You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. COMPACT LIGHTWEIGHT CO2 LASERS FOR STRATEGIC DEFENSE APPLICATIONS

    SBC: Science Research Laboratory, Inc            Topic: N/A

    N/A

    SBIR Phase I 1988 Department of DefenseMissile Defense Agency
  2. Compact 3-D Intercept LADAR

    SBC: VISIDYNE, INC.            Topic: N/A

    Visidyne proposes to demonstrate that through an innovative mix of electro-optical and photonic technologies, an imaging, scannerless LADAR (or 3-D imager) can be designed and built that is a viable sensor for the terminal phase of guided kinetic energyweapons. Key elements in the mix are; a small, high power laser source, time coded for range, a unique focal plane array (FPA) that decodes the la ...

    SBIR Phase I 2002 Department of DefenseMissile Defense Agency
  3. Co-Located Dual Band (VLWIR1/VLWIR2) Focal Plane Arrays for Space Applications

    SBC: ADVANCED DEVICE TECHNOLOGY, INC.            Topic: N/A

    "We propose to develop Co-Located Dual Band (VLWIR1/VLWIR2) Focal Plane Arrays on Strained Layer Superlattices (SLS) Material. We propose innovative Al(x)Ga(1-x)As/InAs SLS layers to produce detectors for very long wavelength (22 um). The key features are:1) SLS Material Growth by Migration Enhanced Epitaxy (MEE) Technique. Type II SLS layers are grown with Migration Enhanced Epitaxy Technique by ...

    SBIR Phase I 2002 Department of DefenseMissile Defense Agency
  4. BMDO 014A- Novel System for Bulk Growth of Semi-Insulating SiC

    SBC: CAPESYM INC            Topic: N/A

    "It is proposed to develop a novel growth system capable of producing large diameter and long Semi-Insulating SiC crystals. The proposed system aims to achieve semi-insulating properties in the crystal by reducing the impurity levels in the reactorassociated with the graphite containment elements. The proposed growth system is based on using gas precursors instead of SiC powder, and uses a nove ...

    SBIR Phase I 2002 Department of DefenseMissile Defense Agency
  5. Auction Based Approaches to Distributed Sensor Management

    SBC: ALPHATECH, INC.            Topic: N/A

    "In the proposal, we will extend ALPHATECH's dynamic programming based approach to sensor resource management so that it can control a network of heterogeneous sensors. To reduce the complexity of the problem to a manageable level, the system will employ ahierarchical approach and will assume that processing occurs in a single centralized node. The algorithm proposed will decompose the problem int ...

    SBIR Phase I 2002 Department of DefenseMissile Defense Agency
  6. All-optical Switch Actuated by Optical Data

    SBC: Cape Cod Research            Topic: N/A

    "All-optical switches capable of rapidly switching light with light are needed for missile defense in the Airborne-Laser, Space-Based Laser and Space-Based Infrared System as well as in Big Safari special mission aircraft. While the commercial and militaryusefulness of optical-electrical-optical switches for security, recognition and switching applications is well established, these devices are s ...

    SBIR Phase II 2002 Department of DefenseMissile Defense Agency
  7. A Heterointegrated InGaAs 40Gb Optoelectronic Cross Bar Receiver E- IR (> 0.9 microns)

    SBC: SOLID STATE SCIENTIFIC CORPORATION            Topic: N/A

    "Advances in EO sensors and fiber optic information distribution systems havesimplified the distribution of targeting information among the varioussystems. The requirements for higher levels of functionality and performanceare pushing the levels of integration to a point that can no longer besatisfied by the industry mainstay approach of hybrid assembly. Significantimprovements in fiber-optic syst ...

    SBIR Phase I 2002 Department of DefenseMissile Defense Agency
  8. Agile Engagement Planning: Integrating Decision Graphs with Stochastic Dynamic Programming Solvers

    SBC: ALPHATECH, INC.            Topic: N/A

    "Missile Defense Engagement Planning systems are highly automated. It is the system developers, not the commanders of those systems, who are formulating the engagement planning problem and thereby deciding how engagements will be planned and executed. Inthe history of warfare system developers have never trumped commanders in deciding how a system will carry out orders, and this reversal of affair ...

    SBIR Phase I 2002 Department of DefenseMissile Defense Agency
  9. Affordable Composites for Corrosion Protection of High-Value Test and Evaluation Assets

    SBC: TRITON SYSTEMS, INC.            Topic: N/A

    "Triton Systems, Inc. (TSI) proposes to develop affordable, corrosion resistant (CR), composite structural materials to protect high-value assets at remote test facilities. The use of virtually corrosion-free polymer matrix composites to cost-effectivelyproduce structures and structural components, shelters, radomes, and antenna support structures will greatly reduce life cycle maintenance costs ...

    SBIR Phase I 2002 Department of DefenseMissile Defense Agency
  10. Advanced Tracking through Remote Supervision

    SBC: Energid Technologies Corporation            Topic: N/A

    "Target recognition and tracking requires the solution of several hard problems. A target signature must be identified in sensor data, this data must be associated with prior information on the target, and the association must be used to gain understandingof the target. In the presence of countermeasures and clutter, each of these components is computationally onerous even when using suboptimal ...

    SBIR Phase I 2002 Department of DefenseMissile Defense Agency
US Flag An Official Website of the United States Government