You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. A FEASIBILITY STUDY FOR A SEISMIC EARLY WARNING SYSTEM FOR NUCLEAR POWER PLANT SHUTDOWN

    SBC: ENSCO Inc            Topic: N/A

    A FEASIBILITY STUDY WILL BE CONDUCTED OF A SEISMIC SCRAM-PROCESSING SYSTEM IN WHICH P WAVES FROM LARGE EARTHQUAKES ARE DETECTED AND ANALYZED IN TIME TO INITIATE A NUCLEAR POWER PLANT CORE SHUTDOWN BEFORE THE ARRIVAL OF LARGE, DAMAGING SHEAR WAVE PHASES. A PROTOTYPE SEISMIC SCRAM-MONITORING SYSTEM WILL BE DESIGNED AND IMPLEMENTED ON A SUN 3/160 ENGINEERING WORKSTATION. IN THE PROPOSED SYSTEM, SEISM ...

    SBIR Phase I 1987 Department of Energy
  2. IMPROVED ENHANCED OIL RECOVERY PROCESSES USING NEW AND NOVEL SYNTHETIC COPOLYMERS CONTAINING LARGE AMOUNTS OF ACRYLAMIDE

    SBC: R. L. Clampitt And            Topic: N/A

    INDEPENDENTS IN THE MID-CONTINENT AREA INCLUDING OKLAHOMA AND KANSAS, NEED A NEW AND NOVEL WATER SOLUBLE POLYMER FOR INDEPTH MOBILITY CONTROL IN ENHANCED OIL RECOVERY (EOR) PROCESSES AT INTERMEDIATE TEMPERATURES OF 165 TO 200 FAHRENHEIT. PARTIALLY HYDROLYZED POLYACRYLAMIDES AND NATURAL POLYMERS HAVE HISTORICALLY BEEN THE PRODUCTS USED IN THIS REGION. AND IN ESSENTIALLY ALL OF THE EARLIER EOR PROJE ...

    SBIR Phase I 1990 Department of Energy
  3. A FUZZY SET APPROACH FOR SEISMIC SAFETY MARGINS ASSESSMENT.

    SBC: Eda Consultants            Topic: N/A

    THE CONTRACTOR SHALL DEVELOP A FUZZY SET METHODOLOGY FOR UNCERTAINTY ANALYSIS IN PROBABILISTIC SEISMIC SAFETY ASSESSMENT OF NUCLEAR POWER PLANTS. FUZZY SET LOGIC WILL BEUSED FOR COLLECTING, QUANTIFYING AND PROPAGATING SUBJECTIVE,ENGINEERING JUDGEMENT USED IN THE UNCERTAINTY ANALYSIS. IN PHASE I, FEASIBILITY OF THE PROPOSED APPROACH WILL BE DEMONSTRATED BY APPLYING IT TO SELECTED PARTS OF A PROBABI ...

    SBIR Phase I 1987 Nuclear Regulatory Commission
  4. FIBER OPTIC LONG COUNTER

    SBC: FIBERTEK, INC.            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of Energy
  5. SURVEY OF TRANSIT-TIME AMPLIFIERS FOR APPLICATIONS TO HIGH ENERGY PHYSICS ACCELERATORS

    SBC: MISSION RESEARCH CORP.            Topic: N/A

    HIGH POWER TRANSIT-TIME AMPLIFIERS ARE A NEW CLASS OF RF SOURCE THAT CONVERTS THE KINETIC ENERGY OF AN ELECTRON BEAM INTO RF RADIATION IN A VERY EFFICIENT WAY. WHEN THE BEAM CROSSES THE CAVITY OF PROPER DIMENSIONS, IT WILL INTERACT WITH A SINGLE CAVITY MODE THEREBY RADIATING COHERENTLY AT THE MODE'S FREQUENCY. MODE GROWTH CONTINUES UNABATED UNTIL THE RF FIELDS ARE LARGE ENOUGH TO MODIFY THE BEAM O ...

    SBIR Phase I 1990 Department of Energy
US Flag An Official Website of the United States Government