You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. N/A

    SBC: Quantum Magnetics, Inc.            Topic: N/A

    N/A

    SBIR Phase I 2000 Department of DefenseOffice for Chemical and Biological Defense
  2. Velocity Sensing Sonar for Naval Special Warfare Undersea Vehicles

    SBC: RD INSTRUMENTS            Topic: SOCOM05003

    This Phase I proposal is to establish the feasibility of developing a velocity log suited to navigation of small underwater vehicles that are required to transit to the littoral zone from deeper open ocean waters during clandestine operations. The instrument will measure three components of bottom- and water-relative velocity over a wide altitude range of less than 1 to greater than 1000 m. It w ...

    SBIR Phase I 2005 Department of DefenseSpecial Operations Command
  3. Frequency Hopper/DSSS Detection

    SBC: RADIX TECHNOLOGIES, INC.            Topic: N/A

    "Advances in spread spectrum communications systems have provided military and other users with readily available low-probability-of-intercept transceivers for secure, clandestine communications. The use of these systems may constitute a threat to SpecialOperations Forces. These forces need a system to detect, identify, locate, and copy modern LPI communication emitters to counter this threat. T ...

    SBIR Phase I 2002 Department of DefenseSpecial Operations Command
  4. Radar Technologies for SOF

    SBC: RDAS, INC.            Topic: N/A

    The proposed effort addresses the threat warning receiver for the SOF through prototype design, development, fabrication, and experimental testing of a miniaturized receiver that: (1) has negligible emissions over a bandwidth of 3 to 40 GHz to precludedetection by an enemy receiver, (2) requires extremely low power to operate, (3) can be easily carried or worn and used by SOF, and (4) lends itself ...

    SBIR Phase I 2003 Department of DefenseSpecial Operations Command
  5. Automated Vehicle Identification at a Distance

    SBC: REAL-TIME INNOVATIONS, INC.            Topic: SOCOM07003

    Vehicle identification can be effected by acquiring multi-spectral signatures (i.e., acoustic and electromagnetic emissions) in an analogous fashion to the conventional biometric triad of fingerprints, facial recognition, and speech analysis used for identification of people. The acoustic metrics would include emissions unique to the engine and exhaust system for a particular vehicle, while the e ...

    SBIR Phase I 2007 Department of DefenseSpecial Operations Command
  6. Advanced Geospatial Computing

    SBC: REPLICUS SOFTWARE CORP.            Topic: NGA05001

    Our primary concept is a distributed storage system capable of supporting organizations which scale from the small to the very largest. The goal is to build a distributed self-configuring; self-managing and self-healing file storage system which exhibits modular upgradeability and dynamic adaptation to an organization's evolving needs. Our strategy to do this is to exploit a unique scientifically ...

    SBIR Phase I 2005 Department of DefenseNational Geospatial-Intelligence Agency
  7. Safe and Arm Chemical Delay for High Shock Environments Without the Use of Primary Explosive

    SBC: REYNOLDS SYSTEMS, INC.            Topic: N/A

    A fuze delay function can be achieved in two ways, either electrically or chemically. An electrical fuze delay function uses an in-line electronic S & A, while a chemical delay employs an out-line system. Primary explosives with out-line fuze electronic delay present a safety hazard. Conversely an in-line electronic delay, thus safer, makes use of secondary explosives, which are susceptible to s ...

    SBIR Phase I 1998 Department of DefenseSpecial Operations Command
  8. Modular Tactical Packaging

    SBC: SA PHOTONICS, LLC            Topic: SOCOM06016

    The goal of this project is to eliminate the current base modules and replace them with a distributed modular tactical packaging system. This system will allow for greater flexibility, reduced encumbrance and an easier to use electronics package which will allow both man-mounted and hand-held operation. By designing a wearable unit that is easily reconfigurable, soldiers will have “plug and p ...

    SBIR Phase I 2006 Department of DefenseSpecial Operations Command
  9. Bioweapon Identification and Triggering by Ionization Signatures

    SBC: SCIENTIFIC APPLICATIONS & RESEARCH ASSOCIATES, INC.            Topic: CBD09109

    Modern bioweapon detection systems are highly accurate, but require expensive reagents to operate. To reduce costs, a less discriminate trigger system is used to signal the primary detector when a suspicious aerosol is present. Currently deployed UV fluorescence based trigger systems operate successfully, but only work with fluorescent bioweapons. An advanced technology is urgently needed to ad ...

    SBIR Phase I 2009 Department of DefenseOffice for Chemical and Biological Defense
  10. Speciation, Identification and Quantification of Atmospheric Gases

    SBC: SEACOAST SCIENCE, INC.            Topic: SOCOM08005

    Accurate speciation and measurement of the composition of air environments in Navy submersibles is vital to crew safety and health. This proposal focuses on the development of a detection system specifically for collection, speciation, identification and quantification of gas phase chemicals found aboard submersibles. The proposed hybrid sensor system will be approximately 1/10 the size and cost ...

    SBIR Phase I 2008 Department of DefenseSpecial Operations Command
US Flag An Official Website of the United States Government