You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. CROSSED-FIELD WIGGLER

    SBC: MISSION RESEARCH CORP.            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of DefenseMissile Defense Agency
  2. Curriculum on Demand

    SBC: MANAGEMENT SYSTEMS DESIGNERS, INC.            Topic: N/A

    This project will support adult learners who have had difficulty learning from traditional means by providing curricular materials on-demand. It will demonstrate an instructionally sound, cost- effective, user-friendly technology for delivering instruction directly to learners' homes 24 hours a day. Virtually all previous adult education has compromised either convenience or completeness. Learne ...

    SBIR Phase I 1997 Department of Education
  3. Damping Of Aerodynamic Instability With Active Tip Clearance Control

    SBC: SYNCHRONY, INC.            Topic: N/A

    N/A

    SBIR Phase I 1997 National Aeronautics and Space Administration
  4. Database driven 3D Compartment Arrangements

    SBC: Infotech Enterprises, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of DefenseNavy
  5. DATA MANAGEMENT/ANALYSIS TOOLS

    SBC: VIRTUAL TECHNOLOGY CORP.            Topic: N/A

    The Defense Modeling & Simulation Office (DMSO) is in the process of defining a common technical framework for modeling and simulation to promote interoperability and reuse, and has established the High-Level Architecture (HLA) to which all DoD simulation must conform. This decree has led to the need for a modular data management system capable of passively collecting data from an HLA federation ...

    SBIR Phase I 1997 Department of DefenseOffice of the Secretary of Defense
  6. Data Mining and Integration Technologies for Information Exploitation

    SBC: DEUMBRA, INC.            Topic: N/A

    We shall deliver an information exploitation demonstration prototype simulatirsg actual rlata exploitation. Within this prototype we shall deliver five different types of capabilities. The first three capabilities are data mining tools. These tools shall demonstrate the capability of identifying electronic patterns or f ingerprints in data, relationships between data, and visualizations of such ...

    SBIR Phase I 1997 Department of DefenseAir Force
  7. Data Mining Techniques for Plan Sentinel Development

    SBC: DEUMBRA, INC.            Topic: N/A

    We propose a plan sentinel prototype consisting of three components. The first component is the development of a plan mining tool which identifies and computes false or missing assumptions and deviations to plans and time phased tasks. The second component, the annotated database, computes plans which the plan mining tool access and parses into a logical annotated rule set. Finally, MAVIS, a to ...

    SBIR Phase I 1997 Department of DefenseDefense Advanced Research Projects Agency
  8. DECOUPLED PENETRATION ANALYSIS

    SBC: Applied Research Associates, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of DefenseAir Force
  9. 2 DEOXGLUCOSE INGESTION EFFECTS ON SPONTANEOUS

    SBC: EXPERIMENTAL PATHOLOGY LABORATORIES(EPL)            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of Health and Human Services
  10. Deployable Power Distribution System

    SBC: SPACE PROJECTS, LTD.            Topic: N/A

    The objective of this project is to design an enhanced mobile electric power distribution system (EMEPDIS). The new system will be comprised of a single, modularized distribution panel to replace the existing 15kW, 30kW, and 100kW distribution panels. EMEPDIS will utilize light weight construction techniques in the modular design as well as light weight, low cost, armored aluminum cabling t ...

    SBIR Phase I 1997 Department of DefenseNavy
US Flag An Official Website of the United States Government