH (E.G., STUDIES USING RADIOACTIVE BEAMS) OR FOR APPLIED PURPOSES (E.G., PRODUCTION OF MEDICAL RADIOI ...
SBIR Phase I 1994 Department of Energy -
A HIGH SPATIAL RESOLUTION SPECTROGRAPH FOR DNA SEQUENCING
SBC: Chromex Inc. Topic: N/AIF THE HUMAN GENOME PROJECT IS TO BE SUCCESSFUL, MUCH MORE RAPID DNA SEQUENCING WILL BE REQUIRED. IT IS ESTIMATED THAT PRESENT TECHNOLOGY IS 100-500 TIMES TOO SLOW TO PERMIT SEQUENCING OF THE ENTIRE HUMAN GENOME BY THE ORIGINAL PROJECTED COMPLETION DATE OF 2005. CURRENTLY, THE MOST SUCCESSFUL TECHNOLOGY EMPLOYED FOR LARGE SCALE DNA SEQUENCING INVOLVES REAL-TIME, FOUR COLOR, FLUORESCENT LINE IMAGIN ...
SBIR Phase I 1993 Department of Energy -
A Low Cost Acoustic Property Sensor for Measuring Natural Gas Composition in Liquid Natural Gas (LNG) Powered Vehicles
SBC: Commercial Electronics, Inc. Topic: N/A86 A Low Cost Acoustic Property Sensor for Measuring Natural Gas Composition in Liquid Natural Gas (LNG) Powered Vehicles--Commercial Electronics, Inc., 801 North 15th Street, Broken Arrow, OK 74012-2838; (918) 251-0925 Mr. Scott Phillips, Principal Investigator Mr. Michael A. Phillips, Business Official DOE Grant No. DE-FG03-97ER82353 Amount: $75,000 Among the various alternative fuels propos ...
SBIR Phase I 1997 Department of Energy -
Alternative Metal Forming Using Laser Engineered Net Shaping
SBC: OPTOMEC, INC. Topic: N/A50 Alternative Metal Forming Using Laser Engineered Net Shaping--Optomec Design Company, 13170 B Central Avenue SE, Suite 310, Albuquerque, NM 87123-3032; (505) 343-9139 Mr. David M. Keicher, Principal Investigator Mr. Thomas A. Swann, Business Official DOE Grant No. DE-FG03-97ER82448 Amount: $74,777 Energy intensive metal forming operations are among the most common steps in manufacturing ...
SBIR Phase I 1997 Department of Energy -
A Micro-Pulse Electron Injector
SBC: Fm Technologies Inc Topic: N/AN/A
SBIR Phase I 1996 Department of Energy -
A MULTIMEDIA-AUGMENTED SOFTWARE TUTORIAL FOR THE HIGH ACCEPTANCE RECOIL POLARIMETER DEVICE
SBC: PLANNING SYSTEMS, INC. Topic: N/ATHIS PROJECT WILL ASSESS THE FEASIBILITY OF USING MULTIMEDIA-AUGMENTED SOFWEARE TUTORIALS TO SUPPORT TEACHING THE PRINCIPLES OF EXPERIMENTAL NUCLEAR PHYSICS. THE DETECTOR SYSTEM FOR THE PHOTON TAGGING FACILITY AT THE CONTINUOUS ELECTRON BEAM ACCELERATOR FACILITY (CEBAF) IN NEWPORT NEWS, VIRGINIA IS NOW UNDER CONSTRUCTION AT THE NUCLEAR DETECTOR LABORATORY OF THE CENTER FOR NUCLEAR STUDIES OF THE ...
SBIR Phase I 1994 Department of Energy -
A MULTIMEDIA SOFTWARE TUTORIAL ON SUPER-CONDUCTING ACCELERATOR MAGNETS
SBC: Mjb Consulting Topic: N/AN/A
SBIR Phase I 1994 Department of Energy -
A MULTIMEDIA TUTORIAL FOR CHARGED-PARTICLE BEAM DYNAMICS
SBC: Whistlesoft Inc. Topic: N/AN/A
SBIR Phase I 1994 Department of Energy