You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. DEVELOPMENT OF MONOETHYLARSINE AS A SUBSTITUTE FOR ARSINE IN THE MOCVD PROCESS

    SBC: Spire Corporation            Topic: N/A

    MOCVD IS A UNIVERSALLY ACCEPTED EXPITAXIAL PROCESS FOR THE DEPOSITION OF COMPOUND SEMICONDUCTORS. IN FACT, MANY PRODUCTION FACILITIES ARE IN OPERATION. PRODUCTS INCLUDE MICROWAVE AND MILLIMETER WAVE INTEGRATED CIRCUITS (MMICS), LASER DIODES FOR COMPACT DISC PLAYERS, PHOTOCATHODES FOR NIGHT VISION GOGGLES, AND GALLIUM ARSENIDE AND INDIUM PHOSPHIDE SOLAR CELLS. THE CRITICAL WEAKNESS OF THE MOCVD TEC ...

    SBIR Phase I 1990 Department of DefenseDefense Advanced Research Projects Agency
  2. Low Cost Thin Film Electroluminescent Heat Mounted Displays

    SBC: Spire Corporation            Topic: N/A

    Spire and its subcontractor, Westinghouse/Norden Systems, propose development of color, thin film electroluminescent (TFEL) head mounted displays (HMDs) using passive matrix addressing and indium bump-bonded drive electronics. Passive matrix addressing vastly simplifies fabrication and improves manufacturing yields by decreasing the number of high voltage drive transistors required for display op ...

    SBIR Phase I 1996 Department of DefenseDefense Advanced Research Projects Agency
  3. MOCVD FOR LOW-COST TFEL FLAT PANEL DISPLAY MANUFACTURE

    SBC: Spire Corporation            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of DefenseDefense Advanced Research Projects Agency
  4. KNOWLEDGE-BASED REPLANNING IN RESOURCE CONSTRAINED ENVIRONMENT

    SBC: System Planning Corp.            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of DefenseDefense Advanced Research Projects Agency
  5. Broadband CDMA for Overlaid Cellular PCS

    SBC: Tma Joint Venture            Topic: N/A

    A demonstration of Broadband Code Division Multiple Access (CDMA) for PCS communications overlaid in the 800 MHz AMPS cellular band will be conducted. Broadband CDMA using direct sequence spread spectrum has significant military advantages of jamming immunity and low probability of intercept. It is also the most promising of the new concepts for high capacity commercial cellular radio because of ...

    SBIR Phase I 1996 Department of DefenseDefense Advanced Research Projects Agency
  6. Simulation-Based Design for Large Complex COTS Based Systems

    SBC: TRIDENT SYSTEMS LLC            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of DefenseDefense Advanced Research Projects Agency
  7. Simulation Based Design for Large Complex COTS Based Systems

    SBC: TRIDENT SYSTEMS LLC            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of DefenseDefense Advanced Research Projects Agency
  8. A Patterns Based Model for Software Design Rationale Capture

    SBC: Tri-state Research Corp            Topic: N/A

    Capturing the rationale behind decision making in design plays an important role to explain a design, redesign and/or reuse an existing design. Existing design rationale models suffer from the lack of integrating rationale with the design process. The integration is crucial for the domain of software design due to its complexity. A model for design rationale capture and its related knowledge ba ...

    SBIR Phase I 1996 Department of DefenseDefense Advanced Research Projects Agency
  9. A Novel Approach to Model Based Validation of Fault Tolerant Systems

    SBC: Unisoft Consulting Inc            Topic: N/A

    This work offers an innovative approach to predicting system behavior (in terms of reliability and performance) based primarily on the structural characteristics of a formal functional specification. The mechanism for process composition is codified in the CSP-to-Stochastic Petri net (CSPN) toll. CSPN supports systematic specification, automatic translation and subsequent augmentation (e.g., fai ...

    SBIR Phase I 1996 Department of DefenseDefense Advanced Research Projects Agency
  10. DEVELOPMENT OF INSPECTION AND DETECTION TECHNIQUES FOR HIDDEN CAVITIES

    SBC: UTD, INC.            Topic: N/A

    RECENT TREATY NEGOTIATIONS BETWEEN THE US AND THE USSR PLACE LIMITS ON THE SIZE AND LOCATIONS OF NUCLEAR TESTS. THESE LIMITS ARE PERCEIVED AS POTENTIAL INDUCEMENTS FOR THE USSR TO CONDUCT HIDDEN TESTS OUTSIDE THE TREATY REQUIREMENTS. ONE METHOD OF SECRETLY CONDUCTING TESTS WOULD BE TO PERFORM DECOUPLED TESTS IN LARGE HIDDEN UNDERGROUND CAVITIES. THE US MUST BE PREPARED TO QUICKLY AND EFFECTIVELY I ...

    SBIR Phase I 1990 Department of DefenseDefense Advanced Research Projects Agency
US Flag An Official Website of the United States Government