You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
High Energy Density, Low-Cost, High Temperature Capacitors for Hybrid Vehicles
SBC: Sbe Inc Topic: 05Hybrid Electric Vehicles (HEVs) and plug-in Hybrid Vehicles (PHEVs) require advanced technology capacitors, which must have low cost and the ability to operate at 150oC. However, current 150oC film capacitor solutions are expensive and have lower energy density compared to materials that operate at lower temperatures. Polypropylene Film Capacitors represent a potentially cost effective solution ...
SBIR Phase I 2007 Department of Energy -
Small Launch Vehicles (SLV) Technologies
SBC: TOTALLY BENIGN ENTERPRISES INC Topic: AF05027Difficulties in using foreign airbases and airspace are constraining the Air Force from striking high-value, time critical targets. A Small Launch Vehicle (SLV) and Common Aero Vehicle (CAV) that deploys weapons over a target within minutes after being launched from the United States can solve this problem. The SLV can also be used to launch satellites. Wickman Spacecraft & Propulsion Company ...
SBIR Phase II 2007 Department of DefenseAir Force -
A New High-Resolution Method for the Characterization of Heterogeneous Subsurface Environments: Providing Flow and Transport Parameters via the Integration of MultiScale HydroGeophysical Data
SBC: NEW ENGLAND RESEARCH, INC. Topic: 49Historically, remediation efforts at DOE contaminated sites have relied on numerical models to integrate laboratory and field characterization data, predict the fate and transport behavior of contaminant plumes, design remediation protocols to mitigate contaminant migration, and analyze data from field remediation results. Of particular concern is the effect of subsurface heterogeneities and thei ...
SBIR Phase I 2007 Department of Energy -
Advanced Detection of Improvised Explosive Devices (IEDs)
SBC: QUANTASPEC, INC. Topic: AF06113Standoff detectors are required to detect IEDs. These detectectors are needed to save the lives of American soldiers. QuantaSpec has developed patent pending methods for long-range, sensitive, and selective standoff detection of explosives. These methods have already demonstrated sensitive remote detection of explosive vapors under previous efforts. QuantaSpec's multidisciplinary team will dem ...
SBIR Phase II 2007 Department of DefenseAir Force -
Ultra high-resolution scanned linear array light engine
SBC: ALCES Technology, Inc. Topic: AF06340The ultimate goal for near-eye displays is visual acuity-limited resolution across a wide field of view. Alces Technology has a novel light engine, capable of better than 3k x 6k resolutions without tiling, yet maintaining the temporal qualities necessary for fast-jet simulations. This light engine leverages existing technologies and investments by the Air Force for new and novel applications. Und ...
SBIR Phase I 2006 Department of DefenseAir Force -
Sectional Permanent Magnet Generator and Power Electronics for Multi-Megawatt, Direct Drive Wind Turbines
SBC: Distributed Energy Systems Topic: 29Wind power has the potential of supplying a significant percentage of the United States electrical demand at low cost. However, costs of transportation, erection, and repair must be reduced before these systems are competitive with current technology. The large size of multi megawatt turbine components makes transportation from manufacturing facilities to wind sites problematic. Once on site, t ...
SBIR Phase II 2006 Department of Energy -
An Automated Sample Handling Workcell for the SNS Liquids Reflectometer
SBC: Square One Systems Design, Inc. Topic: 23When completed, the Spallation Neutron Source (SNS) will provide unprecedented opportunities for performing groundbreaking neutron science. Two reflectometers are planned for the SNS, one optimized for the measurement of liquid surfaces and the other for the measurement of magnetic materials. The SNS¿s high neutron flux will allow these instruments to collect complete data sets in minutes rat ...
STTR Phase II 2006 Department of Energy -
A Compact Crystal Positioning System for Neutron Diffraction
SBC: Square One Systems Design, Inc. Topic: 23When completed, the Spallation Neutron Source¿s (SNS) multiple beam lines will provide unprecedented opportunities to conduct studies in materials characterization, medical isotope production, and the transmutation of nuclear waste. However, to take full advantage of the greatly reduced data collection times made possible by the SNS¿s high neutron flux, new automated sample changers must be ...
SBIR Phase II 2006 Department of Energy -
An Integrated Support and Alignment System for Large ILC Lattice Elements
SBC: Square One Systems Design, Inc. Topic: 37The manipulators used to support and position lattice elements are critical components of all particle accelerators. The increased use of large superconducting magnets and accelerator modules places ever greater demands on these manipulators. Unfortunately, the performance of these support systems has not kept pace with the advances made in other areas of accelerator technology, resulting in acc ...
SBIR Phase I 2006 Department of Energy -
Rocket Engine Health Management System- Turbopump System
SBC: TURBO SOLUTIONS ENGINEERING LLC Topic: AF05201Turbo Solutions Engineering LLC is providing this proposal for a Phase II Small Business Innovation Research (SBIR) program, to develop a rocket engine health management (REHM) system. The proposed project is a follow-on to Turbo Solutions’ nearly completed Phase I SBIR entitled “Integrated Vehicle Health Management ‘Intelligent Engine’ Turbopump Concept,” (AFRL Contract FA9300-05-M-301 ...
SBIR Phase II 2006 Department of DefenseAir Force