List

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for the given year is not complete until April of the following year. Annual Reports data is a snapshot of agency reported information for that year and hence might look different from the live data in the Awards Information charts.

Displaying 172061 - 172070 of 173298 results
  1. MONOCONE ROCK BIT WITH JETS AT THE TEETH: DESIGN AND TEST

    SBC: FOSTER-MILLER, INC.            Topic: N/A

    N/A

    SBIR Phase I 1984 Department of Energy
  2. ENGINE POWERED MAN PORTABLE PERSONAL COOLING SYSTEM

    SBC: FOSTER-MILLER, INC.            Topic: N/A

    N/A

    SBIR Phase I 1984 ArmyDepartment of Defense
  3. DETECTION MONITORING AND ALARM

    SBC: Pcp, Inc.            Topic: N/A

    THIS PROPOSAL CONCERNS THE DESIGN, DEVELOPMENT AND TEST OF A NEW INSTRUMENT FOR THE POINT DETECTION, MONITORING AND ALARM OF CHEMICAL AGENTS UNDER BATTLEFIELD CONDITIONS. THIS NEW INSTRUMENT IS THE TRANDEM ION MOBILITY SPECTROMETER WHICH IS A DUAL MOBILITY SPECTROMETER. THE CONVENTIONAL IMS IS AT PRESENT UNDER DEVELOPMENT BY THE DOD THIS PROJECT WILL RESULT IN IMPROVEMENTS IN THE ABILITY OF ION MO ...

    SBIR Phase II 1984 ArmyDepartment of Defense
  4. TRACK G EROSION DATA APPLICATION/ANALYSIS

    SBC: Pda Engineering            Topic: N/A

    THE EFFECTIVE UTILIZATION OF THE AEDC TRACK G FACILITY TO EVALUATE THE EROSION PERFORMANCE OF REENTRY VEHICLE NOSETIP MATERIALS IN WEATHER ENVIRONMENTS HAS BEEN LIMITED BY A LACK OF INSIGHT INTO PHYSICAL PHENOMENA PECULIAR TO TRACK TESTING. THE PURPOSE OF THE PROPOSED INVESTIGATION IS TO ANALYZE AND MODEL THE IMPORTANT TRACK G EROSION PHENOMENA. THE EFFORT IS DIRECTED TOWARD QUANTIFYING PHENOMENOL ...

    SBIR Phase II 1984 Air ForceDepartment of Defense
  5. THERMAL ANALYSIS OF TRACK G DATA

    SBC: Pda Engineering            Topic: N/A

    CARBON ABLATION DATA OBTAINED IN HIGH PRESSURE ABLATION TESTS (AEDC TRACK G) WILL BE CORRELATED WITH THEORY, INCLUDING POSSIBLE EFFECTS OF MELTING, THE UNCERTAINTIES IN THE ABLATION THEORY THAT ARE CONSISTENT WITH THE GROUND TESTDATA WILL BE DEFINED. THE RESULTS WILL THEN BE USED TO PREDICT THE UNCERTAINTY TO BE EXPECTED IN AN IMPACTOR TECHNOLOGY PROGRAM (ITP) PASSIVE NOSETIP FLIGHT.

    SBIR Phase II 1984 Air ForceDepartment of Defense
  6. ADVANCED ANTENNA WINDOW PERFORMANCE AND REQUIREMENT DEFINITION

    SBC: Pda Engineering            Topic: N/A

    ANTENNA WINDOWS CRITICALLY AFFECT THE PERFORMANCE OF ADVANCED REENTRY SYSTEMS. IN MANY CASES COMPROMISES IN VEHICLE EFFECTIVENESS MUST BE MADE BECAUSE OF WINDOW MATERIAL LIMITATIONS. TO AID IN THE IMPROVEMENT OF WINDOW, AND THEREFORE OVERALL PERFORMANCE, AN ANALYSIS STUDY IS PROPOSED TO (1) EVALUATE THE PERFORMANCE OF CANDIDATE AIR FORCE WINDOW MATERIALS IN A SYSTEM THAT IS TO BE DEPLOYED IN THE N ...

    SBIR Phase II 1984 Air ForceDepartment of Defense
  7. FOUR MAJOR CLASSES OF DIRECTED ENERGY WEAPONS ARE BEING EVALUATED FOR DEFENSE AGAINST ICBMS: CW LASER, PULSE LASER, PARTICLE BEAMS, AND X-RAY LASERS.

    SBC: Pda Engineering            Topic: N/A

    FOUR MAJOR CLASSES OF DIRECTED ENERGY WEAPONS ARE BEING EVALUATED FOR DEFENSE AGAINST ICBMS: CW LASER, PULSE LASER, PARTICLE BEAMS, AND X-RAY LASERS. THE VULNERABILITY AND FIRST-ORDER HARDENING METHODS FOR AN EXISTING U.S. ICBM (PEACEKEEPER) WILL BE IDENTIFIED AND EVALUATED IN THE PROPOSED EFFORT. THE CRITICAL COMPONENTS,THEIR RESPONSE DURING IRRADIATION AND THEIR EFFECT ON OVERALL SYSTEM PERFORMA ...

    SBIR Phase I 1984 Air ForceDepartment of Defense
  8. LASER HARDENED MATERIAL EFFECTS ANALYSES

    SBC: Pda Engineering            Topic: N/A

    N/A

    SBIR Phase I 1984 Air ForceDepartment of Defense
  9. RECYCLING OF DUST FROM ELECTRIC ARC FURNACES

    SBC: Pei Associates Inc            Topic: N/A

    THE MAJOR SHORTCOMINGS OF THE VARIOUS PROCESSES SUGGESTED BY RECYCLING METALLURGICAL DUST HAVE BEEN THE HIGH CAPITAL COST OF THE EQUIPMENT AND THE NEED FOR LARGE QUANTITIES OF DUST FOR THE PROCESSES TO BE ECONOMICAL. ELECTRIC ARC FURNACE DUST IS NOT AMENABLE TO THESE PROCESSES BECAUSE IT IS GENERATED IN SMALL QUANTITIES AND A LARGE NUMBER OF LOCATIONS, DISTANT FROM INDUSTRIAL CENTERS WHERE REGIONA ...

    SBIR Phase II 1984 Environmental Protection Agency
  10. THE INCREASED RELIANCE OF THE POWER INDUSTRY ON U.

    SBC: Pei Associates Inc            Topic: N/A

    THE INCREASED RELIANCE OF THE POWER INDUSTRY ON U.S. COAL RESERVES IS THREATENED BY AN OVERALL DECLINE IN THE DEMAND OF POWER, THE HIGH COST OF FINANCING NEW PLANTS, MORE STRINGENT REGULATORY REQUIREMENTS, AND INEFFICIENT ENERGY RECOVERY AND POLLUTION CONTROL. CONVENTIONAL AND ESTABLISHED EMERGING COAL-FIRED POWER GENERATION TECHNOLOGIES DO NOT APPEAR TO OFFER THE DESIGN TECHNOLOGY BREAK-THROUGH N ...

    SBIR Phase I 1984 Environmental Protection Agency

Agency Micro-sites

SBA logo
Department of Agriculture logo
Department of Commerce logo
Department of Defense logo
Department of Education logo
Department of Energy logo
Department of Health and Human Services logo
Department of Homeland Security logo
Department of Transportation logo
Environmental Protection Agency logo
National Aeronautics and Space Administration logo
National Science Foundation logo
US Flag An Official Website of the United States Government