You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY22 is not expected to be complete until September, 2023.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

  1. Early Warning and Monitoring of Dangerous Biological Materials by Phase-Resolved Fluorescence Spectroscopy

    SBC: Systems & Processes Engineering Corporation            Topic: N/A

    N/A

    SBIR Phase I 1993 Department of DefenseArmy
  2. Thermoelectric Thick Film Technology for Application onto Substrates.

    SBC: Te Technology, Inc.            Topic: N/A

    New advances in Ultra-Supersonic Plasma-Spray technologies present new opportunities for creating a superior thermoelectric (TE) thick-film technology. Via extremely rapid solidification, these processes can maintain the purity and complex stoichemetry of multi-component TE alloy. This process will eliminate the use of solders yielding unprecedented ruggedness and low cost. Unlike sputtering and o ...

    SBIR Phase I 1993 Department of DefenseArmy
  3. Image-Based Terrain Database Generator for Simulation

    SBC: VEXCEL CORP.            Topic: N/A

    N/A

    SBIR Phase I 1993 Department of DefenseArmy
  4. Refined Reduced Order Models for Estimation of Terrain Induced Loads in Flexible Vehicles

    SBC: ANALYTICAL SERVICES & MATERIALS INC            Topic: N/A

    The new aerospace materials are finding applications in the design of military armor vehicles. However, the effect on ride quality, fire control, and internal structural loads due to the increased flexibility of these new vehicles must be ascertained by dynamic analysis. The size of models required to simulate these flexible body effect can be prohibitive from both cost and time perspective. There ...

    SBIR Phase I 1993 Department of DefenseArmy
  5. Synthesis of Nanocrystalline Tungsten Powder

    SBC: MATERIALS MODIFICATIONS INC.            Topic: N/A

    N/A

    SBIR Phase I 1993 Department of DefenseArmy
  6. Automated Design Tool Set for Reliability and Performance Evaluation of Fault-Tolerant Avionics Systems

    SBC: ADVANCED SYSTEMS & TECHNOLOGIES INC            Topic: N/A

    N/A

    SBIR Phase I 1993 Department of DefenseArmy
  7. Accelerated Reliability Testing for Environmental Control Systems

    SBC: Texas Research Institute, Austin, Inc.            Topic: N/A

    Reliability and lifetime performance data for environemntal control systems (ECS) is limited. Real-time tests require 5-15 years, and results often apply only to obsolete technology. Accelerated life testing (ALT) is a means by which reliability data may be obtained quickly and at a reasonable cost. A primary difficulty with ALT of ECS units is that typical service conditions impose multiple stres ...

    SBIR Phase I 1993 Department of DefenseArmy
US Flag An Official Website of the United States Government