You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. IMPROVEMENTS IN MOTOR OPERATED GATE VALVE DESIGN AND PREDICTIVE MODELS FOR RELIABILITY IMPROVEMENTS IN NUCLEAR POWER PLANT SAFETY SYSTEMS

    SBC: KALSI ENGINEERING, INC            Topic: N/A

    MOTOR OPERATED GATE VALVE OPERABILITY PROBLEMS AND FAILURES AT NUCLEAR POWER PLANTS ARE A MAJOR SAFETY CONCERN AS STATEDIN NRC IE BULLETIN 85-03 AND GENERIC LETTER 89-10. THIS PROPOSAL IS AIMED AT IMPROVING GATE VALVE PERFORMANCE BY (1) DEVELOPING COMPREHENSIVE PERFORMANCE PREDICTION MODELS FOR USE OVER A RANGE OF OPERATING CONDITIONS, (2) DEFINING LIMITS, BASED ON SPECIFIC DESIGNS, BEYOND WHICH E ...

    SBIR Phase I 1990 Nuclear Regulatory Commission
  2. DEVELOPMENT OF A HIGHER PRESSURE ROTARY BLOWOUT PREVENTER FOR SAFE DIRECTIONAL DRILLING IN UNDERBALANCED APPLICATIONS

    SBC: KALSI ENGINEERING, INC            Topic: N/A

    THIS PROJECT IS AIMED AT THE DEVELOPMENT OF A NEW GENERATION OF ROTARY BLOWOUT PREVENTERS CAPABLE OF SAFE, RELIABLE, AND COST EFFECTIVE HANDLING OF THE HIGH PRESSURES EXPECTED IN UNDERBALANCED HORIZONTAL AND DIRECTIONAL DRILLING APPLICATIONS. PRESSURES OF UP TO 5,000 PSI (OR EVEN HIGHER) CAN BE EXPECTED WHEN DRILLING WITH AIR, FOAM, OR NITRIFIED MUD IN THE LOW PERMEABILITY FORMATIONS IN THE U.S. ...

    SBIR Phase I 1994 Department of Energy
  3. PREDICTION OF CHECK VALVE PERFORMANCE & DEGRADATION IN NUCLEAR POWER PLANT SYSTEMS

    SBC: KALSI ENGINEERING, INC            Topic: N/A

    N/A

    SBIR Phase I 1987 Nuclear Regulatory Commission
  4. High Speed Bearing for Roller Cone Drill Bits Used in Hard Rock Drilling

    SBC: KALSI ENGINEERING, INC            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of Energy
  5. DEVELOPMENT OF A NOVEL SEALED BEARING ASSEMBLY FOR IMPROVINGDOWNHOLE MOTOR PERFORMANCE IN DRILLING HORIZONTAL WELLS

    SBC: KALSI ENGINEERING, INC            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of Energy
US Flag An Official Website of the United States Government