You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Solder Plating Process Control
SBC: P C Dynamics Topic: N/AThe objective of this proposal is to develop and implement a scientifically based solderability tester as a process control tool during the fabrication process for printed circuit boards. Using the sequential electrochemical reduction analysis (SERA) process as invented by Rockwell International, data will be gathered to correlate the coulomb density values determined by SERA to current, commercia ...
SBIR Phase I 1993 Department of DefenseArmy -
Bistatic Chaff and Weather Modeling
SBC: Decision-science Topic: N/AIt is proposed to develop a mathematical model for the bistatic signature of chaff, as well as weather (rain and fog). The model will include the full scattering matrix and temporal and spatial amplitude and phase fluctuation statistics. The model will be parametric in such factors as the electrical length of the chaff dipoles, wind turbulence, and radar resolution volumes. DSA proposes to build u ...
SBIR Phase I 1993 Department of DefenseArmy -
A CAD-NDE Translator (CADNET) for the Ultrasonic Inspection of Contoured Ceramic Gas Turbine Components
SBC: KARTA TECHNOLOGIES Topic: N/AThe automated inspection of gas turbine components has proven to be difficult due to their complex geometry. While ultrasonics has demomstrated excellent capabilities in detecting and characterizing the erosion and corrosion on turbine components from the hot effluent gases, it's application details laborious alignment procedures for the ultrasonic transducer during inspection. The need for automa ...
SBIR Phase I 1993 Department of DefenseArmy -
Synthesis of Nanocrystalline Tungsten Powder
SBC: MATERIALS MODIFICATIONS INC Topic: N/AN/A
SBIR Phase I 1993 Department of DefenseArmy -
Low Intensity Conflict Aerosol Munition
SBC: DCS CORP. Topic: N/AAerosol sprays of paint, epoxy, and other substances can be dispensed by mines and other munitions to disable hostile sensors, vehicles, and weapon systesm. For example, a paint-filled aerosol mine could be designed to detect an approaching vehicle, pop into the air, and eject and aerosol mist of opaque, brightly colored, slovent resistive, electrically conductive paint at the vehicle. The resulti ...
SBIR Phase I 1993 Department of DefenseArmy -
Omni-Directional MIcrostrip Antenna on a Soldier's Helmet
SBC: Mahanad Communications, Inc. Topic: N/AOmni-directional microstrip antenna system integrally located on a soldier's helmet for secure and reliable communications in the battlefield is the subject matter of this proposed innovative research. The antenna system consist of (N+1) circular microstrip patch elements integrally located on the soldier's helmet to provide omni-directional coverage with acceptable antenna gain for all positions ...
SBIR Phase I 1996 Department of DefenseArmy -
SERA Tester Application for Process Control
SBC: Colonial Circuits, Inc. Topic: N/AThis effort would develop the laboratory set-up of the solderability tester into a real time statistical process control tool in the manufacture of printed wiring boards. By correlation of SERA test data to copper contamination levels in the solder plating bath; and the application of statistical process control techniques, real time feedback to the plating process would be established.
SBIR Phase I 1993 Department of DefenseArmy