You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
SYSTEM FOR ECONOMICALLY PRODUCING MARGINAL DEEPWATER GAS DISCOVERIES
SBC: Atlantia Energy Corp. Topic: N/AN/A
SBIR Phase I 1990 Department of Energy -
SURVEY OF TRANSIT-TIME AMPLIFIERS FOR APPLICATIONS TO HIGH ENERGY PHYSICS ACCELERATORS
SBC: MISSION RESEARCH CORP. Topic: N/AHIGH POWER TRANSIT-TIME AMPLIFIERS ARE A NEW CLASS OF RF SOURCE THAT CONVERTS THE KINETIC ENERGY OF AN ELECTRON BEAM INTO RF RADIATION IN A VERY EFFICIENT WAY. WHEN THE BEAM CROSSES THE CAVITY OF PROPER DIMENSIONS, IT WILL INTERACT WITH A SINGLE CAVITY MODE THEREBY RADIATING COHERENTLY AT THE MODE'S FREQUENCY. MODE GROWTH CONTINUES UNABATED UNTIL THE RF FIELDS ARE LARGE ENOUGH TO MODIFY THE BEAM O ...
SBIR Phase I 1990 Department of Energy -
SPECIAL MONITOR DETECTOR DEVELOPMENT FOR RESPIRATOR CONTAMINATION
SBC: Shonka Research Associates Topic: N/AN/A
SBIR Phase I 1993 Nuclear Regulatory Commission -
SEPARATION OF URANIUM-IRON ALLOY FROM THE ATOMIC VAPOR LASER ISOTOPE SEPARATION PROCESS INO URANIUM HEXAFLUORIDE AND IRON
SBC: Santa Fe Alloys Topic: N/AA MOLTEN SALT PROCESS IS DESCRIBED FOR SEPARATING THE COMPONENTS OF THE ALLOY OF ENRICHED URANIUM AND IRON WHICH IS THE PRODUCT OF THE ATOMIC VAPOR LASER ISOTOPE SEPARATION (AVLIS) PROCESS TO ENRICH THE (235)U CONTENT OF THE PRENT METAL. A SIMPLE SEPARATION WOULD DISSOLVE THE ENRICHED URANIUM HEXAFLUORIDE WHICH WOULD BE RECOVERED AND PURIFIED BY VAPORIZATION FROM THE MOLTEN SALT. VAPORIZED AND CON ...
SBIR Phase I 1993 Department of Energy -
Semiconductor Strain Gauge Based Pressure Transducer for Use in Borehole Seismics
SBC: Tomoseis, Inc. Topic: N/A40837 November 13, 1996 TomoSeis, Inc. Crosswell Seismic Imaging holds great promise for imaging the region between existing oil wells to incrementally increase the recovery of the 368 billion barrels of oil still in the ground (of the 500 billion barrels of original oil in place in the U.S.). To make crosswell data acquisition cost effective, surveys mu ...
SBIR Phase I 1996 Department of Energy -
SAPPHIRE-METAL JOINING FOR LOW-LOSS GYROTRON WINDOWS
SBC: Fm Technologies Inc Topic: N/AA NEW TECHNIQUE, PULSED ELECTRON BEAM (PEB) JOINING, WILL BE APPLIED TO THE PROBLEM OF JOINING, LOW-LOSS CERAMIC MATERIALS USED FOR WINDOWS IN HIGH FREQUENCY MICROWAVE DEVICES TO THE METAL VACUUM ENVELOPE OF THE MICROWAVE DEVICE. THE PEB TECHNIQUE ALLOWS SELECTIVE HEATING OF THE SPECIMEN TO BE JOINED THROUGH PREFERENTIAL ENERGY DEPOSITION THAT IS CONTROLLED BY A COMBINATION OF THE ELECTRON BEAM P ...
SBIR Phase I 1994 Department of Energy -
ROBOTIC WALL SCRUBBER FOR NUCLEAR REACTOR WELLS AND FUEL STORAGE POOLS
SBC: KARTA TECHNOLOGIES Topic: N/ADURING THE REFUELING OPERATIONS AT A NUCLEAR POWER PLANT, IT IS NECESSARY TO FLOOD LARGE CAVITIES ABOVE THE REACTOR PRESSURE VESSEL WITH WATER TO PROVIDE RADIATION SHIELDING. THE SPENT FUEL IS TRANSPORTED THROUGH THESE CAVITIES TO A TEMPORARY STORAGE POOL LOCATED NEAR THE REACTOR. OTHER CONTAMINATED INTERNAL REACTOR COMPONENTS ARE ALSO STORED WITHIN THESE CAVITIES DURING REFUELING. ONCE THE REFUEL ...
SBIR Phase I 1990 Department of Energy -
RELIABLE INTRUSION DETECTION
SBC: ENSCO Inc Topic: N/ARELIABLE INTRUSION DETECTION MAY BE ACHIEVED BY COMBINING GENERALIZED POTENTIAL FUNCTION (GPF) NEURAL NET CONSTRUCTION AND MULTIPLE SENSOR DATA FUSION. TRADITIONALLY, RELIABLE INTRUSION DETECTION CAN BE DIFFICULT BECAUSE NOISE LEVELS CHANGE WITH TIME AND LOCATION, AND AN INTRUSION MAY PRODUCE A WIDE RANGE OF SIGNALS OR VARIATIONS OVER THE DIFFERENT TYPES OF SENSORS. ACCOMMODATING THESE VARIATION ...
SBIR Phase I 1994 Department of Energy -
REDUCING UTILITY DEMAND LEVELS BY AUTOMATIC DEMAND PEAK SHAVING WITH USER STANDBY GENERATORS.
SBC: Hallmark Energy Economics Inc. Topic: N/AN/A
SBIR Phase I 1990 Department of Energy -
REDESIGN OF AMMONIA ABSORPTION REFRIGERATION UNITS FOR LOW TEMPERATURE APPLICATIONS IN NATURAL GAS PROCESSING
SBC: Process Technology Inc. Topic: N/AGAS TRANSMISSION PIPELINES REQUIRE NATURAL GAS DELIVERED TO THEM TO MEET A HYDROCARBON (HC) DEWPOINT SPECIFICATION IN ORDER THAT THE HC LIQUIDS ARE NOT DROPPED OUT IN THE LINE DURING TRANSMISSION. SIMILAR SPECIFICATIONS ARE IMPOSED BY PLANT OPERATORS ON THE FUEL GAS THAT IS CONSUMED BY THEIR MACHINERY. A MARKET EXISTS FOR AN ECONOMICAL AMMONIA (NH3) ABSORPTION UNIT TO REPLACE COMPRESSION UNITS U ...
SBIR Phase I 1994 Department of Energy