You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Refined Reduced Order Models for Estimation of Terrain Induced Loads in Flexible Vehicles
SBC: ANALYTICAL SERVICES & MATERIALS INC Topic: N/AThe new aerospace materials are finding applications in the design of military armor vehicles. However, the effect on ride quality, fire control, and internal structural loads due to the increased flexibility of these new vehicles must be ascertained by dynamic analysis. The size of models required to simulate these flexible body effect can be prohibitive from both cost and time perspective. There ...
SBIR Phase I 1993 Department of DefenseArmy -
Automated Design Tool Set for Reliability and Performance Evaluation of Fault-Tolerant Avionics Systems
SBC: ADVANCED SYSTEMS & TECHNOLOGIES INC Topic: N/AN/A
SBIR Phase I 1993 Department of DefenseArmy -
Accelerated Reliability Testing for Environmental Control Systems
SBC: Texas Research Institute, Austin, Inc. Topic: N/AReliability and lifetime performance data for environemntal control systems (ECS) is limited. Real-time tests require 5-15 years, and results often apply only to obsolete technology. Accelerated life testing (ALT) is a means by which reliability data may be obtained quickly and at a reasonable cost. A primary difficulty with ALT of ECS units is that typical service conditions impose multiple stres ...
SBIR Phase I 1993 Department of DefenseArmy -
Synthesis of Nanocrystalline Tungsten Powder
SBC: MATERIALS MODIFICATIONS INC Topic: N/AN/A
SBIR Phase I 1993 Department of DefenseArmy -
Personal Navigation and Reporting
SBC: CYBERNET SYSTEMS CORPORATION Topic: N/ADue to the increasing use of technology to plan and implement modern day combat, it is imperative that troop and vehicles deployment and position be known as precisely as possible. Furthermore, the unit commander must be able to quickly plan, transmit, and display friendly and adversarial troop and vehicle locations to coordinate battlefield operations effectively in the heat of battle. In this ef ...
SBIR Phase I 1993 Department of DefenseArmy -
Concept to Control-- Using Virtual Reality to Test UGV Man-Machine Interfaces and to Control UGV Systems
SBC: CYBERNET SYSTEMS CORPORATION Topic: N/AN/A
SBIR Phase I 1993 Department of DefenseArmy -
Reducing Teleoperated System Data/Image Bandwidth Requirements using a Quantitative Model of UGV Operator Focus of Attention
SBC: CYBERNET SYSTEMS CORPORATION Topic: N/AN/A
SBIR Phase I 1993 Department of DefenseArmy