You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. LADAR 3D Change Detector

    SBC: Systems & Processes Engineering Corporation            Topic: A07211

    Systems & Processes Engineering Corporation (SPEC) proposes a LADAR for 3D change detection, consisting of a SPEC miniature LADAR combined with two Hyper X64™, high speed, low power, processors, a GPS and IMU to give a miniature, light weight, low power system capable of detecting small, 50mm changes, while driving down a road at highway speeds. Use of 3D LADAR images eliminate lighting, field ...

    SBIR Phase II 2008 Department of DefenseArmy
  2. Frequency Based SAL Seeker

    SBC: Systems & Processes Engineering Corporation            Topic: A08195

    Systems & Processes Engineering Corporation (SPEC) proposes a frequency based Semi Active Laser (SAL) seeker. Using a ROIC architecture, originally LADAR based, that allows capturing the temporal waveform of the received signal and combining this with a pulse code tracker, allows frequency domain discrimination of spill over designator illumination, foliage pre-target hits, smoke illumination and ...

    SBIR Phase I 2009 Department of DefenseArmy
  3. Explosive Detection System

    SBC: Systems & Processes Engineering Corporation            Topic: A09070

    Systems & Processes Engineering Corporation (SPEC) proposes a man portable explosive hazard detection system composed of 3 subsystems: a miniature class 1 eye-safe LADAR adapted to provide explosive detection and classification through the use of Raman scattering spectroscopy; a 35GHz staring radar with primary and third harmonic cross section measurement capability; and a cell phone detection and ...

    SBIR Phase I 2009 Department of DefenseArmy
  4. Tri-Band Feed/Antenna System and Tri-Band Terminal

    SBC: Target Microwave Llc            Topic: N/A

    This proposal describes a tri-band feed which can be used in rapid deployment, Super High Frequency (SHF) satellite communications termincal. The design provides tri-band capability through the use of coaxial waveguide, a concept which has been used with a high degree of success in other multi-band applications. Previous designs using coaxial waveguide architecture hace demonstrated high efficie ...

    SBIR Phase II 1997 Department of DefenseArmy
  5. Tri-Band Feed/Antenna System and Tri-Band Terminal

    SBC: Target Microwave Llc            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of DefenseArmy
  6. Joining Metals and Ceramics that Exhibit a Large Mismatch in Coefficient of Thermal Expansion

    SBC: TECHNOLOGY INTERNATIONAL INCORPORATED OF VIRGINIA            Topic: N/A

    This proposal for the U.S. Army addresses the challenges of brazing dissimilar materials, initially silicon carbide to titanium alloy Ti-6A1-4V, while achieving the minimum attachment shear strength of 2x (76MPa, 11,000psi) that of epoxy glues. TechnologyInternational, Inc. (TII) recently developed novel microwave and combustion synthesis methods for brazing polycrystalline diamond and tungsten c ...

    SBIR Phase I 2003 Department of DefenseArmy
  7. Adaptable Cognitive Decision Aids For Embedded Weapon Applications

    SBC: TECHNICAL SOLUTIONS, INC.            Topic: N/A

    A heavy mortar platoon providing immediate indirect fire (IF) support to an Infantry or Armor Battalion (BN) generates and processes many time-critical and mission-critical events. The effectiveness of the platoon is directly related to its ability todeliver On Order missions and Final Protective Fires accurately and on-time, while exploiting terrain features providing cover and concealment for su ...

    SBIR Phase I 2001 Department of DefenseArmy
  8. Adaptable Cognitive Decision Aids For Embedded Weapon Systems

    SBC: TECHNICAL SOLUTIONS, INC.            Topic: N/A

    Decision aids, in the perspective of the soldier, exist to assist him in seven distinct operational areas - Plan, Deploy, Detect, Evaluate, Decide, Deliver, and Sustain. These represent

    SBIR Phase II 2001 Department of DefenseArmy
  9. Integrated Remote Battlefield Surveillance System (REMBASS)- AN/PPS-5D Man Machine Interface

    SBC: TECHNICAL SOLUTIONS, INC.            Topic: N/A

    The objective in Phase I will be to develop a Universal Ground Surveillance Controller (UGSC) that is in compliance with the JTA Appendix F, and the Weapon System Technical Architecture Working Group guidance. The UGSC will be fully integrated with FBCB2to be designed such that the integration of additonal sensor suites can be performed in a cost effective and timely manner. The development of t ...

    SBIR Phase I 2002 Department of DefenseArmy
  10. Integrated Remote Battlefield Surveillance System (REMBASS)- AN/PPS-5D Man Machine Interface

    SBC: TECHNICAL SOLUTIONS, INC.            Topic: N/A

    The objective of this effort is to provide a capability for integrating existing and future unattended sensors into a responsive information enterprise that supports real-time targeting in addition to acquisition of reconnaissance data for intelligenceoperations. The proposed Sensor Integration Software Development Kit (SISDK) provides configurable software components for sensor control, display o ...

    SBIR Phase II 2003 Department of DefenseArmy
US Flag An Official Website of the United States Government