You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. GRAPHICS POST PROCESSORS FOR TSARAND DYNA-METRIC LOGISTICS MODELS

    SBC: Verac Inc.            Topic: N/A

    N/A

    SBIR Phase I 1986 Department of DefenseAir Force
  2. ACUTE MYOCARDIAL INFARCTION ACCOUNTS FOR APPROXIMATELY 700,000 HOSPITALIZATIONS ANNUALLY.

    SBC: Vestar, Inc.            Topic: N/A

    ACUTE MYOCARDIAL INFARCTION ACCOUNTS FOR APPROXIMATELY 700,000 HOSPITALIZATIONS ANNUALLY. ONE THERAPEUTIC APPROACHTO THIS PROBLEM IS THE APPLICATION OF THROMBOLYTIC AGENTS, SUCH AS STREPTOKINASE, TO PRODUCE REPERFUSION OF THE ISCHEMIC MYOCARDIAL TISSUE. UNFORTUNATELY, RECENT EXPERI- MENTAL EVIDENCE INDICATES THAT IRREVERSIBLE CELLULAR DAMAGE OCCURS WHEN ISCHEMIC MYOCARDIUM IS REPERFUSED WITH OXYGE ...

    SBIR Phase I 1986 Department of Health and Human Services
  3. STUDY

    SBC: VISTA Controls Corporation            Topic: N/A

    THIS STUDY WILL EXAMINE THE CONCEPTS INVOLVED IN ENHANCING THE OPERATION OF THE INTEGRATED SMART ARTILLERY SYNTHESIS (ISAS) ROBOTIC AMMUNITION HANDLING SYSTEM, AND WILL DEFINE THE TECHNOLOGY REQUIRED TO IMPLEMENT SUCH A SYSTEM. THE PROPOSED SYSTEM WILL CONSIST PRIMARILY OF AN ELECTRONIC CONTROL UNIT AND DATA BUS TO PROCESS INFORMATION ON SYSTEM STATUS DATA AND CLOSED-LOOP CONTROL PARAMETERS, AND I ...

    SBIR Phase I 1986 Department of DefenseArmy
  4. APPLICATION OF ROBOTIC VISION IN A WEAPON SYSTEM-FEASIBILITY STUDY

    SBC: VISTA Controls Corporation            Topic: N/A

    N/A

    SBIR Phase I 1986 Department of DefenseArmy
  5. IMPROVED HIGH ANGLE OF ATTACK CONTROLLABILITY THROUGH VORTEX MANIPULATION

    SBC: Visual Aerodynamics/eidetics I            Topic: N/A

    THE OBJECTIVE OF THE PROPOSED STUDY IS TO TEST THE FEASIBILITY OF A UNIQUE AND INNOVATIVE AIRCRAFT CONTROL CONCEPT. THE CONCEPT INVOLVES USING SMALL PNEUMATIC OR MECHANICAL DEVICES TO MANIPULATE THE ORIENTA-TION, TRAJECTORY AND BREAKDOWN CHARACTERISTICS OF THE DOMINANT VORTEX SYSTEM THAT DEVELOP ON TYPICAL FIGHTER AIRCRAFT AT HIGH ANGLES OF ATTACK. IT IS BELIEVED THAT THIS CONCEPT CAN HARNESS THE ...

    SBIR Phase II 1986 Department of DefenseAir Force
  6. INNOVATIVE PERFORMANCE AND MANEUVERABILITY MEASURES OF MERIT FOR AIR COMBAT

    SBC: Visual Aerodynamics/eidetics I            Topic: N/A

    CURRENT PERFORMANCE MEASURES OF MERIT DO NOT CHARACTERIZE MANEUVERS REQUIRED BY FIGHTERS TO BE EFFECTIVE WHEN USING ALL-ASPECT, SHORTRANGE MISSILES DURING AIR COMBAT. POINT PERFORMANCE COMPARISONS AND SUSTAINED PERFORMANCE COMPARISONS ARE NOT ADEQUATE INDICATORS OF A FIGHTER'S ABILITY TO MANEUVER TO ADVANTAGE. NEITHER COMPARISON ACCOUNTS FOR THE EFFECTS OF TIME COMPRESSION ON MANEUVERS, NOR ADDRES ...

