Awards Information

Reset

The Award database is continually updated throughout the year. As a result, data for the given year is not complete until April of the following year. Annual Reports data is a snapshot of agency reported information for that year and hence might look different from the live data in the Awards Information charts.

Displaying 160781 - 160790 of 162567 results
  1. RADWASTE DISPOSAL DRUM CENTRIFUGE

    SBC: Foster-miller, Inc.            Topic: n/a

    N/A

    SBIR Phase I 1984 Department of Energy
  2. MONOCONE ROCK BIT WITH JETS AT THE TEETH: DESIGN AND TEST

    SBC: Foster-miller, Inc.            Topic: n/a

    N/A

    SBIR Phase I 1984 Department of Energy
  3. GAS STREAMS.

    SBC: Physical Sciences Inc.            Topic: n/a

    RATES WILL BE MEASURED FOR THE ABSORPTION OF HYDROGEN SULFIDE BY THREE SODIUM CARBONATE CONTAINING MINERALS UNDER UNDER SIMULATED GASIFIER EFFLUENT CONDITIONS. THESE MEASUREMENTS WILL ALLOW AN ASSESSMENT OF THESE INEXPENSIVE MINERALS AS DISPOSABLE COMBINED SULFIDE/CHLORIDE SORBENTS. ADDITIONALLY THE MEASUREMENTS WILL PROVIDE NECESSARY DATA FOR EVALUATION OF INTERFERENCES BETWEEN SULFIDE AND CHLORI ...

    SBIR Phase I 1984 Department of Energy
  4. HETEROJUNCTION SOLAR CELLS

    SBC: Poly Solar Inc.            Topic: n/a

    THE USE OF THIN POLYCRYSTALLINE FILMS OF DIRECT GAP SEMICONDUCTORS WITH ENERGY GAP IN THE RANGE OF 1.3-1.7 EV ON A SUITABLE SUBSTRATE IS BELIVED TO BE MOST PROMISING FOR THE FABRICATION OF LOW-COST SOLAR CELLS FOR TERRESTRIAL APPLICATIONS. BECAUSE OF THE DIFFICULTY OF OBTAINING SHALLOW HOMOJUNCTIONS WITH LOW SHEET RESISTANCE SURFACE LAYER IN MANY DIRECT GAP SEMICONDUCTORS, HETEROJUNCTION STRUCTURE ...

    SBIR Phase I 1984 Department of Energy
  5. TITANIUM NITRIDE COATING OF HIGH SPEED STEEL AND CARBIDE METAL CUTTING TOOLS USING FLUID BED FURNACE TECHNOLOGY

    SBC: Procedyne Corp            Topic: n/a

    N/A

    SBIR Phase I 1984 Department of Energy
  6. METHOD FOR HEATLESS PRODUCTION OF FOUNDRY SHELL MOLDS

    SBC: Process Equipment Company            Topic: n/a

    THIS PROJECT RELATES TO THE TOPIC IMPROVED ENERGY AND MATERIAL USAGE IN INDUSTRY. AT THE PRESENT TIME MILLIONS OF SHELL MOLDS ARE PRODUCED ANNUALLY, IN THE U.S. FOUNDRY INDUSTRY BY EXISTING THERMAL PROCESS. THE PROPOSED PROJECT IS BASED ON A NEW U.S. PATIENT NO. 4,311,184 ISSUED IN 1982 (FOREIGN PAT. APPLICATIONS ARE PENDING) AND IS AIMED AT THE DEVELOPMENT OF A COLD SHELL MOLDS PRODUCTION PROCESS ...

    SBIR Phase II 1984 Department of Energy
  7. ASSESSMENT OF 10(14) GATE-HZ/CM(2) CHARGE-MODE LOGIC FOR SUPERCOMPUTERS

    SBC: Q-dot, Inc.            Topic: n/a

    N/A

    SBIR Phase I 1984 Department of Energy
  8. SUNLIGHT IS THE ULTIMATE SOURCE OF ALL FOSSIL FUELS AND BIOMASS.

    SBC: R&a Plant/soil, Inc.            Topic: n/a

    SUNLIGHT IS THE ULTIMATE SOURCE OF ALL FOSSIL FUELS AND BIOMASS. IN LIGHT OF DWINDLING SUPPLIES OF FOSSIL FUELS, BIOMASS WILL BE ACCORDED A GREATER ROLE IN SUPPLYING FUTURE ENERGY NEEDS. TO BEST MEET ANTICIPATED ENERGY NEEDS, THE MOST PRODUCTIVE PHOTOTROPHIC SYSTEMS MUST BE UTILIZED. MICROALGAE ARE THE MOST PRODUCTIVE PHOTOSYNETHETIC ORGANISMS ON EARTH, OFTEN PRODUCING FIVE TO TEN TIMES THE DRY MA ...

    SBIR Phase I 1984 Department of Energy
  9. AN EVALUATION WILL BE MADE TO DETERMINE THE FEASIBILITY OF AND METHODS FOR APPLYING INDUSTRIAL ROBOTIC COMPONENTS TO PERFORM FUSION REACTOR INSPECTION AND MAINTENANCE WORK.

    SBC: Remote Technology Corp.            Topic: n/a

    AN EVALUATION WILL BE MADE TO DETERMINE THE FEASIBILITY OF AND METHODS FOR APPLYING INDUSTRIAL ROBOTIC COMPONENTS TO PERFORM FUSION REACTOR INSPECTION AND MAINTENANCE WORK. THE OBJECTIVE IS TO DECREASE BOTH THE RADIOLOGICAL HAZARDS TO WORKERS AND THE PLANT OUTAGE TIME REQUIRED FOR PERFORMING THE WORK. INCLUDED WILL BE A CHARACTERIZATION OF THE WORK TASKS, SELECTION OF ROBOTIC COMPONENTS AND AN EVA ...

    SBIR Phase I 1984 Department of Energy
  10. LONG, HIGH SENSITIVITY FISSION COUNTER

    SBC: Reuter-stokes Inc.            Topic: n/a

    THE OBJECTIVE OF THE PROPOSED RESEARCH IS THE DESIGN OF A HIGH-SENSITIVITY NEUTRON DETECTOR WITH A SENSITIVE LENGTH OF FIVE TO EIGHT FEET. THE DETECTOR IS A FISSION COUNTER DESIGNED FOR RELIABLE, LONG-TERM OPERATION AT ELEVATED TEMPERATURE AND IN HIGH GAMMA RADIATION FIELDS. THE RESEARCH EFFORT WILL INVESTIGATE THE UTILIZATION OF RECENT ADVANCES IN DETECTOR TECHNOLOGY TO IMPROVE NEUTRON SENSITIVIT ...

    SBIR Phase II 1984 Department of Energy

Agency Micro-sites

US Flag An Official Website of the United States Government