You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
A NOVEL MASS SPECTROMETER FOR COMBUSTION STUDIES
SBC: SOUTHWEST SCIENCES INC Topic: N/AN/A
SBIR Phase I 1990 Department of Energy -
AN INFRARED DIODE LASER SPECTROMETER WITH ENHANCED SENSITIVITY FOR COMBUSTION RESEARCH
SBC: SOUTHWEST SCIENCES INC Topic: N/AN/A
SBIR Phase I 1987 Department of Energy -
Development of Scintillators and Waveshifters for Detection of Ionizing Radiation
SBC: LUDLUM MEASUREMENTS INC Topic: N/A182 Development of Scintillators and Waveshifters for Detection of Ionizing Radiation--Ludlum Measurements, Inc., PO Box 810, Sweetwater, TX 79556-0810; (915) 235-5494 Mr. Charles R. Hurlbut, Principal Investigator Mr. Donald G. Ludlum, Business Official DOE Grant No. DE-FG03-97ER82419 Amount: $75,000 High-energy particle accelerators at Fermi National Accelerator Laboratory and Brookhaven N ...
SBIR Phase I 1997 Department of Energy -
FIBER OPTIC LONG COUNTER
SBC: FIBERTEK, INC. Topic: N/AN/A
SBIR Phase I 1990 Department of Energy -
A TECHNIQUE FOR MEASURING DIFFUSION OF HYDROGEN ISOTOPES IN OXIDES
SBC: IONWERKS INC Topic: N/ASURFACE METAL OXIDE AND OXYHYDROXIDE LAYERS HAVE BEEN IMPLICATED AS TRITIUM TRAPS IN STAINLESS STEELS. A NEW TECHNIQUE IS BEING DEVELOPED FOR MEASURING HYDROGEN ISOTOPE DIFFUSION WITHIN THIS LAYER AND WITHIN PERMEATION BARRIERS MEANT TO LIMIT TRITIUM INVENTORY IN THESE MATERIALS.
SBIR Phase I 1990 Department of Energy