You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

Displaying 101 - 110 of 207712 results
  1. SKIN VIBRATORS FOR USE WITH AIDS FOR THE DEAF

    SBC: AUDIOLOGICAL ENGINEERING CORPORATION            Topic: N/A

    N/A

    SBIR Phase I 1983 Department of Health and Human Services
  2. LARGE NUMBERS OF INDUSTRIAL RADIOGRAPHS ARE GENERATED TO INSPECT HIGH RELIABILITY ITEMS SUCH AS PIPE WELDS, BOILER SEAMS AND CASTINGS.

    SBC: Automatix, Inc.            Topic: N/A

    LARGE NUMBERS OF INDUSTRIAL RADIOGRAPHS ARE GENERATED TO INSPECT HIGH RELIABILITY ITEMS SUCH AS PIPE WELDS, BOILER SEAMS AND CASTINGS. THE INTERPRETATION OF THESE RADIOGRAPHSCAN BE DIFFICULT AND TIME-CONSUMING BECAUSE OF LOW IMAGE CONTRAST, NOISE, EXPOSURE VARIABILITY, EXPOSURE NON-UNIFORMITY AND OTHER EXPERIMENTAL FACTORS. IT IS THE PURPOSE OF THE PROPOSED RESEARCH TO DEMONSTRATE THE FEASIBILITY ...

    SBIR Phase I 1983 National Science Foundation
  3. VOICE RECOGNITION AND VOICE SYNTHESIS WORK WELL BUT NOT WELLENOUGH VOICE SYNTHESIS IS TOO ARTIFICIAL SOUNDING AND VOICE RECOGNITION ONLY WORKS IN IDEAL CONDITIONS.

    SBC: Axxon Voice Products            Topic: N/A

    VOICE RECOGNITION AND VOICE SYNTHESIS WORK WELL BUT NOT WELLENOUGH VOICE SYNTHESIS IS TOO ARTIFICIAL SOUNDING AND VOICE RECOGNITION ONLY WORKS IN IDEAL CONDITIONS. THE ERRORS THAT OCCUR IN A NORMAL ENVIRONMENT INDICATE TO THE USER THAT VOICE TECHNOLOGY IS NOT READY, WHEN IN FACT IT IS SIMPLY LACKS ADEQUATE SOFTWARE INTELLIGENCE TO PREVENT MISTAKES. THE PURPOSE OF THIS RESEARCH IS TO ENHANCE WITH A ...

    SBIR Phase I 1983 Department of DefenseArmy
  4. RESEARCH ON AN AUDITORY "MOBILE" FOR INFANT

    SBC: Babeco            Topic: N/A

    N/A

    SBIR Phase I 1983 Department of Health and Human Services
  5. EXTREME SEAWAY LOADS CHARACTERIZATION FOR SHIP STRUCTURE

    SBC: BAND, LAVIS & ASSOC., INC.            Topic: N/A

    N/A

    SBIR Phase I 1983 Department of DefenseNavy
  6. DESIGN AND REMOVAL OF ARCHITECTURAL BARRIERS

    SBC: Barrier Free Environments Inc            Topic: N/A

    THIS PROPOSAL ADDRESSES THE DEVELOPMENT OF A MODEL PLAN FOR ANALYZING ARCHITECTURAL BARRIERS AS WELL AS RECOMMENDING GENERALIZED METHODS FOR OVERCOMING SUCH BARRIERS IN PUBLIC AND PRIVATE BUILDINGS. IT INCLUDES THE RESEARCH AND DEVELOPMENT OF A COMPUTER DATA SOFTWARE SYSTEM WHICH WILL ORGANIZE AND STORE THE LARGE AMOUNT OF INFORMATION NEEDED INTO A MANAGEABLE RETRIEVAL SYSTEM THAT WILL GUIDE THE U ...

    SBIR Phase I 1983 Department of Education
  7. SAFETY IMPROVEMENTS TO LITHIUM RESERVE BATTERIES

    SBC: Battery Engineering Inc            Topic: N/A

    N/A

    SBIR Phase I 1983 Department of DefenseNavy
  8. ENGINE-POWERED HIGH TEMPERATURE HEAR PUMP GRAIN DRYER.

    SBC: Beard Industries, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1983 Department of Agriculture
  9. THE SOLID FUEL RAMJET (SFRJ) IS CURRENTLY BEING CONSIDERED AS A PROPULSION DEVICE FOR A NUMBER OF AIR FORCE TACTICAL APPLICATIONS.

    SBC: BELTRAN, INC.            Topic: N/A

    THE SOLID FUEL RAMJET (SFRJ) IS CURRENTLY BEING CONSIDERED AS A PROPULSION DEVICE FOR A NUMBER OF AIR FORCE TACTICAL APPLICATIONS. THE PROPOSED PHASE I WORK WILL BE AN EXPLORATORY DEVELOPMENT EFFORT IN THE FOLLOWING AREA TO EVALUATE WHICH OF THE CONCEPTS ARE WORTHY OF FURTHER DEVELOPMENT UNDER PHASE II, CONSIDERING THE REQUIREMENTS OF THE AIR FORCE MISSION FOR THE SOLID FUEL RAMJET. (A) ALTERNATE ...

    SBIR Phase I 1983 Department of DefenseAir Force
  10. SINCE AIR-BREATHING GAS TURBINE ENGINES HAVE BEEN USED FOR A CONSIDERABLE PERIOD OF TIME, THE TECHNOLOGY HAS REACHED THE STAGE WHERE MAJOR IMPROVEMENTS IN EITHER OVERALL PROPULSIVE CYCLE EFFICIENCY, OR THRUST TO WEIGHT REQUIRES NOVEL SYSTEM CONCEPTS.

    SBC: BELTRAN, INC.            Topic: N/A

    SINCE AIR-BREATHING GAS TURBINE ENGINES HAVE BEEN USED FOR A CONSIDERABLE PERIOD OF TIME, THE TECHNOLOGY HAS REACHED THE STAGE WHERE MAJOR IMPROVEMENTS IN EITHER OVERALL PROPULSIVE CYCLE EFFICIENCY, OR THRUST TO WEIGHT REQUIRES NOVEL SYSTEM CONCEPTS. AFTER A CAREFUL REVIEW OF THE STATE- OF-THE-ART, IT APPEARS THAT SEVERAL CONCEPTS UTILIZING HEAT PIPE TECHNOLOGY ARE ATTRACTIVE FOR THIS PURPOSE. THE ...

    SBIR Phase I 1983 National Aeronautics and Space Administration
US Flag An Official Website of the United States Government