You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
A SIMPLE METHOD FOR SOLUBILITY TESTING OF RADIONUCLIDES ON AIR FILTER
SBC: Radiation Safety Engineering, Inc. Topic: N/AN/A
SBIR Phase I 1993 Nuclear Regulatory Commission -
SEPARATION OF URANIUM-IRON ALLOY FROM THE ATOMIC VAPOR LASER ISOTOPE SEPARATION PROCESS INO URANIUM HEXAFLUORIDE AND IRON
SBC: Santa Fe Alloys Topic: N/AA MOLTEN SALT PROCESS IS DESCRIBED FOR SEPARATING THE COMPONENTS OF THE ALLOY OF ENRICHED URANIUM AND IRON WHICH IS THE PRODUCT OF THE ATOMIC VAPOR LASER ISOTOPE SEPARATION (AVLIS) PROCESS TO ENRICH THE (235)U CONTENT OF THE PRENT METAL. A SIMPLE SEPARATION WOULD DISSOLVE THE ENRICHED URANIUM HEXAFLUORIDE WHICH WOULD BE RECOVERED AND PURIFIED BY VAPORIZATION FROM THE MOLTEN SALT. VAPORIZED AND CON ...
SBIR Phase I 1993 Department of Energy -
A METALLIZED PULSE CAPACITOR FOR THE COPPER LASER INVERTER
SBC: SIGMA TECHNOLOGIES INTERNATIONAL GROUP, INC. Topic: N/AADDRESSING THE NEED FOR HIGHER RELIABILITY PULSE CAPACITORS TO SERVE DEMANDING APPLICATONS SUCHAS THE COPPER LASER INVERTER, A METALLIZED CAPACITOR IS PLANNED WITH A RATING OF 1-2 MICROFARADS (UF)/2000V, THAT HAS SUPERIOR DV-DT AND HIGH FREQUENCY CURRENT CARRYING CHARACTERISTICS, AND PROLONGED LIFE AT HIGH VOLTAGES AND HIGH LEVELS OF CORONA DISCHARGE. SEVERAL INNOVATIVE IMPROVEMENTS HAVE BEEN INCO ...
SBIR Phase I 1993 Department of Energy -
CATALYTIC PRODUCTION OF ELEMENTAL SULFUR FROM SULFUR DIOXIDE-CONTAINING GAS STREAMS
SBC: Sorbent Technologies Corp Topic: N/AN/A
SBIR Phase I 1993 Department of Energy -
A DIODE LASER FREQUENCY STANDARD USING VELOCITY MODULATION
SBC: SOUTHWEST SCIENCES INC Topic: N/ATHIS PROJECT WILL DEVELOP A FREQUENCY STANDARD FOR THE URANIUM-STOMIC VAPOR LASER ISOTOPE SEPARATION (U-AVLIS) PROCESS USING A VISIBLE DIODE LASER LOCKED TO AN ATOMIC RESONANCE. A KEY FEATURE IS THE USE OF THE VELOCITY MODULATION METHOD TO PROVIDE A HIGH SIGNAL/NOISE LOCKING DISCRIMINANT WITHOUT THE NEED TO MODULATE THE LASER, AND WITH THE HIGH POWERS FOR SUB-DOPPLER EFFECTS. PHASE I WILL PRODUCE ...
SBIR Phase I 1993 Department of Energy -
WORK UNDERLOAD IN MODERN NPP CIBTRIK ROOMS
SBC: UES INC Topic: N/AN/A
SBIR Phase I 1993 Nuclear Regulatory Commission