    SBIR Phase II 1986 Department of DefenseAir Force
  7. DIFFERENTIAL PRESSURE TRANSDUCER

    SBC: West Coast Research Corporation            Topic: N/A

    AN EXPLORATORY DEVELOPMENT TO PROVIDE FOR DIFFERENTIAL PRESSURE MEASUREMENT INTEGRAL WITH DIAGNOSTIC CONNECTOR ASSEMBLIES (DCAS) IS DESCRIBED. EMPHASIS WILL BE PLACED ON MINIATURE STRAIN GAGE TRANSDUCERS BASED ON SEMICONDUCTOR TECHNOLOGY AS WELL AS STANDARD FOIL GAGE INSTALLATIONS. FROM A RELATIVELY LARGE LIBRARY OF SPECIAL DESIGNS FOR MINIATURIZATION AND COMPLEX CONFIGURATIONS, THE OFFEROR PROPOS ...

    SBIR Phase II 1986 Department of DefenseArmy
  8. CONTINUOUS MONITORING OF TRUCK LOAS ARE TEHREATED BY STATE- OF-THE-ART MEASUREMENT TECHNIQUES.

    SBC: West Coast Research Corporation            Topic: N/A

    CONTINUOUS MONITORING OF TRUCK LOAS ARE TEHREATED BY STATE- OF -THE-ART MEASUREMENT TECHNIQUES. MONITORING MAY BE EITHERREMOTE OR RECORDED FOR LOCAL INSPECTION. IT IS PROPOSED TO INSTALL STRAIN GAGE LOAD CELLS AT THE SALIENT LOCATIONS OF THE LOAD SUPPORT STRUCTURE OF TRUCKS AND PROVIDE APPRO PRIATE SIGNAL CONDITIONING IN A SECURE MODE TO RECORD OR TRANSMIT THE VEHICLE LOAD STATUS. THE RECORDING OR ...

    SBIR Phase I 1986 Department of Transportation
  9. SPARTA, INC.

    SBC: X2y2 Corpon            Topic: N/A

    SPARTA, INC. PROPOSES TO STUDY OUTSTANDING ISSUES REQUIRING RESOLUTION BEFORE AN EXPERT SYSTEM CAN BE DESIGNED FOR STRUCTURAL/ MECHANICAL MANUFACTURING PLANNING. THE KEY ELEMENTS OF SUCH AN EXPERT SYSTEM WOULD BE: (1) A GEOMETRIC MODELER CAPABLE OF DESCRIBING GEOMETRY IN TERMS OF PART FEATURES, AS WELL AS NON-GEOMETRIC INFORMATION; (2) AN ARTIFICIAL INTELLIGENCE PROCESSOR; (3) A MANUFACTURING PLAN ...

    SBIR Phase I 1986 Department of DefenseNavy
  10. HIGH PERFORMANCE POROUS MATERIALS

    SBC: Xemet, Inc.            Topic: N/A

    A MODULAR APPROACH TO THE DESIGN OF A POROUS SURFACE CONSISTING OF AS MANY AS 43,776 CAPILLARIES PER SQUARE FOOT, FOR BOUNDARY LAYER CONTROL IS PROPOSED. THE ELEMENTS OF THE SURFACE COMPRISE UNIQUE STAINLESS STEEL CAPILLARY STRUCTURE INSERTS AND A RECEIVING SURFACE OF PERFORATED STAINLESS STEEL PLATE DESIGNED TO EXACTLY MATCH AND LOCK THE INSERTS IN PLACE. THE POROUS SURFACE IS STRONG, CORROSION R ...

    SBIR Phase II 1986 Department of DefenseNavy
US Flag An Official Website of the United States Government