You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY20 is not expected to be complete until September, 2021.

  1. Power Electronics and Conditioning for Electric Actuation

    SBC: TECHNOLOGY SERVICE CORPORATION            Topic: N/A

    Clusters of cooperating small satellites with synchronized RF payloads are under investigation by AFRL/VS to construct a robust distributed/sparse aperture system with additional degrees of freedom for improved C4ISR mission performance. Linear toelliptical cluster formations, relative microsatellite spacing, transmit waveform diversity, and multi-channel STAP approaches are major elements that m ...

    SBIR Phase II 2001 Department of DefenseAir Force
  2. Automatic Generation of Obstruction Databases from IFSAR Data

    SBC: TECHNOLOGY SERVICE CORPORATION            Topic: N/A

    The Air Force needs the ability to land aircraft in all weather conditions, at any given point on the globe, within 24 hours notice. This implies the need for a rapid instrument approach procedure (IAP) development capability, which will depend ondetailed knowledge of terrain and vertical obstructions, such as towers and buildings, near the landing area.This Phase II SBIR effort will produce prot ...

    SBIR Phase II 2001 Department of DefenseAir Force
  3. Advancing the Frontiers of Broad Band CEM for Target Modeling Applications

    SBC: Hypercomp, Inc.            Topic: N/A

    HyPerComp, a premiere developer of innovative and highly scalable computational environments for time-domain electromagnetics, proposes to develop, demonstrate and deliver the next generation TEMPUS (Time-Domain EM Parallel Unstructured Simulator)environment to perform cost-effective and routine X-band to 20 GHz computations for full-scale targets with general materials to provide highly accurate ...

    SBIR Phase II 2001 Department of DefenseAir Force
  4. MEMS Sensors For In-situ Monitoring of Adhesive Bonded Composite Structures

    SBC: Analatom Inc            Topic: N/A

    The problem addressed is through-life non-destructive monitoring of adhesivelybonded structures. The concept presented is to produce a

    SBIR Phase II 2001 Department of DefenseAir Force
  5. Real Time, Low Bandwidth, Detachable Damage Assessment Eye

    SBC: Physical Optics Corporation            Topic: N/A

    Physical Optics Corporation (POC) proposes to develop a Smart Munition Smart Sensor (SMSS) system bringing together video processing, compression, and transmission technology, with the capability to communicate at beyond-line-of-sight ranges out to a fewhundred kilometers. SMSS will send sensor data to a ground or air station, fully compressed at ratios of 1000:1 and more while preserving high si ...

    SBIR Phase II 2001 Department of DefenseAir Force
  6. Autonomous Control and Coordination of Formation-Flying Satellite Clusters.

    SBC: STOTTLER HENKE ASSOCIATES INC            Topic: N/A

    SHAI, in cooperation with our subcontractor, Interface and Control Systems Inc., will develop an operational Mission Planner for Formation-Flying Clusters and demonstrate its potential for use on the TechSat 21 flight experiment. This system will enablepayload scheduling based on detailed orbital and resource constraints for the entire mission. It will maximize the number and quality of observatio ...

    SBIR Phase II 2001 Department of DefenseAir Force
US Flag An Official Website of the United States Government