You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. III-V Based Focal Plane Arrays for Video-Rate Terahertz Imaging

    SBC: TRAYCER DIAGNOSTIC SYSTEMS, INC.            Topic: AF08T006

    Owing to a unique set of intellectual property and core expertise, this Phase II team, led by Traycer Diagnostic Systems, will build and characterize a packaged, 16x16 terahertz focal plane array (FPA) for broadband video-rate imaging at frequencies up to 1.3 THz. Traycer’s competitive advantage is based on its record-performing detectors, novel antennas, and array architectures that permit a d ...

    STTR Phase II 2010 Department of DefenseAir Force
  2. Impact of Climate Change on Military Compounds in the Environment

    SBC: Environmental Quality Management            Topic: A09AT024

    This will facilitate the development of remedial approaches for existing facilities and assist in planning new facilities, logistics, and procedures to protect the environment without impairing critical mission functionality. The commercial application will include software distribution and updates.

    STTR Phase I 2010 Department of DefenseArmy
  3. Impact of Climate Change on Military Compounds in the Environment

    SBC: Environmental Quality Management            Topic: A09AT024

    This will facilitate the development of remedial approaches for existing facilities and assist in planning new facilities, logistics, and procedures to protect the environment without impairing critical mission functionality. The commercial application will include software distribution and updates.

    STTR Phase II 2010 Department of DefenseArmy
  4. Improved Calibration of Sensors and Instruments used for Measurement of High Speed Flow

    SBC: Innoveering, LLC            Topic: AF17AT003

    The Air Force is looking to improve calibration capabilities for instruments that measure flow and structure behavior in high speed airflows. Of particular interest is the flow regime where aerothermal effects are present, generally at speeds of Mach 5 and higher. High frequency oscillations in the incoming airflow are critical to the flow development around the vehicle so improved calibration for ...

    STTR Phase II 2019 Department of DefenseAir Force
  5. Improving Analysis of Large Multidimensional Data through Parallel Processing & Explorative Visualization

    SBC: Frontier Technology Inc.            Topic: MDA18T001

    Using a combination of parallel processing and explorative visualization, a new and exciting solution for high-performance visual analysis of large multidimensional data is proposed. Steady volume flows are selected to demonstrate the strategy, methodology, techniques, and functionalities. Virtual Reality (VR) and Augmented Reality (AR) platforms will be adopted to unleash the power of explorative ...

    STTR Phase I 2019 Department of DefenseMissile Defense Agency
  6. Improving the Life Expectancy of High Voltage Components Using Nanocomposite Surface Solutions

    SBC: Pneumaticoat Technologies Llc            Topic: N14AT025

    Moisture buildup on high voltage antenna components can cause electrical shorts that damage system parts and produce communication noise. Not only are significant costs incurred repairing and replacing damaged components, but critical operations communications can be disrupted by these electrical discharges. This STTR proposal will apply hydrophobic and superhydrophobic coatings to antenna compone ...

    STTR Phase I 2014 Department of DefenseNavy
  7. Inferring Social and Psychological Meaning in Social Media

    SBC: SECURBORATION, INC.            Topic: A12aT009

    The rapid ascent and adoption of social media as the dominant form of communication has led to significant analysis challenges. In particular, there is a gap in theoretically informed methods to analyze data mined and collected from social media. One primary cause of this gap is the lack of fusing structural sources of information (e.g. social network topology) with non-structural sources (message ...

    STTR Phase I 2013 Department of DefenseArmy
  8. Inferring Social and Psychological Meaning in Social Media

    SBC: SECURBORATION, INC.            Topic: A12aT009

    The rapid ascent and adoption of social media as the dominant form of communication has led to significant analysis challenges. In particular, there is a gap in theoretically informed methods to analyze data mined and collected from social media. One primary cause of this gap is the lack of fusing structural sources of information (e.g. social network topology) with non-structural sources (message ...

    STTR Phase II 2014 Department of DefenseArmy
  9. Information and Decision Recommender

    SBC: SECURBORATION, INC.            Topic: N14AT024

    A general framework for course of action (COA) recommender systems consists of four primary functional areas : (1) mapping human entered COA into formalized, machine readable knowledge representation; (2) deconstructing COA decision models into relevant features or variables of interest; (3) gathering and routing intelligence related to those features to specific warfighters evaluating COA; and (4 ...

    STTR Phase I 2014 Department of DefenseNavy
  10. Information-based Norms on Flow, Operations, and Traffic Over Networks (INFOTON)

    SBC: ISEA TEK, LLC            Topic: N18AT027

    The Internet of Things (IoT) connects people, data, and "things" (e.g., software, sensors, platforms), facilitating the translation of information into actions. Although naval platforms’ networks and communication suites have evolved significantly in the past few years to support such required connectivity, one of the greatest technical challenges still facing the military community is the proce ...

    STTR Phase I 2018 Department of DefenseNavy
US Flag An Official Website of the United States Government